BILL OF QUANTITY

FOR

(SETIA FONTAINES – SOFTSCAPE WORKS AT


SETIA EXPERIENCE CENTRE & ICONIC
BRIDGE’S PAVILION)

PROPOSED CONSTRUCTION, COMPLETION AND


MAINTENANCE OF SOFTSCAPE WORKS FOR
SETIA EXPERIENCE CENTRE AND ICONIC
BRIDGE’S PAVILION ON PART OF LOTS 1557,
1826, 1829, 2457 & 2466, MUKIM 6, DAERAH
SEBERANG PERAI UTARA PULAU PINANG

FOR MESSRS. SETIA FONTAINES SDN. BHD.

SF/LND-19/C029.

1 October 2019
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466,
MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL NO.1 - General Conditions and Preliminaries

ITEM DESCRIPTION AMOUNT (RM)

GENERAL
The Contractor shall insert in this summary of tender, the amount for individual items and
sub-items as indicated. Details of individual items are as per "Section 1.0 - General
Conditions and Preliminaries" of "Appendix A - Specifications".

Where the Contractor does not price an item or inserts a dash against any item in the
Summary of Tender, the value thereof will be deemed to be included in the rates
contained elsewhere in the Summary of Tender (s).

1.1 PROJECT PARTICULARS


1.1.1 Definitions
1.1.2 Scope of Works
1.1.3 Location of Site

1.2 GENERAL CONDITIONS


1.2.1 Generally
1.2.2 Fluctuations of Prices
1.2.3 Performance Bond

1.3 INSTRUCTION TO TENDERERS


Item 1 General
Item 2 Tender Table Documents
Item 3 Obscurity of Meaning
Item 4 Failure to Communicate Notice of Discrepancy, Obscurity of
Meaning
Item 5 Oral Interpretation
Item 6 Method of Billing
Item 7 Units of Measurement
Item 8 Pricing of Summary of Tender And Bills of Quantities
Item 9 Submission of Tenders
Item 10 Extension of Tender Validity Period
Item 11 Earnest Money
Item 12 Examination of Breakdown of Lump Sum Tenders
Item 13 Rationalisation and Mathematical Errors
Item 14 Star Rates
Item 15 Tender/Alternative Tenders
Item 16 Mock-Up Units
Item 17 Consultant's Certification
Item 18 Director's Involvement
Item 19 Arbitration
Item 20 Letter of Award

Total carried forward to collection page

BQ 1/1 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466,
MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL NO.1 - General Conditions and Preliminaries

ITEM DESCRIPTION AMOUNT (RM)

1.4 FORM OF CONTRACT


1.4.1 Conditions of Contract

1.4.2 Articles of Agreement.


Article 1 Contractor's Obligations
Article 2 Contract Sum
Article 3 Architect
Article 4 Engineer
Article 5 Quantity Surveyor
Article 6 Specialist Consultant
Article 7 Definitions
Article 8 Meanings

1.4.3 Schedule Of Conditions


Clause 1.0 Contractor's Obligations
Clause 2.0 Architect's Instructions
Clause 3.0 Contract Documents
Clause 4.0 Statutory Obligations, Notices, Fees and Charges
Clause 5.0 Levels and Setting Out of the Works
Clause 6.0 Materials, Goods and Workmanship to Conform to
Description, Testing and Inspection

Clause 7.0 Royalties and Intellectual Property Rights


Clause 8.0 Site Agent
Clause 9.0 Access to the Works
Clause 10.0 Site Staff
Clause 11.0 Variations, Provisional and Prime Cost Sums
Clause 12.0 Quality and the Quantity of the Works
Clause 13.0 Contract Sum
Clause 14.0 Materials and Goods
Clause 15.0 Practical Completion and Defects Liability
Clause 16.0 Partial Possession by Employer
Clause 17.0 Assignment and Sub-Contracting

Total carried forward to collection page

BQ 1/2
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466,
MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL NO.1 - General Conditions and Preliminaries

ITEM DESCRIPTION AMOUNT (RM)

