Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

BENGKUL

STATION
U BULKING

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
SCOPE OF WORK
EQUIPMENT & PIGGING
ROUTING PIPERACK DRAWING BUDGET
ELECTRICAL SYSTEM

•PFD •PUMP •PIPERACK •LAUNCHER •ISODRAWING •RAB


•P&ID •COMPRESSOR •SPAN •RECIEVER •PIPING DRAWING •RKS TEKNIS
•LAYOUT •AIR STORAGE TANK •PONDASI •LINE DIAGRAM
•UNLOADING •ELECTRICAL
•LOADING SYSTEM
•INTER TANK FARM
•INTERCONECTION

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PFD

•TANK FARM TO JETTY

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PFD

•UNLOADING TO TANK
FARM

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
P&ID

•UNLOADING TO TANK
FARM

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
P&ID

•UNLOADING TO TANK
FARM

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
LAYOUT

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
ROUTING

•UNLOADING
•LOADING
•INTER TANK FARM
•INTERCONECTION

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
3D
MODELING

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
EQUIP &
ELECTRICA
L

•PUMP
•COMPRESSOR
•AIR STORAGE TANK
•ELECTRICAL
SYSTEM

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PIGGING
SYSTEM

•LAUNCER
•RECIEVER
•BLOW LINE

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PIPE RACK

PIPERACK
•SPAN
•PONDASI

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PIPE RACK

•PIPERACK

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PIPE RACK

•PIPERACK

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PIPE RACK

•SPAN

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
PIPE RACK

•SPAN

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
DRAWING

•PLOT PLAN DRAWING

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
DRAWING

•PIPING ISOMETRIC
DRAWING

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
DRAWING

•PIPING DRAWING
•LINE DIAGRAM

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
BUDGEJ
REKAPITULASI BIAYA
PEKERJAAN PEMBANGUNAN LOADING DAN UNLOADING PIPA TERMINAL CURAH CAIR PELABUHAN BENGKULU

TOTAL
•BoM No ITEM VOLUME UNIT JUMLAH
Alternatif 1 Alternatif 2
•RAB
1 Piping System          
  a. Unloading Pipeline 1 Ls 3.997.126.880 3.997.126.880 3.997.126.880
  b. Interchange Loading Pipeline 1 Ls 1.876.871.959 1.876.871.959 1.876.871.959

  c. Unloading to Storage Tank (BBM) 1 Ls 1.409.544.364 1.409.544.364 1.409.544.364


  d. Storage Tank to Jetty (BBM) 1 Ls 3.323.111.387 3.323.111.387 3.323.111.387
  e. Interchange to Jetty (CPO) 1 Ls 6.021.694.191 6.021.694.191 6.021.694.191
  f. Pipa Angin 1 Ls 2.607.546.929 2.607.546.929 2.607.546.929
2 Pipe Rack 1 Ls 5.937.808.108 5.937.808.108 5.937.808.108
3 Electrical Bulking 1 1 Ls 600.604.000 600.604.000 600.604.000
4 Electrical Bulking 2 1 Ls 711.501.000 711.501.000 711.501.000
5 Electrical Bulking 3 1 Ls 2.278.290.000 2.278.290.000 2.278.290.000
6 Electrical Bulking 4 1 Ls 976.119.000 976.119.000 976.119.000
7 Electrical Bulking 5 1 Ls 888.881.000 888.881.000 888.881.000
8 Loading Arm 4 bh 6.528.590.000 26.114.360.000 -
Jumlah Total 56.743.458.818 30.629.098.818
Tax 10% 5.674.345.882 3.062.909.882
Total 62.417.804.700 33.692.008.700

Terbilang : Enam Puluh Dua Milyar Empat Ratus Empat Puluh Satu Juta Lima Ratus Sembilan Puluh Dua Ribu Seratus Lima Puluh tujuh Rupiah

DISAIN SISTEM LOADING DAN UNLOADING PIPA


TCC PELABUHAN BENGKULU
TERIMA KASIH

You might also like