Professional Documents
Culture Documents
Presentation BKL Cpo 2 Ok JKT PDF
Presentation BKL Cpo 2 Ok JKT PDF
STATION
U BULKING
•UNLOADING TO TANK
FARM
•UNLOADING TO TANK
FARM
•UNLOADING TO TANK
FARM
•UNLOADING
•LOADING
•INTER TANK FARM
•INTERCONECTION
•PUMP
•COMPRESSOR
•AIR STORAGE TANK
•ELECTRICAL
SYSTEM
•LAUNCER
•RECIEVER
•BLOW LINE
PIPERACK
•SPAN
•PONDASI
•PIPERACK
•PIPERACK
•SPAN
•SPAN
•PIPING ISOMETRIC
DRAWING
•PIPING DRAWING
•LINE DIAGRAM
TOTAL
•BoM No ITEM VOLUME UNIT JUMLAH
Alternatif 1 Alternatif 2
•RAB
1 Piping System
a. Unloading Pipeline 1 Ls 3.997.126.880 3.997.126.880 3.997.126.880
b. Interchange Loading Pipeline 1 Ls 1.876.871.959 1.876.871.959 1.876.871.959
Terbilang : Enam Puluh Dua Milyar Empat Ratus Empat Puluh Satu Juta Lima Ratus Sembilan Puluh Dua Ribu Seratus Lima Puluh tujuh Rupiah