1.4 FORM OF CONTRACT (Cont'd)


1.4.3 Schedule Of Conditions (Cont'd)

Clause 18.0 Injury to Persons Or Loss And/or Damage of Property and


Indemnity To Employer

Clause 19.0 Insurances Against Injury to Persons And Loss And/or


Damage of Property

Clause 20.0 A Insurance of New Buildings / Works - By The Contractor


Clause 20.0 B Insurance of New Buildings / Works - By The Employer
Clause 20.0 C Insurance of Existing Building or Extension - By The Employer
Clause 21.0 Date of Commencement, Postponement and Completion Date
Clause 22.0 Damages for Non-Completion
Clause 23.0 Extension of Time
Clause 24.0 Loss and / or Expense Caused By Matters Affecting the
Regular Progress of the Works

Clause 25.0 Determination of Contractor's Employment by Employer


Clause 26.0 Determination of Own Employment by Contractor
Clause 27.0 Nominated Sub-Contractors
Clause 28.0 Nominated Suppliers
Clause 29.0 Works by Craftsmen, Tradesmen or other Contractors
Employed or Engaged by Employer

Clause 30.0 Certificates and Payment


Clause 31.0 Outbreak of Hostilities
Clause 32.0 War Damage
Clause 33.0 Antiquities
Clause 34.0 Adjudication and Arbitration
Clause 35.0 Mediation
Clause 36.0 Notice
Clause 37.0 Performance Bond
Clause 38.0 Governing Law
Clause 39.0 Quality Management System
Clause 40.0 Severability
Clause 41.0 No Waiver by Employer
Clause 42.0 Confidentiality

1.4.4 Law Governing Contract

Total carried forward to collection page

BQ 1/3 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466,
MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL NO.1 - General Conditions and Preliminaries

ITEM DESCRIPTION AMOUNT (RM)

1.5 SITE REQUIREMENTS (Cont'd)

1.5 SITE REQUIREMENTS


1.5.1 Visit to the Site
1.5.2 Site Inspection and Site Survey
1.5.3 Adjoining Properties
1.5.4 Access and Egress
1.5.5 Site Management and Supervision - General
1.5.6 Site Management and Supervision - Site Agent
1.5.7 Site Management and Supervision - Contractor's Site Staff
1.5.8 Site Management and Supervision - Contractor's Technical
Support to Employer's Technical Project Team

1.5.9 Working Hours


1.5.10 Labour-On-Costs
1.5.11 Plant and Equipment
1.5.12 General Scaffolding and Staging
1.5.13 Existing Services
1.5.14 Existing Roads and Drains
1.5.15 Protection of Operatives, Site and Supervisory Staff, Member
of the Public, Existing Adjoining Buildings, etc

1.5.16 Protection of the Works


1.5.17 Site Fire Prevention and Fire Fighting Facilities
1.5.18 Prevention of Silt into Watercourse
1.5.19 Preservation of Earth Slopes
1.5.20 Security of the Works
1.5.21 Programme of Works
1.5.22 Site Meetings
1.5.23 Progress Report
1.5.24 Progress Photographs
1.5.25 Site Office and Temporary Buildings
1.5.26 Hoarding, Gates and Fencing
1.5.27 Signboard
1.5.28 Advertising
1.5.29 Telephone
1.5.30 Temporary Drainage

Total carried forward to collection page

BQ 1/4
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466,
MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL NO.1 - General Conditions and Preliminaries

ITEM DESCRIPTION AMOUNT (RM)

1.5 SITE REQUIREMENTS (Cont'd)

1.5.31 Temporary Lighting


1.5.32 Temporary Water For The Works
1.5.33 Temporary Electricity Supply
1.5.34 Reimbursement For Power Consumed By Sub-Contractor
1.5.35 Restriction of Persons to Site
1.5.36 Liability For Nuisance
1.5.37 Noise Nuisance
1.5.38 Pollution
1.5.39 Traffic Congestion Around Site
1.5.40 Mosquitoes Prevention
1.5.41 Keeping Site Dry

1.6 LAW, REGULATIONS, LOCAL AUTHORITIES & GOVERNMENT


REGULATIONS ETC
1.6.1 Permits And Licenses Required In Connection With The
Works

1.6.2 Requirements From The Construction Industry Development


Board (CIDB)

1.6.3 Custom Restrictions, Quotas And Duties, Etc.


1.6.4 Registration Of Workmen With Department Of Labour
1.6.5 Foreign Workers And Specialists
1.6.6 Safety Measures
1.6.7 Police Requirement
1.6.8 Environment Protection
1.6.9 Factories And Machinery Act 1967 / Occupational Safety and
Health Act 1994

