Plinth is the part of the superstructure between the top of the tie beam at the finished

ground level (the top level of the soil surrounding the structure that has been prepared and
levelled prior to construction) and the floor level of the building( the ground floor level inside
the building)
The part of superstructure of the building between the ground level and floor level is
called Plinth . Formation level is prepared ground on which a sub base layer is laid is
the level at which excavation ceases and construction starts. It is the lowest point of the path
structure.Aug 18, 2017

Natural ground level (N.G.L):-


Natural ground level is termed as Level of the ground. The height of Natural
ground level (NGL) is generally measured with Mean-sea level.Sep 21, 2017
Generally, damp proofing keeps moisture out of a building where vapor barriers keep interior
moisture from getting into walls. ... A damp-proof course (DPC) is a barrier through the structure
designed to prevent moisture rising by capillary action such as through a phenomenon known
as rising damp.