S02 Site Clearance
S02 Site Clearance
TABLE OF CONTENTS
CONTENTS PAGE
i
Revised on 4 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
2.1 Description
This work shall consist of clearing, grubbing and stripping topsoil in the
areas designated hereunder and/or shown on the Drawings and/or
directed by the S.O. and of clearing only in other areas designated
hereunder and/or shown on the Drawings and/or directed by the S.O., all
as specified herein and as required by the S.O.. The work shall also
include the demolition and disposal of structures in said areas, except
where otherwise provided for in the Contract, as specified herein and as
required by the S.O..
2.1.1 Clearing
Clearing shall consist of the cutting and/or taking down, removal and
disposal of everything above ground level, including objects overhanging
the areas to be cleared such as tree branches, except such trees,
vegetation, structures or parts of structures, and other things which are
designated in the Contract to remain, or be removed by others, or which
the S.O. directs are to be left undisturbed. The material to be cleared
shall include but not necessarily be limited to trees, stumps (parts above
ground), logs, brush, undergrowth, long grasses, crops, loose vegetable
matter and structures (except those structures whose removal or
clearance is otherwise provided for in the Contract). Clearing shall also
include the levelling of obsolete dikes, terraces, ditches, etc., unless
otherwise directed by the S.O..
2.1.2 Grubbing
S2-1
Revised on 4 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
In areas which are to be cleared only, and in which grubbing and stripping
topsoil are not required, the methods of work shall be such as will not
unduly damage the surface vegetation and topsoil, and care shall be
taken not to disturb the topsoil and the root systems of grasses and other
surface vegetation. No topsoil shall be removed from such areas, except
as directed by the S.O., and any topsoil, grasses and other surface
vegetation otherwise removed or disturbed shall be replaced and made
good at the Contractor’s own expense, all to the satisfaction of the S.O..
S2-2
Revised on 4 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
Clearing, grubbing and stripping topsoil shall be carried out to the extents
deemed necessary and approved or directed by the S.O. in areas both
inside and outside the road reserve where channel excavation or other
work is required.
2.2.3 Topsoil
The storage of stripped topsoil for re-use for the soiling of slopes, berms,
verges, central reserves and for the provision of beds for the cultivation of
trees and shrubs shall be to a maximum height of 2 metres and shall on no
account be consolidated or trafficked by heavy machinery. The mounds
shall be hydroseeded in accordance with the specification for hydroseeding,
S2-3
Revised on 4 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
and the grass fertilised and maintained throughout the period of storage.
The topsoil shall be kept free of noxious weeds by removing seedheads
before maturity and by the use of selective chemical weedkillers. The use of
topsoil shall be restricted to surface layers not subject to loading by
pavements or structures.
2.2.4 Timber
The Contractor shall have the right to use unsaleable timber (or saleable
timber when permission is granted in writing by the appropriate
Government Agency or Authority) for his own purposes in connection with
the Contract, always provided that he shall comply with the requirements
of the S.O..
2.2.5 Structures
S2-4
Revised on 4 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
Where burning is not permitted at any time, or the Contractor elects not to
burn unwanted material, combustible material shall be disposed of
together with incombustible material.
S2-5
Revised on 4 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
All existing telegraph poles, lighting columns, traffic signs, guard-rails and
all items of street furniture shall be carefully disconnected and dismantled
and hauled to the Contractor's site compound. The items shall be either
stored in a satisfactory manner for reuse or made available for collection by
the relevant Local Authorities. Embedded items shall be carefully cleared of
all adhering soil or concrete. Holes left by removal of embedded items in
areas of embankment or sites of other permanent works or within 500mm
of the finished subgrade surface shall, within one week be filled with
suitable material and compacted in compliance with the Contract.
Where shown on the Drawings, disused sewer drainpipes and culverts shall
be removed and disposed of. Holes left by removal of sewers, drains, pipes
and culverts in areas of embankment or sites for the permanent works or
within 500mm of the finished subgrade surface shall, within one week be
filled with suitable material and compacted in compliance with the Contract.
S2-6
Revised on 4 Oct. 2011