1.6.10 Contractor Safety Performance Incentive Scheme

1.7 COORDINATION WITH OTHER PARTIES


1.7.1 Nominated Sub-Contractors
1.7.2 Nominated Suppliers
1.7.3 Co-ordination With Other Contractors Employed On The Site
1.7.4 The Independent Contractors Or Craftsmen
1.7.5 Responsibility For Specialists

Total carried forward to collection page

BQ 1/5 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466,
MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL NO.1 - General Conditions and Preliminaries

ITEM DESCRIPTION AMOUNT (RM)

1.8 OTHER MATTERS


1.8.1 Ordering Of Materials
1.8.2 Samples
1.8.3 Material Tests
1.8.4 Loading In Excess Of Design Load
1.8.5 Shop Drawings
1.8.6 Manufacturers' Warranties
1.8.7 As-built Drawings And Operating And Maintenance
Instructions

1.8.8 Cleaning The Works And Handing Over


1.8.9 Leave Works Perfect
1.8.10 Supply of Materials
1.8.11 Deferment of Installation of Loose Or Dismountable Items

Total carried forward to collection page

COLLECTION :

Page BQ1/1 R

Page BQ1/2

Page BQ1/3 R

Page BQ1/4

Page BQ1/5 R

Page BQ1/6 R

Total carried forward to summary page

BQ 1/6 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)
A SITE PREPARATION LS
Final Grading - Landscape Contractor to provide labour, transport, machinery and
everything necessary to level, grade and shape suitable soil material to form the
desired final grade levels included moundings as instructed by L.A. Landscape
Contractor to ensure proper earth grading & fall to allow water runoff to discharge
points and avoid water ponding at all areas. Works to include fine shaping, touch
up, cutting, back filling, trimming etc and all necessary operations to achieve final
finish levels. (± 100 mm of existing grade levels).

(Approximate area 7450 m2)


Dwg no.: SB-DP-OSPN-B1703-AL-503 - SB-DP-OSPN-B1703-AL-513 )

Total carried forward to collection page

BQ 2/1 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)
B SOFTSCAPE WORKS (ALL PROVISIONAL)

Notes:-

i This Bill is to be read in conjunction with Drawings, Specifications, Preliminaries


and Preambles attached.

ii The words "as described" where used in this Bill shall


mean as described in the above documents.

iii The quantities given in this Bill are PROVISIONAL and payment will be made
based on remeasurement of actual work executed

iv The contractor shall not entittle for any claims of loss of profit and/or expense
solely on the ground that the actual quantities differ from those under this bill

v Contractor is deemed to have allowed elsewhere in the tender amount items not
described in this Bill but appear in the Drawings.

vi The description in this Bill shall form an integral part of the Specifications. In
Case of discrepancy, difference or divergence between the Drawings and the
Specification, Contractor shall report to the Architect for decision.

vii Failure to bring to the Architect attention any such discrepancy, difference or
divergence before acceptance of award shall result in the same being resolved
at noadditional cost or time.

Total carried forward to collection page

BQ 2/2 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)
B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)
To supply, deliver and plant the following plant materials including excavation of
planting pits, carting off excess & dispose off site, handling, setting and planting
with a minimum of 50mm thk. coco fiber mulching and watering to ensure survival
as directed by the L.A. All plants supplied shall be well established in polybag
containers, healthy and proportionate with no top cutting & freshly root trenched
trees.

1.0 SOIL MIX


1.1 To supply and lay soil mixture comprising of 3 parts top soil, 2 parts coarse All sample to be taken
sand, 1 parts organic matter/manure and 1 kg of C.I.R.P per cubic meter or
other mix approved by L.A. including loading and unloading, mixing on site, filling
into excavated planting holes, lightly ramming and all other works in connection.
Media is to be well mixed before the planting works are carried out. The organic
matter is to be clean, well-decomposed, free from smell, debris, refuse or visible
fungus.

