Dona Josefa, Palayan City, Nueva Ecija: Proposed St. Paul Chapel Renovation
Dona Josefa, Palayan City, Nueva Ecija: Proposed St. Paul Chapel Renovation
Dona Josefa, Palayan City, Nueva Ecija: Proposed St. Paul Chapel Renovation
1.
2.
OVERWIEW Page 1
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
OVERWIEW Page 2
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
OVERWIEW Page 3
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
OVERWIEW Page 4
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
D-1300 FORMWORK/SCAFFOLDING/SHORING
87.0 lm D-1310 COLUMNS 0.3 1076 Php/lm 28,095
58.0 lm D-1320 BEAMS 0.3 845 Php/lm 14,708
98.0 lm D-1330 STAIRS 0.3 381 Php/sqm 11,214
0.0 lm D-1340 SUSPENDED SLAB 0.1 2790 Php/sqm 0
SUBTOTAL Php 54,017
TOTAL: STRUCTURAL WORKS ( materials ) 259,059
15%
LABOR 0.45 116,577
TOTAL 375,636 22.19%
OVERWIEW Page 5
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
WATER PROOFING
0 sqm. 1. SURFACE PREPARATION 40 Php/cum 0
0 sqm. 2. CEMENTITIOUS COMPOUND 140 Php/cum 0
SUBTOTAL Php 0
LABOR 0.3 0
0.00%
OVERWIEW Page 6
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
ELECTRICAL WORKS
1 lot 1. LIGHTING FIXTURES 57600 Php/lot 57,600
1 lot 2. SERVICE ENTRANCE SET 5500 Php/lot 5,500
1 lot 3. PANEL BOARD 2500 Php/lot 2,500
1 lot 4. CONVENIENCE OUTLET 2351 Php/lot 2,351
1 lot 5. SWITCHES 2699 Php/lot 2,699
1 lot 6. WIRINGS 36 Php/lot 36
SUBTOTAL Php 70,686
LABOR 0.25 17,672
5.22%
PLUMBING WORKS
1 lot 1. PLUMBING FIXTURES 23000 Php/lot 23,000
OVERWIEW Page 7
Arch. W.Marc Bawayan[Nueva Ecija Projects] October 6, 2016
GRAND TOTAL
MATERIAL 1,209,019
LABOR - regular manpower 400,330
Machineries and Equipment Rentals 0
Tech. Supervision/Proj. Management Exp 42,316
Mobilization/
Contingency 16,093
TOTAL PROJECT COST
CONTRACT DOCUMENTS 25,016
TOTAL PROJECT COST
P1,692,774
Prepared By
OVERWIEW Page 8