Is Security Clearance
Kaizen Event Title: SOP for ART work generation- Kaizen Required for this kaizen?
Yes No
DBS TOOL(s): Transactional Process Improvement (TPI) Gemba Location: GVRI Mumbai Kaizen Conf Rm: Phoenix Board Room
Submitted by: Pankaj Kumar Mahato Process Owner: Pankaj Kumar Mahato Champion: Rajiv Pathiyil
Team Leader(s): Pankaj Kumar Mahato Team Facilitator(s): Pankaj Kumar Mahato DBSO Event ID#:
Start Date: 13th October 2016 Start Time: 9:30 AM End Date: 14th October 2016 End Time: 6:00 PM
TTI/KPI
PD TTI or DM KPI OWNER: Pankaj Kumar Mahato Reduction of Process time for release of ART work
IMPACT:
PROBLEM SOLVING PROCESS (Kaizen Events Support the DHR PSP - Define the Problem Using "TAGS")
Problem Statement Standard / Goal Actual (Current) Gap Trend Kaizen Goal
1. Currently, there is no process available to follow for ART work preparation. Define a process for ART No Process is available Delay in Release, Revisions 1.Delay in release of Art 1. Generate SOP for ART
2. Input received for Art work is not complete and keeps changing resulting in delay work creation with template today. after release, Communication work. work creation.
and revisions in release of Art work to Operations team. required (If any) from input gap in team 2.Revisions in ART work 2. Identify the templates
3. Planning and manufacturing team do not have the sufficient information to process. to release. release. required (If any) for Input
required.
For planning for material and manufacturing related to customer order processing, the team do not have the right information with them. Some time release process from design team requires more time or requires revisions after release due to change in
requirement or incomplete information of Input. These all effects on execution of customer order.
GEMBA BOUNDARIES
What is IN the Scope? What is NOT in the Scope:
Drawing Release Process definition starts from Input from marketing team till the release for Production with template design(If any required) Process prior to Input from Marketing and after the release of Drawing by design team..
PREWORK REQUIRED for EVENT See "Common Milestones" Tab. WHO WHEN STATUS PREWORK REQUIRED for EVENT (continued) See "Common Milestones" Tab. WHO WHEN STATUS
1. Review Charter with DBSL 2 Weeks PRIOR to Funnel Review. Rajiv 21st Sept 8.
2. Final Review of Charter 2 Weeks PRIOR to Event Start Date. Rajiv 9.
3. SAFETY AUDIT (if Kaizen applicable) Vinod 10.
4. Location finalisation Pankaj 11.
5. Agenda, Standard work sharing Pankaj 12.
6. 13.
7. 14.
See "Common Deliverables"
DAILY ACTION PLAN to Achieve GOALS Tab.
SAFETY/ERGONOMIC AUDITS are REQUIRED if equipment moves, area(s) rearranged and/or new builds (carts, bins, tool holders, etc.) were done during the kaizen. Please contact LANCE MILLER at 336.317.9537 or at x5631 to schedule BEFORE the end of the Kaizen.
TEAM MEMBERS Leader(s): Pankaj Kumar Mahato Facilitator(s): Pankaj Kumar Mahato
1 Abhijeet Mane (Engineering Dept.) 8 Amar Sool (Marketing Dept)
2 Satyabhash Salgaonkar (Engineering Dept.) 9 Ramachandran T (Sourcing Dept)
3 Pankaj Kumar Mahato (Engineering Dept.)
4 Vishnu Kumar (Engineering Dept.)
5 Santosh Narayanan (Master Scheduling Dept.)
6 Govindaraj Subramanian (Master Scheduling Dept.)
7 Devesh Bubna (Product Management Dept.)
Additional Experts Needed Ad Hoc & Reviewers for Kaizen Ideas / Working Documents before REPORT-OUT
First Name Last Name Role First Name Last Name Role
1. 4.
2. 5.
3. 6.
Do any of these changes need to be reviewed by EH&S? Yes No If "yes", please contact LANCE MILLER at 336.317.9537 or at x5631 at least 2 weeks PRIOR to the kaizen.
(Cell Re-layout (moves), Egress, Ergonomic Matters, Proper Tools/PPE and/or Machine Guards)