Note: The topsoil is to be sourced from "Contractors source" and to be


approved by L.A.

a 1000mm x 1000mm x 1000mm for trees and palms m3 20 1

b 450mm x 450mm x 450mm for shrub ≥1m high m3 82 -

c 300mm x 300mm x 300mm for shrub < 1m high m3 340 18

d 150mm x 150mm x 150mm for ground covers and climbers m3 24 -

Total carried forward to collection page

BQ 2/3 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)
B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

1.0 SOIL MIX (Cont'd)

1.2 To supply and lay soil mixture comprising of 3 parts top soil, 2 parts coarse
sand, 1 parts organic matter/manure and 1 kg of C.I.R.P per cubic meter or
other mix approved by L.A. including loading and unloading, mixing on site, filling
into excavated planting holes, lightly ramming and all other works in connection.
Media is to be well mixed before the planting works are to carried out. The organic
matter is to be clean, well-decomposed, free from smell, debris, refuse or visible
fungus.

Note: The topsoil is to be sourced from "Employer source within site" and to
be approved by L.A.
a 1000mm x 1000mm x 1000mm for trees and palms m3 - Rate only Rate only

b 450mm x 450mm x 450mm for shrub ≥1m high m3 - Rate only Rate only

c 300mm x 300mm x 300mm for shrub <1m high m3 - Rate only Rate only

d 150mm x 150mm x 150mm for ground covers and climbers m3 - Rate only Rate only

Total carried forward to collection page

BQ 2/4 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)
B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

2.0 STAKING
2.1 Tripod Staking (for trees ≥ 75mm trunk dia & single trunk palms) no 163 1
To supply & install stakes for trees using 3 nos hardwood timber of 50mm x 50mm
x 2400mm length each. The stakes shall be equidistant around tree and firmly
driven into the ground (min 500mm in ground and 1900mm exposed) with 25mm
x 50mm hardwood timber staking support. The stake shall be tied neatly and
firmly. The point of contact between the trunk and staking shall be padded with
suitable material and secured with plastic coated tie from 3 different points of the
tripod stake to L.A approval as per Dwg no.: SB-DP-OSPN-B1703-AL-511.

2.2 Double stake (for trees 35mm - 75mm trunk dia) no 74 -


To supply & install stakes for trees using 2 nos. hardwood timber of 50mm x
50mm x 2400mm length each (500mm in ground and 1900 mm exposed) with 2
pieces of horizontal timber support of 25mm x 50mm each. The stakes shall be
installed neatly and firmly. The point of contact between the trunk and upper
horizontal support shall be padded with suitable material and secured with plastic
coated tie to L.A approval as per Dwg no.: SB-DP-OSPN-B1703-AL-511.

2.3 Single stake (for trees < 35mm trunk dia)


To supply & install stakes for trees using 1 nos. hardwood timber of 25mm x no - -
50mm x 2400mm length each (500mm in ground and 1900 mm exposed). The
stakes shall be installed neatly and firmly. The point of contact between the trunk
and upper horizontal support shall be padded with suitable material and secured
with plastic coated tie to L.A approval as per Dwg no.: SB-DP-OSPN-B1703-AL-
511

Total carried forward to collection page

BQ 2/5 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION
ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION MIN. CLEAR MIN. TRUNK
OVERALL HT. UNIT AMOUNT AMOUNT
TRUNK HT. (MM) DIA. (MM) (RM) QTY QTY
(MM) (RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL)


(Cont'd)
To supply and plant the following plant
materials including excavation of planting pits,
planting works and minimum of 50mm thk. coco
fiber mulching and watering to ensure survival
as directed by the L.A
*(All plants supplied are to be well established
in polybag containers, no top cutting)

3.0 TREES
(as per drawing: SB-DP-OSPN-B1703-AL-503)

3.1 Andira inermis 2200 - 100 no 28 -

3.2 Brassaia actinophylla - 4500 - no - 1

3.3 Chrysophyllum cainito 1800 - 75 no 8 -

3.4 Cratoxylum cochinchinense 2000 - 75 no 15 -

3.5 Dalbergia latifolia 2000 - 75 no 7 -

3.6 Eucalyptus deglupta 2000 - 75 no 6 -

3.7 Ficus lyrata (Bushy, min. 5 branches) 1800 - 60 no 15 -

3.8 Ficus benghalensis 2200 - 150 no 4 -

Total carried forward to collection page

BQ 2/6 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION
ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION MIN. CLEAR MIN. TRUNK
OVERALL HT. UNIT AMOUNT AMOUNT
TRUNK HT. (MM) DIA. (MM) (RM) QTY QTY
(MM) (RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL)

