NAME OF PROJECT : EXTENSION OF SECOND FLOOR BALCONY

LOCATION : LOT 127 BLK 18., PRIMEVILLE RESIDENCES ZEN HOUSE CAYPOMBO, SANTA MARIA, BULACAN
OWNER : MERILY GRACE L. KAZAHAYA

BILL OF MATERIALS

I. MATERIALS:

ITEM UNIT QUANTITY UNIT COST AMOUNT


DESCRIPTION

Concrete & Masonry


1 #16mm RSB pcs. 18 250.00 4,500.00
2 #12mm RSB pcs. 16 144.00 2,304.00
3 #10mm RSB pcs. 15 100.00 1,500.00
4 #16 Tie Wire kg. 4 80.00 320.00
5 Cement pcs. 36 200.00 7,200.00
6 Sand truck load 0.25 5,000.00 1,250.00
7 Gravel truck load 0.25 9,500.00 2,375.00
8 CHB 4 pcs. 30 9.00 270.00

TOTAL: 19,719.00

Material Cost : 19,719.00


Labor Cost : 5,915.70
Total Cost : 25,634.70

Prepared By : Engr. Angelo D. Dimla


PRC : 0146586 PTR : 0677702
Place : Santa Maria, Bulacan
Date : 06/19/2018