Deluge Valve, Hydraulic Actuation

Series 700D/DG/DX - 04/14A 01 Local Resetting

Technical Data

Approvals
The Inbal Hydraulically Controlled
Deluge Valve series 700DG-04A is FM
approved to 300 psi (21 bar) in sizes 3",
4", 6", and 8" (80, 100, 150, and 200
mm). Consult the FM Approval Guide
for acceptable applications. Inbal
Deluge Valves have Lloyd's, DNV, and
ABS Type Approvals for all sizes.

Model Numbers
Inlet End Outlet End Model no.
Threaded Threaded 711DG-04A01
Threaded Grooved 716DG-04A01
Flanged Flanged 733DG-04A01
Flanged Grooved 736DG-04A01
Grooved Grooved 766DG-04A01
Wafer Wafer 799DG-04A01
"DG" can be replaced with "D" or "DX" depends
Model 799DG-04A01
on the Inbal Automatic Water Control Valve series
in use. See bulletins F02-01-01, F02-02-01, and
F02-03-01.
The above model numbers refer to fully trimmed
valves. For basic trim, replace "04" with "14".
(See also bulletin F01-03-01 for control trims "24"
& "34"). For example: 711DG-14A01 is a threaded
ends deluge valve with basic, hydraulically
General Description actuated trim.

The Inbal Deluge Valve with Hydraulic The control trim includes all the pilot Sizes
Actuation Trim is specifically designed valves, accessories, fittings, and gauges
for fire protection systems actuated by a to provide for proper operation in either Threaded End:
fire detection and release system of wet vertical or horizontal installation. The 1½", 2", 2½", & 3" (40, 50, 65, & 80 mm).
pilot sprinklers and/or hydraulic manual standard material Inbal Deluge Valve is Flanged and Grooved Ends:
control. The Inbal Automatic Water rated to 300 psi (21 bar) and is available 1½", 2", 2½", 3", 4", 6", 8", 10", & 12"
Control Valve, which is used in this in sizes 1½" (40 mm) to 12" (300 mm). (40, 50, 65, 80, 100,150, 200, 250, &
deluge system, is a pressure operated, The valves have threaded, flanged, 300 mm).
sleeve actuated, axial valve designed for grooved, or wafer inlet and outlet ends. Wafer End:
use in fire protection systems. The only moving part in the Inbal 3", 4", 6", 8", 10", & 12" (80, 100, 150,
The Inbal Hydraulically actuated Deluge Valve, when it operates, is the 200, 250, & 300 mm).
Deluge Valve is used for automatic or reinforced sleeve, which forms a drip-
manual operation. The wet pilot line tight seal with the corrosion resistant End Standards
functions as a thermal detector equipped core. It has a smooth opening to prevent Threaded End:
with a fixed temperature release. When any water hammer in the piping system . NPT or BSPT.
one or more of the sprinkler heads, The unique design and variety of Flanged End:
located on the pilot line, fuses, or when a materials and coatings make the Inbal ANSI B16.5 class 150 & 300 ;
manual release station is operated locally Deluge Valve ideally suitable for use in ISO 7005 - PN10, 16 & 25 ;
or remotely, the Inbal Deluge Valve brackish or sea water, similar to those BS 10 Table D & E ;
opens and water flows from all open found in chemical and petrochemical AS 2129 Table D & E ;
sprinklers and/or nozzles on the system. facilities or in offshore platforms. The Jis B 2212, 2213, 2214.
As soon as the releasing system and the Inbal can also be used as a foam Wafer End:
sprinkler piping are reset, the Inbal concentrate control valve in foam/water Fits most of the above standards.
Deluge Valve resetting is merely done by systems. Grooved End:
activating the reset knob. ANSI/AWWA C606-87.

