2) Site Visit No.2 -- M.Tech.(Tunnel Engg.) students visited The MMRC, Mumbai
metro package -3, (Colaba to Seepz via Bandra) on 13th of December 2018.
Construction of underground shaft and tunnelling work for Metro Station was in
progress. This project will be completed before June 2021.
3) Lectures of experts from Industry :
Lectures of Mr. Senthilnath, Senior Engineer (Tunnels), Geoconsult Asia Singapore
Pte. Ltd., Singapore on various aspects of tunnelling were organised for our students
on 17th to 18th December 2018.
MIT-WPU students with Mr. Senthilnath, Mr. Senthilnath, Senior Engineer (Tunnels),
Geoconsult Asia Singapore Pte. Ltd., Singapore
4) Tunnelling Asia 2019 Conference on 27-28 February 2019 at Mumbai
Theme of this conference was ‘Underground Facilities for Better Environment and
Safety: Issues and Challenges’. About 300 professionals from various countries such
as Austria, Brazil, Singapore, Hongkong, China, Germany, Malaysia and India
participated in this mega event.
Prof. Tarcisio Celestino, President , ITA and Prof. Jenny Yan, Vice President, ITA
inaugurated Tunnelling Asia 2019 Conference by lighting a lamp.
MIT-World Peace University students met Prof. Tarcisio Celestino, President ,
ITA and Prof. Jenny Yan, ITA Vice President and informed them about various
activities organized at MIT-WPU, Pune, India.