3.0 TREES (Cont'd)


3.9 Garcinia subelliptica - 2500 - no 12 -

3.10 Jacaranda mimosifolia 2000 - 200 no 3 -

3.11 Lagerstroemia floribunda 2000 - 100 no 5 -

3.12 Lagerstroemia langkawiensis 2000 - 75 no 20 -

3.13 Podocrapus macrophyllus - 3000 - no 47 -

3.14 Streculia oblongata 2000 - 75 no 37 -

3.15 Talipariti tiliaceum purpurascens 2000 - 75 no 8 -

215 1

4.0 PALMS
4.1 Livistona chinensis 3000 - 200 no 16 -

4.2 Bismarckia nobilis 'Silver' 1000 - 400 no 6 -

22

Total carried forward to collection page

BQ 2/7 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)


To supply and plant the following plant materials including
excavation of planting pits, planting works and minimum of
50mm thk. coco fiber mulching and watering to ensure
survival as directed by the L.A
*(All plants supplied are to be well established in polybag
containers, no top cutting)

5.0 SHRUBS
(as per drawing: SB-DP-OSPN-B1703-AL-504-ADD1)

5.1 Breynia nivosa 250 25 no 2400 -

5.2 Bougainvillea glabra sanderiana 300 - no - 90

5.3 Bougainvillea 'Mrs. Eva' 300 no - 90

5.4 Carphalea kirondron 600 10 no 350 -

5.5 Carmona retusa 200 25 no 1730 -

5.6 Costus woodsonii 300 - no - 295

5.7 Excoecaria bicolor 'Variegated' 400 12 no 835 -

5.8 Fragraea ceilanica 'variegata' 600 10 no 1725 160

5.9 Galphimia glauca 400 12 no 205 -

Total carried forward to collection page

BQ 2/8 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

5.0 SHRUBS (Cont'd)


5.10 Hibiscus cannabinus 600 10 no 755 -

5.11 Lespedeza bicolor 500 10 no 235 -

5.12 Lagerstroemia indica 600 10 no 360 -

5.13 Leucophyllum frutescens 350 12 no 620 -

5.14 Loropetalum chinense 500 10 no 625 -

5.16 Mussaenda flava 500 10 no 175

5.17 Murraya paniculata 600 10 no 1485 -

5.18 Myrtus communis 500 10 no 260 -

5.19 Ruellia simplex 300 12 no 590 -

5.20 schefflera arboricola 300 12 no 225 -

5.21 Eugenia oleina 1500 4 no 720 -

5.22 Podocarpus macrophyllus 1000 7 no 140 -

13435 635

Total carried forward to collection page

BQ 2/9 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

6.0 GROUNDCOVERS
6.1 Cuphea hyssopifolia 200 25 no 675 -

6.2 Lantana camara 'Spreading Sunset' 200 25 no 2950 -

6.3 Tabernaemontana divaricata 'Dwarf' 250 16 no 1385 -

6.4 Tabernaemontana divaricata 'Dwarf' yellow 250 16 no 1880 -

6890

7.0 ACCENT PLANTS


7.1 Cycas revoluta 1000 - no 18 -

7.2 Calliandra surinamensis 1500 - no 11 -

7.3 Tecoma stans 1200 - no 9 -

38

8.0 CLIMBER
8.1 Thunbergia grandiflora 600 12 no 155 -

155

Total carried forward to collection page

BQ 2/10 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

9.0 SEASONAL PLANTS- to be rotated


9.1 Celosia argentea (SP1) 400 - no 355 -

9.2 Amaranthus tricolor Joseph's Coat (SP1) 250 - no 355 -

9.3 Gerbera jamesonii (SP1) 300 - no 355 -

9.4 Angelonia serena (SP1) 300 - no 355 -

9.5 Ajuga reptans (SP2) 300 - no 395 -

9.6 Kalanchoe blossfeldiana (SP2) 300 - no 395 -

9.7 Tagetes patula (SP2) 300 - no 395 -

9.8 Coleus blumei hybrid (SP3) 250 - no 320 -

9.9 Salvia splendens (SP3) 400 - no 320 -

9.10 Verbena hybrida (SP3) 300 - no 320 -

9.11 Melapodium paludosum (SP3) 200 - no 320 -

3885

Total carried forward to collection page

BQ 2/11 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

10.0 ORCHID PLANTS- to be rotated


10.1 Aranda Dinah Shore (SP4) 400 - no 225 -

10.2 Dendrobium 'Red Bull' (SP4) 400 - no 225 -

10.3 Dendrobium 'Snow white' (SP4) 400 - no 225 -

10.4 Oncidium Golden Wish (SP4) 400 - no 225 -

10.5 Papilionanda bangkok (SP4) 400 - no 225 -

10.6 Vanda Tan Hoon Siang (SP4) 400 - no 225 -

1350

Total carried forward to collection page

BQ 2/12 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)
B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