Mil Ltd F03-02-01


Pressure Rating ! Trim Shutoff Valve, Flow Test Valve, Operation
Maximum working pressure*: 300 psi and Drain Valve are quarter turn ball
(21 bar). valves. The Control Chamber of the Inbal
! Supply and System Pressure Gauges, Automatic Water Control Valve is the
* standard material valve. with dual scale (psi and bar). annular space between the valve
! Pressure Gauge Valves - 3 way, quarter Housing and the Sleeve. The valve is
Temperature Range turn ball valves. held in a closed position as long as inlet
Water: Max. +1500F (+650C). ! Drain Cup and Drain Tubes. pressure is maintained in the Control
! Automatic Drain Valves. Chamber.
Installation Position ! Emergency Release Station . The wet pilot line, equipped with closed
Vertical or horizontal. sprinkler heads, is pressurized through
the valve trim and located over the
Materials Features protected area. The wet pilot line serves
Standard the dual purpose of thermal detection and
Valve Housing: ! No Moving Mechanical Parts
release system.
Forged Steel (SAE 1021). (N.M.M.P.) construction ensures a long
In the set position, water pressure is
Valve Ends and Wafer Flow Test & Drain life of dependable operation, reducing
applied to the Control Chamber of the
Ends: the cost of maintenance.
Inbal Deluge Valve and to the hydraulic
Ductile Iron (ASTM A536 65-45-12). ! Quick, yet soft opening performance -
release system from the upstream of the
Threaded, Flanged, and Grooved Flow eliminates water hammer and conse- Water Supply Valve. Consequently, the
Test & Drain Ends: quent damages. Inbal Deluge Valve stays closed.
Carbon Steel (SAE 1020). ! The line pressure is sufficient to close The Inbal Deluge Valve opens wide
Sleeve: the Inbal Valve tightly. Can perform when one or more of the sprinklers
SMR5 Elastomer reinforced with poly- also, when water supply valve is not in installed on the wet pilot line fuses and
ester and Kevlar. use. water pressure is allowed to vent, or
Control Trim: ! Optional opening and/or closing speed when a hydraulic manual release opens.
Brass Nickel Chrome plated, Stainless control is available. Either one of these operations releases
Steel, and Galvanized Steel. ! Anticolumning device is available for water from the Inbal Control Chamber.
Optional long or high elevation wet pilot line. The Inbal Deluge Valve opens fully
Cast Steel ; ! Fast and easy reset by thumb activated introducing a flow of water to the system
Bronze ; knob. while activating the system alarm
Nickel Aluminium Bronze ; ! Supplied as standard preassembled in devices. Water will flow from any open
Stainless Steel AISI 316 ; sections - saves the self assembly cost. sprinklers and/or spray nozzles on the
Super Austenitic Stainless Steel ; system. The operation of the Inbal
! Remote emergency release stations can
Super Duplex Stainless Steel ; Deluge Valve and the flow released from
be used for manual operation.
Titanium. the Control Chamber activate the Flow
! Can be installed vertically or Release Pilot (F.R.P) to latch in an open
Coating horizontally. position, isolating the Control Chamber
Standard ! Compact design - minimum space for from the inlet water supply. The F.R.P
Powder epoxy coated. Thickness: 0.004" valve and trim. operation prevents the Inbal Deluge
(0.1 mm) external and internal surfaces. ! Unique principle of operation prevents Valve from closing even if the open
Optional false operation due to water surges. releasing wet pilot line closes. The Inbal
! Pressure rating to 300 psi (21 bar) for Valve will close only when the Resetting
High built epoxy coated and polyure-
standard material valve. procedure is followed.
thane finish. Thickness: 0.01" (0.3 mm).
The maximum elevations in which the
Halar ® coated. Thickness: 0.02" ! Wide range of sizes for an ideal system
wet pilot sprinklers or manual release
(0.5 mm) . design.
stations can be installed are shown on
Halar ® is a registered trademark of AusimontUSA Inc. ! Control trim made of high grade Graph (1).They are presented in relation
materials as standard. to the various lengths of pilot lines and to
! Epoxy coating supplied as standard - the water supply pressure.
Control Trim
ensures excellent corrosion resistance. The Emergency Release Valve is used
On standard, the control trim is supplied ! Variety of available materials - to for emergency actuation of the Inbal
preassembled in sections. If self ensure corrosion-free service even Deluge Valve and for routine testing.
assembly is required, all the trim under severe conditions.
components are supplied in loose form. ! The same basic trim is compatible with
The complete control trim includes the electric, pneumatic, and/or hydraulic
following components : release.
! Flow Release Pilot (F.R.P.) with a built- ! Additional functions, such as pressure
in check valve. control or another release system,
! Y- Strainer with a stainless steel screen. could be added on the same valve body.
! Alarm Test Valve - 3 way, L-port,
quarter turn ball valve.

