Professional Documents
Culture Documents
PRS Trial
PRS Trial
PRS Trial
Pressure
- To trap = 499.7 Psia
- Metering = 34.7 Psia
- Condenstae = 34.7 Psia
Temperature
- To trap = 11.73 Fahrenheit
- Metering = -59.33 Fahrenheit
- Condenstae = -14.88 Fahrenheit
Output
To Trap
Material Metering
Flow (MMSCFD) Fract Flow (MMSCFD) % Fract
Methane 0.0729 0.7756 0.0728 0.816
Ethane 0.0063 0.0668 0.0061 0.069
Propane 0.0097 0.1033 0.0082 0.092
n-Butane 0.0028 0.0302 0.0012 0.014
i-Butane 0.0000 0.0000 0.0000 0.000
n-Pentane 0.0000 0.0000 0.0000 0.000
i-Pentane 0.0000 0.0000 0.0000 0.000
n-Hexane 0.0014 0.0150 0.0000 0.000
CO2 0.0000 0.0000 0.0000 0.000
H2O 0.0001 0.0009 0.0001 0.001
Nitrogen 0.0008 0.0081 0.0008 0.009
Total 0.0940 1.000 0.0892 1.000
Total Flow (MMSCFD) 0.0940 0.0939
Output
To Trap
Material Metering
Flow (Btu/hr) Fract Flow (Btu/hr) % Fract
Methane -2.95E+05 0.7756 -2.91E+05 0.816
Ethane -2.54E+04 0.0668 -2.46E+04 0.069
Propane -3.92E+04 0.1033 -3.29E+04 0.092
n-Butane -1.15E+04 0.0302 -4.82E+03 0.014
i-Butane -0.00E+00 0.0000 -0.00E+00 0.000
n-Pentane -0.00E+00 0.0000 -0.00E+00 0.000
i-Pentane -0.00E+00 0.0000 -0.00E+00 0.000
n-Hexane -5.70E+03 0.0150 -1.07E+02 0.000
CO2 -0.00E+00 0.0000 -0.00E+00 0.000
H2O -3.42E+02 0.0009 -3.21E+02 0.001
Nitrogen -3.08E+03 0.0081 -3.07E+03 0.009
Total -3.80E+05 1.000 -3.57E+05 1.000
Total Flow (MMSCFD) -3.80E+05 -3.80E+05
HYSYS)
Output
Condensate
Flow (MMSCFD) % Fract
0.0001 0.0112
0.0001 0.0289
0.0015 0.3173
0.0016 0.3474
0.0000 0.0000
0.0000 0.0000
0.0000 0.0000
0.0014 0.2951
0.0000 0.0000
0.0000 0.0001
0.0000 0.0000
0.0047 1.000
HYSYS)
Output
Condensate
Flow (Btu/hr) % Fract
-2.54E+02 0.0112
-6.56E+02 0.0289
-7.21E+03 0.3173
-7.89E+03 0.3474
-0.00E+00 0.0000
-0.00E+00 0.0000
-0.00E+00 0.0000
-6.70E+03 0.2951
-0.00E+00 0.0000
-2.27E+00 0.0001
-0.00E+00 0.0000
-2.27E+04 1.000
-3.80E+05
Perhitungan kebutuhan Power Electric Heater
Fluida Dingin
- mass flow = 5.834 kg/hr = 12.861 lb/hr
- Heat = 4221892.9348 Btu/hr
- Viscosity = 0.4 centiPoise = 0.968 lb/ft.hr
- Heat Capacity = 0.5633 Btu/lbF
- Therm. Cond (k) = 0.058 Btu/(hr)(ft2)(F)
- T1 = 11.73 F
- T2 = 115.1 F
T 2 - T1
LMTD = R =
ln( T 2 / T1 )
S =
= 435.026 F
Ft = 1.000 (Fig. 18 Kern)
LMTDCor = 435.026
Q
A =
U D .t
= 194.098 Ft2 (asumsi luar permukaan transfer)
Tube Side
Length = 43.96 inch = 3.663042 ft
OD = 3/4 inch
ID = 5/8 inch
BWG = 16.000
Pass = 1 Pass
a" = 0.0020972222 Ft2
Jumlah Tube (Nt) = 2105.495257 (Calculation)
dari tabel 9 kern, Nt yang mendekati dengan Nt. Cal = 1206
Ud = 2.5621482923 Btu/(hr)(ft2)(F)
Dirt Factor
Rd = 0.0030106683
`
Summary
Pressure Drop
- Tube Side (Fluida Panas)
Spesific Vol. = 0.6749 Ft3/lb
s = 0.0237072159
Reynold Num. = 587.29219169
f = 0.0007 ft3/in2
Pressure Drop, Δp = 0.00
- Shell Side
De' = 0.0297349336 ft
Reynold Num. = 0.1285509276
f = 0.01 ft3/in2
s = 1
Pressure Drop, Δp = 0.00
Remark
(from HYSYS)
(from HYSYS)
(from HYSYS)
(from HYSYS)
0.211706638
1.268563263
(from HYSYS)
Shell side
ID = 39 Inch
Baffle Side = 19.5 Inch
Pass = 1 Inch
Pt = 3 1/3 inch. Triangular Pitch