1. The document outlines the major overhaul process for two steam turbine units and the turbine generator.
2. For the steam turbines, work includes inspection and maintenance of bearings, rotors, diaphragms, valves, governors, and protection systems.
3. For the turbine generator, the rotor is removed and cleaned, insulation is checked, and components like the slip ring and carbon brushes are maintained or replaced.
1. The document outlines the major overhaul process for two steam turbine units and the turbine generator.
2. For the steam turbines, work includes inspection and maintenance of bearings, rotors, diaphragms, valves, governors, and protection systems.
3. For the turbine generator, the rotor is removed and cleaned, insulation is checked, and components like the slip ring and carbon brushes are maintained or replaced.
1. The document outlines the major overhaul process for two steam turbine units and the turbine generator.
2. For the steam turbines, work includes inspection and maintenance of bearings, rotors, diaphragms, valves, governors, and protection systems.
3. For the turbine generator, the rotor is removed and cleaned, insulation is checked, and components like the slip ring and carbon brushes are maintained or replaced.
Major Overhaul for the Steam turbine(2 units) 汽轮机大修
➢To check 1#/2#/3#/4# bearing pad clearance inspection & condition inspection 检查 1 号 2 号 3 号 4 号轴承间隙和状态 ➢Thrust pad clearance inspection&condition inspection. 推力瓦间隙和状态检查 ➢Cleaning the rotor(impellers) and diaphragms 清洁转子(叶轮)和隔板 ➢Check/adjust the clearance of diaphragms, replace labyrinth block if necessary. 检查调整隔板间隙,必要时更换气封块 ➢Check the steam gland and depression center. 检查蒸汽压盖和除化中心 ➢Replace valve plug of main startup steam valve/manipulation seet valve. 更换主启动蒸汽阀/操作阀的阀塞 ➢Check the clearance between the splitting casings after being closed. 关闭后检查分离套管之间的间隙 ➢Maintenance of turning gear device. 盘车装置的维护 ➢Clean up governor system 清理调速器系统 ➢Reinstall diaphragms, bearing&rotor assembly of impeller&record clearance of each stage of impeller against diaphragm 重新安装隔板,轴承,转子组体,记录每个阶段叶轮对隔板的间隙 ➢Check &test all protection turbine system 检查并测试所有汽轮机保护系统 ➢Conduct alignment check and corrections. 进行对齐检查和修正 ➢Check the slid valve, replaced sealing rings for the lifting rod. 检查滑动阀,更换起重杆的密封圈 ➢Check the emergency governor, reset device and flyweight device. 检查紧急调速器,复位装置和飞锤装置 ➢Check the solenoid valve. 检查电磁阀 ➢Check HP&LP oil ejector, replace filter element if necessary 检查 HP&LP 喷油器,必要时更换滤清器元件 ➢Oil filtering and circulation 滤油器和循环 ➢Check the thermal axial displacement and expansion difference metering device 检查热轴向位移和和膨胀差计量装置 ➢Check the static characteristic of the speed governing system 检查转速控制系统的静态特性 ➢Alignment and dynamic balancing. 找正和动平衡 ➢Conduct interlock testing during testing and commissioning 在测试和调试期间进行连锁测试 2. General overhaul for the turbine generator(Complete by turbine overhaul team, 2 unites) ➢Pull out and clean up the generator rotor. 拉出并清理电机转子 ➢Check the situation of air hole, cooling fan, shaft neck and the counterbalance block. 检查气孔,冷却风扇,轴颈及平衡块的情况 ➢Check and clean up the carbon brusher holder, slip ring, lead line, replace the carbon brusher and excitation carbon brush. 检查并清理碳刷架、滑环、引线,更换碳刷机和碳刷 ➢Re-install the rotor and adjust the air clearance. 重新安装转子并调整空气间隙 ➢Grind the slip ring, buckle casing cover and adjust the tightening force of the carbon brusher. 研磨滑环、扣套盖,并调整碳刷的紧固力。 ➢Check the end housing, guard board, gasket of the wind board. 检查风板的端部壳体、护板及垫片 ➢Check the outgoing line and sleeve of the stator winding. 检查定子绕组的出线和套筒 ➢Check the situation of the set screw. 检查固定螺钉的情况 ➢Check the insulation of end winding and clean up. 检查端绕组和清洁的绝缘层 ➢Check the situation of the ventilating ducts and bar. 检查通风管道和 的情况 ➢Check and clean up the fire extinguishing apparatus 检查和清理消防设备 ➢Check and re-set the thermometer. 检查和重新设置温度计