The Industry’s Green solution for generating

up to 80% Savings in Operating Costs!


© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
What is the best material
Click tosolution
handling edit Master
today? title style

Heavy Rail Truck Haulage Conveyors


• Large infrastructure • Expensive to operate? • Difficult terrain a problem?
costs? • Emission concerns? • Too many transfer points?
• Need flexibility? • Fuel costs? • Parts / Maintenance?
• Labor issues? • Need flexibility?
• Safety?
railveyor.com 2
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail-Veyor
Click to isedit
the answer!
Master title style

9-Mar-18 railveyor.com 3
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail-Veyor
Click to Timeline
edit Master title style
Rail-Veyor is Born Rail-Veyor Infancy Rail-Veyor Matures Ready for the World
3rd generation
Rail-Veyor® Contract is
Rail-Veyor Systems designs are signed with AGNICO
(RVS) is founded Risto Laamanen VALE S.A. finalized for AGNICO EAGLE
and first Rail-Veyor® creates Rail-Veyor installs 2nd improved EAGLE for starts mine
system developed Technologies (RVT) generation reliability, new 3 km production
at Florida Inst. of and acquires Rail-Veyor® at efficiency and
RVTG is underground using
Phosphate marketing rights to Risto passes it’s Copper
Research recapitalized reduced costs system Rail-Veyor
USA & Canada unfortunately Cliff 114 mine

1999-2003 2004-2006 2007 2008 2009 2010 2012 2013 2014 2015 2016 2017

RVS markets HARMONY Demonstration RVT restructures VALE S.A. Rail-Veyor® Contract Contract
RV technology GOLD installs site near and acquires sets records in Becomes with with DOE
in Indonesia, the first Sudbury is marketing rights underground commercially MAROIL in RUN in
RSA, USA and commercial commissioned worldwide as mine ready to be Missouri
your material Venezuela
Canada underground Rail-Veyor advancement
handling for 4.2 km for 3.4
system in South Technologies with
Global (RVTG) Rail-Veyor® Solution surface mile U/G
Africa
system system

© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved


What is Rail-Veyor?
Click
Can be ato editofMaster
variety title
configurations style
Shuttle
Loading Unloading
Point Point

Shuttle w/ bypass sidings


Loading Unloading
Point Point

Loop
Loading Unloading
Point Point

railveyor.com 5
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail
ClickCarsto edit Master title style
New generation lighter weight
structural cars are now available
which allow for increased loading
and greater efficiency

railveyor.com 6
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail Cars
Click to
(Cont.) edit Master title style
Designs for
30” (.762m)
and
48” (1.22m)
width cars are
now available

railveyor.com 7
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Track
ClickRail
to&edit
Ties Master title style
The Rail-Veyor track can
easily be installed on a lightly
ballasted route with rail and
steel ties making up the track
system.

The route along an existing


truck route, mine drift or
over a quarry floor will make
an ideal base to support the
system’s light footprint with
a load of only 8 lbs/sq inch.

railveyor.com 8
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Track
ClickRail
to&edit
Ties (Cont.)
Master title style

railveyor.com 9
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Track
ClickRail
to&edit
Ties (Cont.)
Master title style

railveyor.com 10
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Track
ClickSwitch
to edit Master title style
Track
Switch

railveyor.com 11
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Drive
ClickStations
to edit Master title style
Both Vertical and Horizontal Drive
Stations are available. Horizontal
drives are well suited where
overhead clearance may be an
issue

New steel bases


require no concrete
railveyor.com 12
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Drive Stations
Click
and to edit
Changes Master
in Grade title style

9-Mar-18 railveyor.com 13
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Drive Station
Click toControl
Electrical edit Master
Cabinets title style

Drive stations are controlled using


latest VFD technology.

Regenerative drives are available


for loaded downhill operation.
railveyor.com 14
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Loading
Click to edit Master title style
Loading of Rail-Veyor can be
with a variety of methods
from a simple overhead
hopper/chute, a pan feeder
or a discharge conveyor.

Loading rate and train speed


can be matched to optimize
material flow.

15
railveyor.com
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Mobile Loading
Click to editExamples
Master title style

railveyor.com 16
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Material
Click toSizeedit Master title style

Can we handle oversize?