F03-02-01-002
Installation Schematic Control Diagram _ 700DG- 04A01

Refer to the Trim Chart applicable to the


Inspector's
specific Inbal Deluge Valve model in e Test Valve
Lin
use. To Water ot
t Pil
Motor We
Alarm
01. When the Inbal Deluge Valve is To Alarm
To System
Pressure
delivered, carefully unpack and visu- Switch
ally check that there has been no 100

50
7a
damage to the operating components, 0

300

100
7b
piping, and fittings. 17
50

0
1
300

02. Always flush the pipelines before


installing the Inbal Valve. 6 4
03. Place the Inbal Valve in the piping at
the outlet of the Water Supply Valve. 5 To
Drain
Verify that the arrow on the valve
Housing matches the actual flow Y
4
NC

direction. Determine which side the MA


GE LVE
ER VA
EMNUAL SE
CLO
3 18b

system will be accessed from and To Drain


To Drain
locate the Inbal Deluge Valve OP
E N

2
accordingly.
04. Install the Inbal Deluge Valve in the To optional release
To Drain systems (hydraulic,
pipeline. Use gaskets, bolts, stud Water
electric, or pneumatic)
Supply 18a
bolts, bolt sleeves, and nuts as Valve
required by the valve ends. To Drain
05. Complete the trim assembly by
connecting the preassembled 1 Inbal Automatic Water Control Valve 7a Supply Pressure Gauge
sections, or assemble the trim if 2 Emergency Release Station 7b System Pressure Gauge
ordered in loose component form. 3 Flow Release Pilot (F.R.P.) 17 Alarm Test Valve
Refer to the applicable Trim Chart 4 Automatic Drain Valves 18a Flow Test Valve
and Installation Guide. 5 Trim Shutoff Valve 18b Drain Valve
6 Y-Strainer
06.The water pressure supply to the
control trim must always be sourced
from the inlet of the Water Supply
Valve through a ½" pipe. 10.Fully open the Water Supply Valve.
07. Connect the wet pilot line to the Flow Resetting
Verify that there is no flow from the
Release Pilot (F.R.P.). Refer to Graph Drain Valve, downstream of the
(1) which shows the maximum The Inbal Deluge Valve system must be
reset and restored to service as soon as Inbal Valve.
elevations above the Deluge Valve at 11.Close the Drain Valve.
which the release line (pilot sprink- possible after automatic, emergency, or
lers or manual release) should be manual actuation.
installed. An Anticolumning Device The procedure is as follows: Maintenance, Inspection, & Testing
is required when the release line 01.Close the Water Supply Valve. Water
elevation exceeds the figure corres- flow alarms are reset. It is recommended that periodic inspec-
ponding to the minimum water 02.Close the Trim Shutoff Valve. tions and tests be conducted by qualified
supply system pressure in which the 03.Open the Flow Test Valve and Drain personnel to ensure that the Inbal
Inbal Deluge Valve is planned to Valve, allowing all the water to drain. Deluge Valve and related equipment are
perform. 04.Inspect and replace any portion of the in good operating condition. The
08. It is recommended to install an inspe- detection system subjected to fire inspection and testing activities should
ctor's test valve on the hydraulic conditions. be done according to NFPA Standards,
release system. The inspector's test 05.Inspect the trim and alarm Y- the guidelines and regulations of the
valve is a locked closed ball valve Strainers. Clean if necessary. authorities having jurisdiction, and the
with an outlet end orifice equivalent 06.Verify that the Emergency Release following instructions. It is recom-
to the smallest orifice of the releasing Valve is in a closed position. mended that the Deluge Valve be tested,
device provided on the system. The 07.Open the Trim Shutoff Valve. Push operated, cleaned, and inspected at least
inspector's test valve may be used to and hold the reset knob on the F.R.P. on a routine basis.
verify adequate operation of the and allow water pressure to build up
deluge system when a releasing in the trim and in the Inbal Valve Inspection
device operates. Control Chamber. Wait and verify A weekly Inspection is recommended:
09. Set the Inbal Deluge Valve by that the pressure readings on both 1.Verify that the Water Supply Valve is
following the Resetting procedure. pressure gauges are equal. sealed in fully open position.
10. Test the Inbal Valve, the trim, and the 08.Release the reset knob on the Flow 2. Verify that the required water
alarms according to the Testing Release Pilot (F.R.P). pressure is being applied to the Inbal
procedure. 09.Close the Flow Test Valve. Deluge Valve inlet and trim.