11.0 SEASONAL PLANTS- to be rotated


11.1 SP1- - no - Rate only - -

11.2 SP1- - no - Rate only - -

11.3 SP1- - no - Rate only - -

11.4 SP1- - no - Rate only - -

11.5 SP2- - no - Rate only - -

11.6 SP2- - no - Rate only - -

11.7 SP2- - no - Rate only - -

11.8 SP3- - no - Rate only - -

11.9 SP3- - no - Rate only - -

11.10 SP3- - no - Rate only - -

11.11 SP3- - no - Rate only - -


Note: Contractor shall propose seasonal plants based on
market availability and seasonal local events subject to LA
and Client approval for second rotation. Seasonal plants are
to be rotated every two months with 6 rotations scheduled
yearly or when the plants wilt; whichever come later.

Total carried forward to collection page

BQ 2/13 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON
PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS


UNIT RATE SEC BRIDGE
MIN.
ITEM DESCRIPTION NO./SQM AMOUNT AMOUNT
OVERALL HT. (RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

12.0 ORCHID PLANTS- to be rotated


12.1 SP4- - no - Rate Only - -

12.2 SP4- - no - Rate Only - -

12.3 SP4- - no - Rate Only - -

12.4 SP4- - no - Rate Only - -

12.5 SP4- - no - Rate Only - -

12.6 SP4- - no - Rate Only - -


Note: Contractor shall propose Orchid plants based on market
availability and seasonal local events subject to LA and Client
approval for second rotation. Orchid plants are to be rotated
every two months with 6 rotations scheduled yearly or when
the plants wilt; whichever come later.

Total carried forward to collection page

BQ 2/14 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF
LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS

UNIT RATE SEC BRIDGE


ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

11.0 TURFING
11.1 Zoysia matrella (Closed Turfing) m2 5033 -
To supply and lay Zoysia matrella (99% purity), min sod size of 300mm x 600mm,
with min 20mm thk root & soil intact. Sods to be laid butt-joint.Rate to include min
50mm thk soil-sand mix (50% topsoil + 50% sand) bed levelled over the turfing area.
Prior to soil mix, the ground shall be graded with a minimum fall of 2% to the nearest
drain and or water discharge outlet to avoid water ponding. The joint between sod
has to be filled with suitable top dressing & compacted to achieve an even finish
level. The turf shall be maintained immediately upon being laid and shall remain
healthy & green throughout the contract period.

11.2 Zoysia matrella (Spot Turfing) m2 - Rate only - Rate only


To supply and lay Zoysia matrella (99% purity), min sod size of 75mm x 75mm with
min 20mm thk root & soil intact. The turf is to be laid in rows with the sods placed in
zig zag order. The gap between edge of sod to be not more than 75mm. Rate to
include min 50mm thk soil-sand mix (50% topsoil + 50% sand) to be laid and levelled
over the planting area. Prior to soil mix, the ground shall be graded with a minimum
fall of 2% to the nearest drain and or water discharge outlet to avoid water ponding.
The sods shall be applied with suitable top dressing where necessary & compacted
to achieve an even finish level. The turf shall be maintained immediately upon being
laid and shall remain healthy & green throughout the contract period.

Total carried forward to collection page

BQ 2/15 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF
LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS

UNIT RATE SEC BRIDGE


ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)

B SOFTSCAPE WORKS (ALL PROVISIONAL) (Cont'd)

12.0 GRASSCELL
(as per drawing: SB-DP-OSPN-B1703-AL-105-ADD1, 511)
12.1 To supply and install 40mm thk. heavy duty grasscell of Elmich's TurfPave XD or m2 1266 -
approved equivalent c/w 10mm thk coarse sand to L.A. approval; as per drawing;
including all necessary associated works to the satisfaction of L.A.

