Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

SESSION PLAN

Sector : Electronics
Qualification Title : Computer Systems Servicing NC II
Unit of Competency : Install and Configure Computer Systems
Module Title : Installing and Configuring Computer Systems
Learning Outcomes:
1. Assemble computer hardware
2. Prepare installer
3. Install operating systems and drivers for peripherals/devices
4. Install application software
5. Conduct testing and application

A. INTRODUCTION
This session plan covers the knowledge, skills and attitudes required to maintain poultry house and its
facilities. It includes activities such as conducting preparation activities, maintaining poultry house and
facilities, maintain farm area and perform work to completion. he following competencies: Computer
Hardware Installation, Computer Operating System/ Application Software and other computer
peripherals/devices.
B. LEARNING ACTIVITIES
LO 1: Assemble computer hardware
Resourc
Learning Content Methods Presentation Practice Feedback Time
es
1.OH&S policies and Self-paced Read information Answer the Compare CBLM/ 2 hrs.
procedure are followed sheet 1.1-1 OH&S self-check your answer Learning
Date Developed: Document No.
October 2016 Issued by:
Computer Systems Servicing NC II
Page 13 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
policies and 1.1-1 on the Materials
procedure are answer key
followed 1.1-1

2.Identifying and Self-paced Read information Answer the Compare CBLM/ 2 hrs
checking of the sheet 1.1-2 self-check your answer Learning
necessary materials Identifying and 1.1-2 on the Materials
against systems checking of the answer key
requirements necessary 1.1-2
materials against
systems
requirements

3.Obtaining the tools, Self-paced Read information Answer the Compare CBLM/ 2 hrs
equipment and testing sheet 1.1-3 self-check your answer Learning
devices needed Obtaining the 1.1-3 on the Materials
tools, equipment answer key
and testing devices 1.1-3
needed

Read Task Sheet


Demonstration
1.1-1 on
Identifying the
needed tools and
equipment in
testing devices.

Date Developed: Document No.


October 2016 Issued by:
Computer Systems Servicing NC II
Page 14 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
4.Assembling Self-paced Read information Answer the Compare CBLM/ 2.5
computer hardware sheet 1.1-4 self-check your answer hrs
Learning
with established Assembling 1.1-4 on the Materials
procedures and computer answer key
requirements hardware with 1.1-4
established
procedures and
requirements
Blended Approach
Questioning Compare
Video presentation tool 1.1-1 on answer to E-media
assembling model
computer answer
hardware

Demonstration Evaluate
Read Job Sheet Perform job
performance
1.1-1 on Dis Sheet 1.1-1
using
assembling and on Dis
Performance
Assembling assembling
criteria
computer and
checklist
hardware Assembling
assembling System computer
Unit hardware
assembling
System Unit

5.Configuration of Self-paced Read information Answer the Compare CBLM/ 2 hrs


Basic-input-output- sheet 1.1-5 self-check your answer Learning
systems( BIOS) in Configuration of on the
Date Developed: Document No.
October 2016 Issued by:
Computer Systems Servicing NC II
Page 15 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
accordance with Basic-input- 1.1-5 answer key Materials
hardware output- 1.1-5
requirements systems( BIOS) in
accordance with
hardware
requirements Evaluate
your
Demonstration Read Job Sheet performance Compute
1.1-2 on using r
Perform task
configuring BIOS Performance
Sheet 1.1-2
criteria
checklist
LO 2: Prepare installer
1.Creating portable Self-paced Read information Answer the Compare CBLM/ 2 hrs
bootable devices sheet 1.2-1 self-check your Learning
Creating portable 1.2-1 answer on
Materials
bootable devices the answer
key 1.2-1

Perform job Evaluate


Demonstration USB/Flas
Read Job Sheet Sheet 1.2-1 performanc h Drive
1.2-1 Creating Creating e base on Computer
portable bootable portable Performanc Installer
devices bootable e criteria
devices checklist

2.Preparation of Self-paced Read information Answer the Compare CBLM/ 2 hrs


customized installers sheet 1.2-2 self-check your Learning
in accordance with Preparation of 1.2-2 answer on Materials
software utilization customized the answer
Date Developed: Document No.
October 2016 Issued by:
Computer Systems Servicing NC II
Page 16 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
installers in key 1.2-2
accordance with
software utilization

3.Installation of Self-paced Read information Answer the Compare CBLM/ 2 hrs


portable applications sheet 1.2-3 self-check your Learning
Installation of 1.2-3 answer on Materials
portable the answer
applications key 1.2-3

LO 3: Install operating systems and drivers for peripherals/devices


1.Installation of Self-paced Read information Answer the Compare CBLM/ 2 hrs
Operating System (OS) sheet 1.3-1 self-check your Learning
in accordance with Installation of 1.3-1 answer on Materials
established Operating System the answer
installation procedure (OS) in accordance key 1.3-1
with established
installation
procedure
USB/Flas
Read Job Sheet Perform task Evaluate
Demonstration h Drive
1.3-1 on Sheet 1.1-1 performanc Computer
Installation of e based on Installer
Operating System Performanc
(OS) in accordance e criteria
with established checklist
installation
procedure
2.Installation and Self-paced Read information Answer the Compare CBLM/ 2 hrs

Date Developed: Document No.