F03-02-01-003
Deluge Valve, Hydraulic Actuation
Series 700D/DG/DX - 04/14 A 01

Wet Pilot Line - Design Data Trip Testing


An annual Trip Testing is recommended.

m) m)
00 75
Performing the Trip Testing will cause

m)

m)

)
t (2 ft (1

0m
m)

m)

0m
0
0
50

00
ng nt water to flow from all open sprinklers

40

45

50
35
uiv e

66 5 7 5
Eq t Lin
Le a l e

t (2

t (3

ft (

ft (

ft (
ft (
th
and/or nozzles. Prevent damage by

to
0f

0f

0f

10

75

50
50
o

m H2O ft H2 O

Up
Pil

82

99

13

14

16
11
150 taking necessary precautions.
1. Open the Flow Test Valve to flush
40
away any debris or foreign particles
MAX. ELEVATION OF WET PILOT LINE

120 which may have accumulated in the


30
Inbal Deluge Valve inlet.
90 2.Close the Flow Test Valve.
3. Trip the Inbal Valve to open by either:
20 a) Opening the inspector’s test valve.
60 b) Opening the Emergency Release
Valve.
10 30
The water in the Inbal Valve Control
Chamber is released to the atmos-
phere. The Inbal Deluge Valve will
0 0 open wide and water will flow to the
20 40 60 80 100 120 140 160 180 280 300 psi
system. All the water flow alarms
2 3 4 5 6 7 8 9 10 11 12 20 21 bar should operate. Verify that the whole
WATER SUPPLY SYSTEM PRESSURE
Based on ½'' (15 mm) Schedule 40 pipe
system is working properly.
4. Close the inspector's test valve or the
If the maximum elevation of hydraulic release piping exceeds the limits Emergency Release Valve.
shown on the graph, use anticolumning device model 395-08 (see bulletin F40-14-01).
5. Reset the valve by performing the
Graph (1) instructions in Resetting.

Removal
3.Verify that the Trim Shutoff Valve, 3.Close the Alarm Test Valve. All local To remove the Inbal Deluge Valve:
Alarm Test Valve, Emergency Release alarms should stop sounding and 1.Close all the pressure supplies:
Valve, Pressure Gauge Valves, Flow pressure switch is reset. a) Water Supply Valve.
Test Valve, and Drain Valve are in set 4.Verify that the supply piping to the b) Trim Shutoff Valve.
position. alarm drains properly . 2. Open the Emergency Release Valve to
4.The Supply and System Pressure release the water pressure from the
Deluge Trim Testing
Gauges should be checked for Inbal Valve Control Chamber.
accuracy. A semi-annual Deluge Trim Testing
is recommended. Testing of the control 3.Open the Flow Test Valve and Drain
5.Visually inspect for broken or Valve to allow all the water to drain.
missing parts, or other evidence trim is conducted with no flow of water
to the system. 4. Disconnect the union and remove the
of impaired protection. trim from the valve.
1. Open the Flow Test Valve to flush
away debris or foreign particles 5. Remove the Inbal Valve from the line
Strainer Cleaning
which may have accumulated in the for inspection.
A quarterly Strainer Cleaning is 6. To reinstall, follow the Installation
recommended: Inbal Deluge Valve inlet.
2. Close the Flow Test Valve. procedure (use new gaskets for
1. Close the Trim Shutoff Valve . flanged or wafer valve).
2. Remove the covers of the trim and 3. Close the Water Supply Valve
alarm Y- Strainers. Clean if necessary. installed in the inlet of the Inbal
Deluge Valve. Inquiries/Orders
3.Open the Trim Shutoff Valve .
4. Open the inspector's test valve in the The Data Sheet For Inquiries/Orders
Alarm Testing hydraulic release system. Water (bulletin F01-05-01) should be
A quarterly Alarm Testing is should be drained from the deluge submitted.
recommended: trim. Verify that the pressure reading
1.Test the Water Motor Alarm or Alarm on the System Pressure Gauge drops
Pressure Switch by opening the Alarm to zero which simulates an open
Test Valve. position of the Inbal Deluge Valve.
2.Water Motor Alarm should be audible. 5.Reset the valve by performing the
Alarm Pressure Switch should instructions in Resetting.
activate.

Mil Ltd. 17 Moshe Beker Street, P.O.Box 15200, Rishon Lezion 75051, Israel. Tel: +972 3 966 4350, Fax: +972 3 966 4320, E-mail:inbalvl@ attglobal.net