YES WE CAN … but to a point!

railveyor.com 17
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Unloading
Click to edit Master title style
Material can be unloaded from
the Rail-Veyor train by inverting
the train over a dump loop and
then re-inverted and directed
back to the loading point.
180 Degree Loop

360 Degree Loop

railveyor.com 18
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Unloading
Click to (Cont.)
edit Master title style

Movable Dump Loop

360o Dump Loop

railveyor.com 19
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Unloading
Click to (Cont.)
edit Master title style

railveyor.com 20
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Crossings
Click to edit Master title style

Rail-Veyor is able to cross


under roads with minimal
impact to road structure by
utilizing metal or concrete box
culverts.

railveyor.com 21
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Clearance Diagram
Click to edit Master title style
Bypass (Single Station)

© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved


Clearance Diagram
Click to edit Master title style
Bypass (Single Station + Track)

© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved


Clearance Diagram
Click to edit Master title style
Bypass (Adjacent Stations)

© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved


Clearance Diagram
Click to edit Master title style
Bypass (Track Only)

© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved


Control
Click to/ Monitoring Stationtitle
edit Master style
The Rail-Veyor system is fully
automated and can be
monitored / controlled from
a fixed station or mobile
tablet depending on
customer preference

railveyor.com 26
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
PLC’s
Clickand
toControl Software
edit Master title style

Master One Master PLC at Control Center


Example:
PLC Programmed with unique site specific code

PLC PLC PLC PLC PLC


5 PLC’s located along R-V Route
All 5 programmed the with same code
for all R-V installations

~18 D/S ~18 D/S ~18 D/S ~18 D/S ~18 D/S Total 90 Drive Stations
PLC’s PLC’s PLC’s PLC’s PLC’s Each with a PLC
All programmed the with same code
for all R-V installations

railveyor.com 27
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail-Veyor
Click to Facts
edit&Master
Guidelinestitle style
Optimum System Application Guidelines:
Generally more than 2/3 mi. (1 km) haulage distance
Generally more than 1M tons (0.9M tonnes) per year (Less for underground)

Material Size:
30” (762mm) car width will generally accommodate 24” (610mm) material size
48” (1219mm) car width will generally accommodate 36” (914mm) material size
Above may depend on material size distribution percentages

Curve ability:
100 ft (30 meter) radius min horizontally
16.5 ft (5 meter) radius min vertically

Grade ability:
R-V is proven on grades up to 22%.
Can go higher as there is no vibration to cause material rollback.

Maximum Train length


Technically there is no limit but it is usually determined by system layout (loops,
sidings), and loading requirements
railveyor.com 28
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail-Veyor
Click to Facts
edit&Master
Guidelinestitle style
System Tonnage Rates:
System rates up to 10,000 tons (9,000 tonnes) per hour are possible and are
generally determined by loading system limitations.
These high or higher tonnage rates may require multiple systems.

General System Speeds:


Loading speed 5 ft./sec, 3.35 MPH (1.5m/sec, 5.4 KPH)
Tramming speed 20 ft/sec, 13.4 MPH (6.0m/sec, 21.6 KPH)
Dumping speed 10 ft/sec, 6.7 MPH (3 m/sec, 10.8 KPH)
Above are guidelines which depending on overall system TPH requirements are
optimized

Easy Portability ( Relocate / Extend):


Ability to install or relocate a drive station in less that one 8 hour shift

Rail-Veyor has a simple light footprint:


Only 8 PSI load with small level roadway needed with 2” (5cm) gravel base
6 ft (1.8m) wide (just track), 15 ft (4.5m) wide (at drive station)

9-Mar-18 railveyor.com 29
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Underground Application
Click to edit MasterBenefits
title style
• Rapid Mine Development (2 to 4
times faster!)
• Low OPEX … Reduced Energy
Requirements
• Green Technology …No
Emissions
• Reduced demand on Ventilation
• Reduced personnel
• Reduced Vehicle Collisions
• Reduced Accidents
• Integrates with existing systems
• Expands along the working face
• Easily travels 22% grades
• 100 ft (30m) horizontal turning
radius

9-Mar-18 railveyor.com 30
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Surface
Click toApplication Benefits title
edit Master style

• Low Life cycle costs …. Lowest OPEX


compared to trucks and conveyors
• Highly efficient steel wheels on steel rail
• Green Technology eliminates dependency
on diesel fuel
• No transfer points like conveyors
• Low Profile - Crosses under roads easily
• Easily travels 22% grades
• 100 ft (30m) horizontal turning radius
• Variable or consistent speeds
• Flexibility to easily relocate or expand
• Eliminates dust & road maintenance issues

9-Mar-18 railveyor.com 31
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Rail-Veyor / Trucks / Conveyors
Click to edit
COMPARISON Master title
SUMMARY style
RAIL-VEYOR (Typical Example)
General cost basics:

OPEX
 10-20% of Trucks
 80% of Conveyors

CAPEX
 Similar to Trucks
 50% of Conveyors

Criteria Rail-Veyor Trucks Conveyors


LIFE CYCLE COSTS $$ $$$$$$$$$$ $$$
INFRASTUCTURE PORTABLE AND LIGHT HEAVY ROADWAY PERMANENT
OPERATION TOTAL AUTOMATION LABOR DEPENDANT CONTINUOUS ON/OFF
MAINTENANCE INSPECTION BASED LABOR INTENSIVE PARTS FALLOUT

9-Mar-18 railveyor.com 32
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Benefit Examples
Click to studies)
(Customer edit Master title style
3.1 Miles (5km)
1.5M Ton / Year
Underground System

