SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

CONDENSATE EXTRAXTION PUMP ASSEMBLY CLEARANCE

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

BOOSTER BFSP ASSEMBLY CLEARANCE

ROTOR CLEARANCE

MIN NEW RADIAL CLEARANCE MAX RADIAL ALLOWANCE (FINAL


(WITHOUT MACHINING TOLERANCE) - CLEARANCE) - MM
MM
REFFERENCE ACTUAL REFFERENCE ACTUAL
BETWEEN SEAL SPRING AND IMPELLER
ORIFICE

0.3 0.8
BEETWEEN SHAFT SLEEVE AND MECHANICAL
SEAL CASING 1.0 2.0

AXIAL CLEARANCE

REFFERENCE ACTUAL
BETWEEN THRUST BEARING AND THRUST 0.3 ± 0.05 MM
DISC

ADJUSTING VALUE

REFFERENCE ACTUAL
THRUST BEARING DISC RUNOUT 0.015 MM

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

BFSP PUMP ASSEMBLY CLEARANCE

ROTOR CLEARANCE ON DIAMETER

REDUCTIOTION OF "AS NEW" DIFFERENCES ON DIAMETER


REFFERENCES ACTUAL
UP 0.55 MM NONE
0.55 - 0.7 MM BY 0.5 MM
OVER 0.7 MM BY 0.1 MM

TO DETERMINE OF CLEARANCE ON DIAMATER AS FOLLOW :


CLEARANCE : 2XS1=dKB-Dk
CLEARANCE : 2XS2=daB-Da
CLEARANCE ON DIA : 2XS2-2XS1

CLEARANCES ON DIAMETER BETWEEN :

"AS NEW" MINIMUM CLEARANCE MAX PERMISSIBLE FINAL


(WITHOUT MACHINING TOLERANCE) CLEARANCE ON DIAMETER - MM
IN DIAMETER - MM

REFFERENCE ACTUAL REFFERENCE ACTUAL


IMPELLER AND FIRST STAGE CASE WIRING
RING 0.5 1.0
IMPELLER AND CASE WEAR RING, SECOND
STAGE TO FINAL STAGE 0.5 1.0
IMPELLER AND STAGE BUSH 0.45 1.0
BALANCE DISC AND BALANCE DISC SEAT
(THROTLING GAP S1) 0.45 -
BALANCE DISC AND RETAINING RING
(THROTLING GAP S2) 0.5 -
RADIAL BEARING AND SHAFT 0.13 -

CLEARANCE BETWEEN :

REFFERENCE ACTUAL
BALANCE DISC AND BALANCE DISC SEAT
(AXIAL GAP SE)
0.3 ± 0.05 MM
THRUST BEARING AND THRUST BEARING 0.5 MM
PLATE
THRUST BEARING AND THRUST BEARING 0.005 MM
PLATE
TIGHTENING STRETCH OF STUD BOLTS 0.3-0.35 MM

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

BFSP PUMP ASSEMBLY CLEARANCE

SHAFT DEVIATION

REFFERENCE BEFORE AFTER


GAP ALLOWABLE MAIN PUMP
COUPLING AND HYDRAULIC
COUPLING 350
SHAFT DEVIATION MAIN PUMP
COUPLING AND HYDRAULIC
COUPLING -0.2
GAP ALLOWABLE HYDRAULIC
COUPLING AND DRIVEN MOTOR
14
SHAFT DEVIATION HYDRAULIC
COUPLING AND DRIVEN MOTOR
-0.2
CENTER DISTANCE INCREAMENT
ALLOWABLE MAIN PUMP COUPLING
AND HYDRAULIC COUPLING
0.15
CENTER DISTANCE INCREAMENT
ALLOWABLE HYDRAULIC COUPLING
AND DRIVEN MOTOR 0.1

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

BFPT PUMP ASSEMBLY CLEARANCE

RADIAL CLEARANCE

MIN ORIGINAL CLEARANCE IN MAX ALLOWABLE IN RADIAL - MM


RADIAL (WITHOUT MACHINING
TOLERANCE) - MM
CLEARANCE IN DIAMETER DIRECTION

REFFERENCE ACTUAL REFFERENCE ACTUAL


BEETWEEN IMPELLER AND MID SECTION SEAL
RING OF FIRST STAGE 0.5 1.0
BEETWEEN IMPELLER AND SEAL RING FROM
THE SECOND STAGE TO THE LAST STAGE 0.45 1.0
BETWEEN IMPELLER AND GUIDE VANE SLEEVE 0.45 1.0
BETWEEN BALANCING DISC AND BALANCING
PLATE (THROTTLE CLEARANCE S1) 0.4 -
BETWEEN BALANCING DISC AND SUPPORT
RING (THROTTLE CLEARANCE S2) 0.45 -
BETWEEN RADIAL BEARING AND SHAFT 0.12 -

AXIAL CLEARANCE :

REFFERENCE ACTUAL
BETWEEN BALANCING DISC AND BALANCING
PLATE (TROTTLE CLEARANCE SE)
0.5
BETWEEN THRUST BEARING AND THRUST
BEARING DISC
0.6
RUNOUT OF THRUST BEARING DISC 0.005
SHRINK LENGTH OF STUD BOLT 0.3-0.35

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

BFPT PUMP ASSEMBLY CLEARANCE

ALIGNMENT :