October 2016 Issued by:
Computer Systems Servicing NC II
Page 17 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
configuration of sheet 1.3-2 self-check your Learning
peripherals/devices Installation and 1.3-2 answer on Materials
drivers configuration of the answer
peripherals/device key 1.3-2
s drivers

3.Accessing and Self-paced Read information Answer the Compare CBLM/ 2.5
installation of OS and sheet 1.3-3 self-check your hrs
Learning
drivers Accessing and 1.3-3 answer on Materials
updates/patches installation of OS the answer
and drivers key 1.3-3
updates/patches

4.On-going checks of Self-paced Read information Answer the Compare CBLM/ 2 hrs
the quality of the work sheet 1.3-4 On- self-check your Learning
are undertaken going checks of the 1.3-4 answer on Materials
quality of the work the answer
are undertaken key 1.3-4

LO 4: Install application software


1.Installation of Self-paced Read information Answer the Compare CBLM/ 2 hrs
application software sheet 1.4-1 self-check your Learning
based on software Installation of 1.4-1 answer on Materials
guides, end-user application the answer
requirements and software based on key 1.4-1
license agreement software guides,
end-user
requirements and
license agreement

Date Developed: Document No.


October 2016 Issued by:
Computer Systems Servicing NC II
Page 18 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
Demonstration Perform job USB/Flas
Read Job Sheet No. 1.4-1 Evaluate h Drive
1.4-1 Installation performanc Computer
of application e based on OS
software based on Performanc Installer
software guides, e criteria
end-user checklist
requirements and
license agreement
2.Variation to Self-paced Read information Answer the Compare CBLM/ 2 hrs
application software is sheet 1.4-2 self-check your Learning
carried out Variation to 1.4-2 answer on Materials
application the answer
software is carried key 1.4-2
out

3.Accessing and Self-paced Read information Answer the Compare CBLM/ 2 hrs
installation of sheet 1.4-3 self-check your Learning
software updates in Accessing and 1.4-3 answer on Materials
accordance with installation of the answer
manufacturer’s software updates key 1.4-3
recommendations and in accordance with
requirements manufacturer’s
recommendations
and requirements

Date Developed: Document No.


October 2016 Issued by:
Computer Systems Servicing NC II
Page 19 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
LO 5: Conduct testing and documentation
1.Testing of Self-paced Read information Answer the Compare CBLM/ 2 hrs
devices/systems sheet 1.5-1 Testing self-check your Learning
and/or installation to of devices/systems 1.5-1 answer on Materials
determine whether it and/or installation the answer
conforms to to determine key 1.5-1
requirements whether it
conforms to
requirements
Demonstration USB/Flas
Read Task Sheet Perform task Evaluate h Drive
1.5-1 Testing of 1.5-1 performanc Computer
devices/systems e based on Installer
and/or installation Performanc
e criteria
checklist

2.Conducting of Self-paced Read information Answer the Compare CBLM/ 2 hrs


Stress Test to ensure sheet 1.5-2 self-check your Learning
reliability of Conducting of 1.5-2 answer on Materials
equipment Stress Test to the answer
ensure reliability of key 1.5-2
equipment

3.Follow the 5S and Self-paced Read information Answer the Compare CBLM/ 2 hrs

Date Developed: Document No.


October 2016 Issued by:
Computer Systems Servicing NC II
Page 20 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00
3Rs according to sheet 1.5-3 Follow self-check your Learning
environmental policies the 5S and 3Rs 1.5-3 answer on Materials
according to the answer
environmental key 1.5-3
policies

4.Forwarding of Self-paced Read information Answer the Compare CBLM/ 2 hrs


documents to sheet 1.5-4 self-check your Learning
appropriate personnel Forwarding of 1.5-4 answer on Materials
and/or authority documents to the answer
appropriate key 1.5-4
personnel and/or
authority

C. ASSESSMENT PLAN
1. Written Test
 Questions on the inspection to ensure that the outcomes required in installing and configuring desktop and workstation
computer systems conform to the requirements.

2. Performance Test
 Performs assemble/Disassemble computer hardware
 Performs installation of operating system and drivers for peripherals/devices
 Performs installation of application software

3. Oral Questioning
D. TEACHER’S SELF-REFLECTION OF THE SESSION
The student/ trainee will proceed to the next competency if he/she is competent with the assigned task.
 Progress of trainees
 Passing rate of candidates.

Date Developed: Document No.


October 2016 Issued by:
Computer Systems Servicing NC II
Page 21 of 101
CNSC Plan Training Session Developed by:
Mark Ian B. Yongco Revision # 00