BLDG Cost
BLDG Cost
PRIVATE ENGINEER
CIVIL 10,000.00
ELECTRICAL 10,000.00
PLUMBER 6 ,000.00
MECHANICAL 6,000.00
ELECTRONIC 8,000.00
DOLE 10,000.00
n.b. above estimate cost does not include gov’t fees of the ff:
ESTIMATE ---- gov’t fees plus 100% …… 10,000 – existing structure ……. 8,000.00 – occupancy penalty gov’t fees
plus 100%
ZONING ------------------------- penalty ( P500.00/day since start of construction…for nego)