M N Dastur Design Failures points

S.No Description of work

1 Filter feed pumps Y type strainers fouling with Foundation

2 Fire water pumps Y type strainers fouling with foundation

3 Flow meter not provided in recirculation line to check pump capacity

No proper location provided in drawing for hydrant points provided in


4 adminstration building
Fuel piping elevations & pumps access ways for easy movement &
5 maintenance

6 trestile 1A provided Platform on the top in drawing and no access and no


proper reason provided for the platform.

7 LSHS & HSD Tank farm Dyke protection not provided in any drawings

8 LSHS tank staircase design

HSD Tank Foam pourer nozzle must be 100 NB instead it is provided 65 NB in


9 tank.
Spray system is not provided for both the tanks and not provided in any
10 drawings
Diesel & electric Fire water pumps foundations doesnt have pockets for
11 pump foundation bolts to be placed
Diesel & Electric Fire water pumps suction center line is not matching with
12 Suction header center line.
ailures points

Area Contractor

Water Treatment Plant Super technicians

Fire water pump house METEC

Fire water pump house METEC

Admin Building METEC

Fuel pump house Raychem

Fuel pump house Raychem

Fuel packing system M N Dastur

Fuel packing system Raychem

Fuel packing system Raychem

Fuel packing system M N Dastur

Fire water pump house METEC

Fire water pump house METEC