ALIGNMENT TOLERANCE : 0.04 MM

POSITION 0 90 180 270


RADIAL
AXIAL A1
AXIAL A2
AXIAL Final reading
Coupling gap 350

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

BOOSTER BFPT PUMP ASSEMBLY CLEARANCE

RADIAL CLEARANCE

MIN NEW RADIAL CLEARANCE MAX ALLOWABLE RADIAL


(WITHOUT MACHINING TOLERANCE) - CLEARANCE (FINAL CLEARANCE) -
MM MM
REFFERENCE ACTUAL REFFERENCE ACTUAL
BETWEEN SEAL RING OF PUMP BODY AND
OPEN RING OF IMPELLER

0.3 0.8
BETWEEN SHAFT SLEEVE AND MECHANICAL
SEAL CASING 1.0 2.0

AXIAL CLEARANCE

REFFERENCE ACTUAL
BETWEEN THRUST BEARING AND THRUST 0.3 ± 0.05 MM
DISC

CORRECTED VALUE

REFFERENCE ACTUAL
RUNOUT OF THRUST BEARING DISC 0.02 MM

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

C3W PUMP ALIGNMENT REPORT

ALIGNMENT

POSITION 0 90 180 270


RADIAL
AXIAL
Coupling gap 450

ALLOWABLE TOLRANCE :
RADIAL : 0.12 RPM : 1485 R/MIN
AXIAL : 0.08

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

VACUUM PUMP ALIGNMENT REPORT

ALIGNMENT

POSITION 0 90 180 270


RADIAL
AXIAL
Coupling gap REF : 4-6 MM ACT:

ALLOWABLE TOLERANCE :
RADIAL : 0.16 RPM : 590 R/MIN
AXIAL : 0.1

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

VACUUM PUMP ASSEMBLY CLEARANCE

TOTAL CLEARANCE, HALF CLEARANCE AND PLAY BETWEEN CONE BEARING

PLAY BETWEEN TWO CONE


TOTAL CLEARANCE HALF CLEARANCE
BEARING
PUMP MODEL (MM) (MM)
(MM)
REF ACTUAL REF ACTUAL REF ACTUAL
CBF 300,310 0.55 - 0.65 0.27 - 0.32 0.18 - 0.22
CBF 360 0.60 - 0.75 0.30 - 0.37 0.20 - 0.24
CBF 400,410, 430 0.70 - 0.90 0.35 - 0.45 0.24 - 0.28
CBF 500, 510, 530 0.80 - 1.00 0.40 - 0.50 0.26 - 0.30
CBF 600, 610, 630 0.90 - 1.10 0.45 -0.55 0.30 - 0.34
CBF 700, 710, 730 1.00 -1.20 0.50 - 0.60 0.34 - 0.40

ADJUSTMENT AXIAL CLEARANCE

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

CWP GAP IMPELLER TO EXTERNAL COLUMN

NO REFERENCE GAP ACTUAL


1 1.2 - 1.5 MM
2 1.2 - 1.5 MM
3 1.2 - 1.5 MM
4 1.2 - 1.5 MM

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

CWP ALIGNMENT REPORT

MOTOR-PUMP COUPLING ALIGNMENT

POSITION 0 90 180 270


RADIAL

ALLOWABLE TOLERANCE :
RADIAL : 0.05 MM

REMARK :

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

GEN STATOR COOLING ALIGNMENT REPORT

MOTOR-PUMP COUPLING ALIGNMENT

PUMP 1 : 10MKFAP001
POSITION 0 90 180 270
RADIAL
1
AXIAL 2
GAP

PUMP 2: 11MKFAP001
POSITION 0 90 180 270
RADIAL
1
AXIAL 2
GAP

REMARK :

DATE : POSITION NAME SIGN


REPORTED BY UJH
APPROVED BY UJH
ACCEPTED BY UJP BSR
UNIT JASA PEMBANGKITAN BANTEN 1 SURALAYA
UNIT BISNIS JASA PEMELIHARAAN
Jl. Aipda KS Tubun No. 8 Jakarta - 11420
Phone: 021-563666 (hunting); Facsimile: 021-5638622
PLTU BANTEN
Email:1msbu@indonesiapower.co.id
SURALAYA MEAN INSPECTION
20 JULI - 30 AGUSTUS 2015

SEAL OIL GENERATOR ALIGNMENT REPORT

MOTOR-PUMP COUPLING ALIGNMENT

PUMP 1 : MKW 11-AP001


POSITION 0 90 180 270 REMARK
RADIAL
AXIAL
GAP
NOTE :
ALLOWABLE TOLERANCE :
RADIAL : 0.06 MM RPM : 1460 R/MIN
AXIAL : 0.04 MM

PUMP 2 : MKW 13-AP001 (DC)


POSITION 0 90 180 270 REMARK
RADIAL
AXIAL
GAP
NOTE :
ALLOWABLE TOLERANCE :
RADIAL : 0.06 MM RPM : 1460 R/MIN
AXIAL : 0.04 MM

PUMP 3 : MKW 15-AP001


POSITION 0 90 180 270 REMARK
RADIAL
AXIAL
GAP
NOTE :
ALLOWABLE TOLERANCE :
RADIAL : 0.06 MM RPM : 1415 R/MIN
AXIAL : 0.04 MM

PUMP 3 : MKW 16-AP001


POSITION 0 90 180 270 REMARK
RADIAL
AXIAL
GAP
NOTE :
ALLOWABLE TOLERANCE :
RADIAL : 0.06 MM RPM : 1415 R/MIN
AXIAL : 0.04 MM

DATE POSITIONNAME SIGN


REPORTED BY UJH DATE : POSITION NAME SIGN
APPROVED BY UJH REPORTED BY UJH
WITNESS BY PLN JMK APPROVED BY UJH
ACCEPTED BY UJP BSR ACCEPTED BY UJP BSR

You might also like