Rail-Veyor® CAPEX
• 45% lower than
Conveyor
• Comparable to Trucks

Rail-Veyor® OPEX
• Over 80% lower than
conveyor
• Over 90% lower than
trucks

9-Mar-18 railveyor.com 33
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Benefit Examples
Click to studies)
(Customer edit Master title style

Large 32,000 T / day operation studied:


• Rail-Veyor® CAPEX significantly better than conveyors!
• Rail-Veyor® OPEX Half of Conveyors …. A third of Trucks!
9-Mar-18 railveyor.com 34
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Benefit Examples
Click to studies)
(Customer edit Master title style

9-Mar-18 railveyor.com 35
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Endorsements
Click to edit Master title style
COALTECH (South Africa)
TRANSPORT
INVESTIGATION

Coal Haulage Study On


Rail-Veyor® Material
Handling
Versus Conveyors

“ The most surprising outcome of this


research, however, is the
comprehensively competitive
possibilities of the Rail-Veyor®
system,
which proved to be the only
technology
that was competitive under
every single scenario.”

9-Mar-18 railveyor.com 36
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Endorsements
Click to edit Master title style

9-Mar-18 railveyor.com 37
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Endorsements
Click to edit Master title style

9-Mar-18 railveyor.com 38
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Endorsements
Click to edit Master title style

9-Mar-18 railveyor.com 39
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Installations
Click to edit - Summary
Master title style
Install Site Reasons for choosing Rail-Veyor
2007 Harmony Gold To replace underground trucks at a lower operating cost. Still in
– So. Africa service.
2008 Rail-Veyor Test For continued demonstration and reliability testing to prove out
Site - Sudbury new design improvements.
2011 VALE 114 Test to prove a quicker way of mine development in reaching
Nickel Mine underground deposits by replacing traditional trucks. Mine is
- Sudbury closed now after successful test and plans are to relocate and
reuse the Rail-Veyor equipment.
2017 Agnico Eagle To prove a way to extend the mine by reducing trucks
Goldex Mine which improved mine ventilation and safety. Also because R-V
– Val-d’Or could curve they could optimize the route with no need to go
Quebec straight as with conveyors.
2017-18 Maroil To replace a high maintenance unreliable conveyor system to
- Venezuela move Pet Coke to a port from various pile locations and do it
safely with reduced fire risk and environmental impact.
2018 Doe Run As a proof of concept to reduce costs and eliminate higher cost
9-Mar-18- Missouri truck operation. First step for various other planned installations.
railveyor.com 40
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Installations
Click to edit Master title style
Harmony Gold Phakisa Mine Project
South Africa 2007

• First generation design with over 10


years in operation!
• 4.7 km long underground tram one way
• Operates in a vertical loop configuration
with 3 trains
• Slight downgrade loaded haul between
two shafts
• 4M Tonnes /year (300 TPH)

CEO 2013 comments: “The Rail-Veyor is


cheaper and safer than using trucks or conveyor
belts to transport ore, since electricity
consumption is minimal and it is driverless. And
it is simple to use, and easy to repair and
maintain.”
9-Mar-18 railveyor.com 41
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Installations
Click to edit Master title style
Rail-Veyor®
Sudbury 2008

Demonstration
& Test Site

• 750 m test loop


with over 30,000
circuit cycles
completed

• Dump loop with re-


invert and re-load
capability

• Site has been


used for extensive
testing and latest
development of
equipment
9-Mar-18 railveyor.com 42
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Installations
Click to edit Master title style
Vale Copper Cliff Mine 114 Ore Body
2011
Installed in 6 months!

• 1 km haulage distance
• Shuttle style operation
• 15% gradient uphill haul
• 1 train 432 ft (132m) long
• 26 Drive Stations (100HP x 2 motors)
• Loading Speed – 0.25 to 0.45 m/s
• Dumping Speed – 1.5 m/s
• Travel Speed – 3 m/s
• 15,000 RVT hours injury free
• Achieved 400-470 ft./week of drift development
2 to 4 times faster than traditional methods!

9-Mar-18 railveyor.com 43
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Installations
Click to edit Master title style

9-Mar-18 railveyor.com 44
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
MAROIL Venezuela
Installations
Click to edit 2017-2018
Master title style
MAROIL
4.2 km surface application of petroleum coke being transported to a port ship loading
Venezuela2018
system. Installation currently in process.

Special SS troughs to combat the


corrosive nature of Pet Coke
9-Mar-18 railveyor.com 45
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Installations
Click to edit Master title style
Doe Run Company
Missouri
2017-2018

• Lead ore
underground
mining operation

• 3.4 miles of
winding and fairly
level route through
a long honeycomb
mine system

• Installation is
currently underway

9-Mar-18 railveyor.com 46
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved
Thank
ClickYou
to edit Master title style
Add your new installation to the list!

Questions?

Next steps?

9-Mar-18 railveyor.com 47
© 2018 Rail-Veyor Technologies Global Inc. - All Rights Reserved

You might also like