13.0 IRRIGATION & TAP POINT


(as per drawing: SB-DP-OSPN-B1703-AL-104-ADD1)
13.1 Tap point for irrigation nos 8 -
To supply, deliver and install tap point with GI water control valve and Rain Bird or
approved equivalent 10" round valve box including all necessary excavation, sand
bedding and other works to LA's approval.(Incoming water source by infra to the tap
point)

14.0 DRAINAGE CELL


To supply and lay 30mm thk. system drainage cell; including one layer of TS20 m2 - 150
geotextile; c/w 50mm thick wash sand bed filter; and all necessary associated works
to the satisfaction of Landscape Architect.

15.0 ARTIFICIAL TURFING (CONTROL ROOM'S ROOF)


i) To supply and install 25mm thk. artificial turf of 'Signature Turf' (Signature 25) or m2 120 -
approved equivalent. All pattern, colors, and design to L.A approval; including all
necessary associated works to the satisfactory of L.A
ii) To supply and install 30mm thk. drainage cell including one layer of geotextile m2 120 -
(TS20); c/w min. 50mm wash sand bed filter; and all necessary associated works to
the L.A. satisfaction.

Total carried forward to collection page

BQ 2/16 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF
LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM 6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.2 - SOFT LANDSCAPE WORKS

UNIT RATE SEC BRIDGE


ITEM DESCRIPTION AMOUNT AMOUNT
(RM) QTY QTY
(RM) (RM)

COLLECTION

Page BQ 2/1 R

Page BQ 2/2 R

Page BQ 2/3 R

Page BQ 2/4 R

Page BQ 2/5 R

Page BQ 2/6 R

Page BQ 2/7 R

Page BQ 2/8 R

Page BQ 2/9 R

Page BQ 2/10 R

Page BQ 2/11 R

Page BQ 2/12 R

Page BQ 2/13 R

Page BQ 2/14 R

Page BQ 2/15 R

Page BQ 2/16 R

Bill No. 2 TOTAL CARRIED FORWARD TO SUMMARY PAGE

BQ 2/17 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM
6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.3 - MAINTENANCE WORKS

UNIT RATE
AMOUNT
ITEM DESCRIPTION QTY
(RM) (RM)

A MAINTENANCE WORKS
To supply material, machinery, labour, transportation and other
necessary items to carry out the maintenance of all completed work mth 24
which includes but not limited to the items stated below.
a Setia Experience Centre
b Bridge

Contractor to state the minimun number of competent, full time workers no. of full
stationed daily on site during working hours for the purpose of time
satisfactory maintenance of the completed works. workers

Unsatisfactory maintenance - It shall be the responsibility of the


Contractor to write in requesting for inspection at the end of every month
failing which he shall not be entitled to the maintenance claim for that
month. Maintenance claim due to the Contractor shall be deducted with
a recommended amount that L.A finds reasonable if the areas are found
to be unsatisfactorily maintained.

If the maintenance of any area is found to be grossly unsatisfactory, the


employer has the right to employ other parties to maintian/rectify/make
good such areas and all costs incurred shall be back-charged to the
contractor.

1.0 SOFTSCAPE WORKS

1.1 Watering - watering all plant materials and quantity of water applied at
all times shall be sufficient to penetrate to a minimum depth of 150mm at
a rate which allows saturation of the soil. Water to be provided by
contractor unless specifically stated otherwise. Frequency - daily or as
when necessary.

1.2 Weeding and Forking - keep all planting areas free from weeds and
undesirable vegetation & loosen the soil around the base by methods
and materials approved by the L.A Herbicides are prohibited. Frequency -
at least once a month or as and when necessary.

Pest and Disease Control - to treat plants found to be infected by any


disease or pest using the appropriate method/materials approved by the
1.3 L.A and take all necessary precaution/remedial action to contain the
spread of the infection to other plants. Frequency - regular monitoring,
treatment as & when necessary.

1.4 Pruning and Shaping - The amount of pruning shall be limited to the
minimum necessary to remove dead or injured twigs and branches and
or compensate for the loss of roots as a result of transplanting and or to
achieve the desired form & shape of the plant. Frequency - for shrubs, at
least once a month or as & when necessary. For trees, at least once in 3
months to shape & balance canopy.

