Constraint Simulator Toceng2.Xls: Excel Setup: Manual 1 Yes

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

Constraint Simulator TOCeng2.

xls
EXCEL Setup:
Tools/ Options/ Calculate/ select: Manual
Tools/ Options/ Calculate/ Iteration: max number of iterations 1
Enable macros: YES
Enlarge to ocupy the whole screen by selecting the right zoom at view
Additional information:
http://www.polyhedrika.com
Description:
This simulation program is meant for educational purposes only.
It simulates a manufacturing line with multiple operations and setup times.
It applies mainly to manufacturing processes
The purpose is to understand the dynamics of a manufacturing line with multiple constraints,
production lots, WIP, volumes build-up, etc.
Operation:
All figures in yellow are preset values which may be changed at any time
Press the Start button to start simulating and Escape key to stop and change any values
Reset will clear all WIP and set the number of kanbans selected
TOC1

TOCeng2.xls (c) 2004 Cornelio Abellanas ### ### ### ###


###
Veloc 11 ### ### ### ### ###
1 week day hour min
### ###

### 0 ### 0 ### 0


$40 40 b 7 40 c 5 40 d 6 $60
0 stop ### 0 stop ### 0 stop 0 0

### 0 ### ###

Cost 0 Initial capita 1000


Clean entries
Sales 0
Start Restart Wk 1
Materials 0 Balance ###
Overhead 2000 Profit ### Stop: Esc + End

Página 2
TOC2

TOCeng2.xls (c) 2004 Cornelio Abellanas ### ### ### ### ###
Velocidad 11 ### ### ### ### ###
1 week day hour min
### ###
$10 0 a 60 $40
### ### ### 0
P1
### 0 ### 0 ### 0 h ###
$10 40 b 7 40 c 5 40 d 6 g ### 40 $70
0 stop ### 0 stop ### 0 stop 0 ### ### ### ###
25 ### P
### 0 ### 0 ### ### $50
$10 40 e 12 40 f 8 0
0 stop ### 0 stop 0 ### P2

Cost 0 Initial capital 1000


Sales Err:523
Start Clean entries Restart Wk 1
Materials cost 0 Balance Err:523
Fixed cost 2000 Profit Err:523 Stop: Esc + End

Página 3

You might also like