PT INDONESIA ASAHAN ALUMINIUM (Persero)

Comparation Result
Renewal of Stator Coil Unit No.1 TNP
Contract No. : 4900001750

Method : - Insulation Resistance Test of Stator Coil Unit No.1 TNP

Operation Installation Inspection End of


Technical Specification Description Remarks
Standard Test Warranty Period
Item Phase Requirement Report Result
A. Insulation Resistance Measurement
U -
V - Insulation resistance
Not less than
Megger 1000V/2000MΩ >2000MΩ value of Stator coil more Good
150MΩ/phase
W - than 150 MΩ (standard)

Note :
- - Stator Coil at Hydrogenerator Unit No.1 TNP is operating very well.
-

Approved Checked Prepared


-
Name Jhony B. Samosir Sunarno AR Denny Panjaitan
Position M JM SI