ACTIVITY / Excavation Activities
SCOPE OF
WORK:
LIST OF MANPOWER
Full Name Position Full Name Position
Ronilo Abiso Backhoe Optr.
Gabriel Saul Foreman
Rowell Bagacina Spotter

WORK SEQUENCE / CONTROLS/RECOMMENDED


POTENTIAL HAZARDS
JOB STEPS SAFE WORK PROCEDURE
 Sub-con Supervisor/
foreman attains and
understands drawings
identifying
underground structures
in the excavation
location including
sewers, oily water and
storm water, firewater,
1.Attain underground  underground utilities, footings, or service water, potable
drawings and excavation foundations are not identified water, electrical,
permit they may be damaged during product lines, and/or
excavation, causing property natural gas mains,
damage, personal injury, or pipelines, etc.,
accidentally shutting down vital foundations and
plant processes causing footings and share this
potential shut down of unit or information with all
units. employees on job
during pre-job planning
and toolbox meetings,
to ensure excavations
will not damage under-
ground utilities or lines
or affect the stability of
any surrounding
buildings, vessels, or
structures
2.Set up machinery for  Machinery is not set up with  Walk down job before
Excavation enough clearance to nearby entering work area with
piping, plant equipment, equipment. Use Tape
structures, overhead obstacles measure and drawings
the equipment may strike the to assure Height
JOB SAFETY
ANALYSIS
equipment causing personal
injury, damage to equipment,
hazards and swing
and possible unit upset. This
radius hazards are
may cause plant interruptions,
eliminated.
shut downs, explosion, injury or
death
 The area around the machinery
is not properly barricaded to  Use proper barricading
keep other people and to assure others
equipment out of the area, cannot enter work area
personal injury or equipment without permission.
damage may occur.
 Inspect machinery
using (Daily Equipment
 Equipment is not in good Inspection Form). If
condition it may breakdown, any abnormalities are,
causing property damage or found tag out of service
possible leaks of hydraulic fluid and notify supervision.
 Make sure equipment
is not leaking
 People stand too close to the  6’ or greater
3.Begin Excavation edge of an excavation; they can excavations require
fall resulting in personal injury. use of Fall Protection
 People are working in the
 4’ or greater depths
excavation; the excavation may
require confined space
present hazards with confined
permits
spaces.
 Spoil pile will be at
least 4 feet from the
edge of the excavation.
 Spoil pile is not placed far
If soil is not suitable to
enough away from the
be used for backfill
excavation there is a potential for
 It will be immediately
it to fall into the excavation and
removed from site and
hit or engulf people.
hauled to a designated
area.

 Workers shall not work


in an excavation or
trench with standing
 Water accumulation in
water
excavation if not removed may
 Electric pumps will be
make the excavation unstable
connected to a Power
and increases the potential for
source and be of
workers to slip and fall as well as
sealed pump design.
electrocution hazards from
Air powered
energized sources
dewatering pump will
be used if available.

 Excavation equipment may  Wear hearing


produce exposures exceeding protection is required
95 decibels (dBA), which may when exposures may
result in hearing damage if not exceed 95 decibels
adequately (dBA) work and Entry.
4.Load soil/excavated  Load soil/excavated material into  No one will be
JOB SAFETY
ANALYSIS
material into truck permitted to stand next
to a truck while it is
being loaded. Drivers
may remain in their cab
if adequate overhead
truck protection (cab) exists.
 No one shall be under
a suspended load or
the swing radius of the
excavator/backhoe
bucket.
5.Secure tools  Inspect work/staging
 Slips, trips and falls area.

 Lock equipment. Lock


 Security
away tools

WORK METHODOLOGY:
JOB SAFETY
ANALYSIS
1. SITE PREPARATION WORKS

 Prepare and inspect Tools, Hand tools and PPE use for Excavation activities
 Check and inspect the needed tools , equipment to be use
 Inspect and risk assist the work area
 Secure the work /excavation permit and approved FCD and specification
 Barricade the area
 Conduct Toolbox meeting prior to start the activities
2. Mobilization of Heavy Equipment, Tools & Materials
 Delivery of Shoring, Soil pile and other materials needed
3. Checking of soil
4. Preparation for Excavation
5. Housekeeping / Demobilization

Prepared by: Approved by:

Joey Stanley Guzman Engr. Lawrence Pornasdoro


Site Safety Specialist Project Engineer