1.5 Fertilizer Application - Application of commercial inorganic fertilizer


(Behn Mayer or approved equivalent) of a complete formula 15:15:15 for
greens, 12:12:17+2 for flowering plants or otherwise as specified by the
L.A at a rate recommended by the manufacturer. Fertilizer shall be
uniform in composition, dry and free flowing. This shall be rotated with
approved organic compost applied once every 3 months. Fertilizer
regime - fortnightly for Zoysia *turf, once a month for other plants -

Total carried forward to collection page

BQ 3/1
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM
6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.3 - MAINTENANCE WORKS

UNIT RATE
AMOUNT
ITEM DESCRIPTION QTY
(RM) (RM)

A MAINTENANCE WORKS (Cont'd)

1.6 Replacement of Plants - Dead/unhealthy/missing plants are to be


replaced with true to type and size or as specified by the L.A in the event
of non-availability of spec. The plant shall be replaced immediately or
latest within 1 month upon being instructed. Any trees replaced during
the last 2 months of DLP shall have the maintenance extended by
additional 3 months to ensure survival. Frequency - monthly inspection
and replacement as necessary.

1.7 Replacement of Rotational Plants -Seasonal plants and Orchid plants


are to be rotated for 6 times rotation as scheduled yearly.The plants shall
be replaced every two months with the plants specified. Contractor shall
counter proposed listed Seasonal and Orchid plants based on market
availbality and seasonal local events to LA's ad Client approval.

1.8 Staking & Guys - To inspect, replace, adjust all staking, padding & ties
to ensure proper and support for the tree without any injury to the trunk.
To ensure it is not a safety hazard (rusty nails, sharp pointed edges etc)
Frequency - at least once a month or as necessary.

1.9 Grass Cutting - To cut the turf by not more than one-third of the blade at
any one time and ensure no overcutting resulting in bare or brown
patches. Turf clipping shall be removed and disposed immediately.
Frequency - fortnightly for Zoysia, once a month for Axonopus* note: for
Property South only - fortnightly for Zoysia and Axonopus as well.

1.10 Rubbish Removal - All waste/rubbish arising shall be continuously and


promptly removed daily and disposed off site. All reasonable precaution
should be taken to avoid damage to existing structures, plants and
grass. Frequency - daily.

1.11 Vandalism/Damage - During the DLP, the Contractor is required to


replace any missing, dying or vandalized/damaged plants either by
human or animal to the original type and true to size at his own cost and
it is the Contractor's responsibility for the safe custody of all the trees,
shrubs and plants etc until it is handed over to the Employer after
maintenance period expires.

Total carried forward to collection page

BQ 3/2
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM
6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

BILL No.3 - MAINTENANCE WORKS

UNIT RATE
AMOUNT
ITEM DESCRIPTION QTY
(RM) (RM)

COLLECTION:

Page BQ 3/1

Page BQ 3/2

Bill No. 3, TOTAL CARRIED FORWARD TO SUMMARY PAGE

BQ 3/3 R
"(SETIA FONTAINES – SOFTSCAPE WORKS AT SETIA EXPERIENCE CENTRE & ICONIC BRIDGE’S PAVILION)
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF SOFTSCAPE WORKS FOR SETIA
EXPERIENCE CENTRE AND ICONIC BRIDGE’S PAVILION ON PART OF LOTS 1557, 1826, 1829, 2457 & 2466, MUKIM
6, DAERAH SEBERANG PERAI UTARA PULAU PINANG"

FINAL SUMMARY

Based on Consultant's Design and Fixed Overall Completion Period of FOUR (4) months from the Date of Commencement.

BILL SUMMARY OF TENDER PAGE NO. TOTAL AMOUNT (RM)

1.0 General Conditions and Preliminaries BQ1/6 R

2.0 Soft Landscape Works (All Provisional)

- SEC BQ2/17 R

- Bridge BQ2/17 R

3.0 Maintenance Works BQ3/3 R

TOTAL TENDER AMOUNT (RM) Carried forward to Form


Of Tender (Page FOT/1)

Tenderer's Signature : ..............................…………… Tenderer's Signature : ..............................…………

Name of Tenderer: .......................................………… Name of Tenderer: .......................................…………

NRIC No: ....................................................………… NRIC No: ....................................................…………

Company stamp: ........................................…………. Company stamp: ........................................…………

Date: ............................................……….………….. Date: ............................................……….……………