Technical Data
Approvals
The Inbal Hydraulically Controlled
Deluge Valve series 700DG-04A is FM
approved to 300 psi (21 bar) in sizes 3",
4", 6", and 8" (80, 100, 150, and 200
mm). Consult the FM Approval Guide
for acceptable applications. Inbal
Deluge Valves have Lloyd's, DNV, and
ABS Type Approvals for all sizes.
Model Numbers
Inlet End Outlet End Model no.
Threaded Threaded 711DG-04A01
Threaded Grooved 716DG-04A01
Flanged Flanged 733DG-04A01
Flanged Grooved 736DG-04A01
Grooved Grooved 766DG-04A01
Wafer Wafer 799DG-04A01
"DG" can be replaced with "D" or "DX" depends
Model 799DG-04A01
on the Inbal Automatic Water Control Valve series
in use. See bulletins F02-01-01, F02-02-01, and
F02-03-01.
The above model numbers refer to fully trimmed
valves. For basic trim, replace "04" with "14".
(See also bulletin F01-03-01 for control trims "24"
& "34"). For example: 711DG-14A01 is a threaded
ends deluge valve with basic, hydraulically
General Description actuated trim.
The Inbal Deluge Valve with Hydraulic The control trim includes all the pilot Sizes
Actuation Trim is specifically designed valves, accessories, fittings, and gauges
for fire protection systems actuated by a to provide for proper operation in either Threaded End:
fire detection and release system of wet vertical or horizontal installation. The 1½", 2", 2½", & 3" (40, 50, 65, & 80 mm).
pilot sprinklers and/or hydraulic manual standard material Inbal Deluge Valve is Flanged and Grooved Ends:
control. The Inbal Automatic Water rated to 300 psi (21 bar) and is available 1½", 2", 2½", 3", 4", 6", 8", 10", & 12"
Control Valve, which is used in this in sizes 1½" (40 mm) to 12" (300 mm). (40, 50, 65, 80, 100,150, 200, 250, &
deluge system, is a pressure operated, The valves have threaded, flanged, 300 mm).
sleeve actuated, axial valve designed for grooved, or wafer inlet and outlet ends. Wafer End:
use in fire protection systems. The only moving part in the Inbal 3", 4", 6", 8", 10", & 12" (80, 100, 150,
The Inbal Hydraulically actuated Deluge Valve, when it operates, is the 200, 250, & 300 mm).
Deluge Valve is used for automatic or reinforced sleeve, which forms a drip-
manual operation. The wet pilot line tight seal with the corrosion resistant End Standards
functions as a thermal detector equipped core. It has a smooth opening to prevent Threaded End:
with a fixed temperature release. When any water hammer in the piping system . NPT or BSPT.
one or more of the sprinkler heads, The unique design and variety of Flanged End:
located on the pilot line, fuses, or when a materials and coatings make the Inbal ANSI B16.5 class 150 & 300 ;
manual release station is operated locally Deluge Valve ideally suitable for use in ISO 7005 - PN10, 16 & 25 ;
or remotely, the Inbal Deluge Valve brackish or sea water, similar to those BS 10 Table D & E ;
opens and water flows from all open found in chemical and petrochemical AS 2129 Table D & E ;
sprinklers and/or nozzles on the system. facilities or in offshore platforms. The Jis B 2212, 2213, 2214.
As soon as the releasing system and the Inbal can also be used as a foam Wafer End:
sprinkler piping are reset, the Inbal concentrate control valve in foam/water Fits most of the above standards.
Deluge Valve resetting is merely done by systems. Grooved End:
activating the reset knob. ANSI/AWWA C606-87.
F03-02-01-002
Installation Schematic Control Diagram _ 700DG- 04A01
50
7a
damage to the operating components, 0
300
100
7b
piping, and fittings. 17
50
0
1
300
2
accordingly.
04. Install the Inbal Deluge Valve in the To optional release
To Drain systems (hydraulic,
pipeline. Use gaskets, bolts, stud Water
electric, or pneumatic)
Supply 18a
bolts, bolt sleeves, and nuts as Valve
required by the valve ends. To Drain
05. Complete the trim assembly by
connecting the preassembled 1 Inbal Automatic Water Control Valve 7a Supply Pressure Gauge
sections, or assemble the trim if 2 Emergency Release Station 7b System Pressure Gauge
ordered in loose component form. 3 Flow Release Pilot (F.R.P.) 17 Alarm Test Valve
Refer to the applicable Trim Chart 4 Automatic Drain Valves 18a Flow Test Valve
and Installation Guide. 5 Trim Shutoff Valve 18b Drain Valve
6 Y-Strainer
06.The water pressure supply to the
control trim must always be sourced
from the inlet of the Water Supply
Valve through a ½" pipe. 10.Fully open the Water Supply Valve.
07. Connect the wet pilot line to the Flow Resetting
Verify that there is no flow from the
Release Pilot (F.R.P.). Refer to Graph Drain Valve, downstream of the
(1) which shows the maximum The Inbal Deluge Valve system must be
reset and restored to service as soon as Inbal Valve.
elevations above the Deluge Valve at 11.Close the Drain Valve.
which the release line (pilot sprink- possible after automatic, emergency, or
lers or manual release) should be manual actuation.
installed. An Anticolumning Device The procedure is as follows: Maintenance, Inspection, & Testing
is required when the release line 01.Close the Water Supply Valve. Water
elevation exceeds the figure corres- flow alarms are reset. It is recommended that periodic inspec-
ponding to the minimum water 02.Close the Trim Shutoff Valve. tions and tests be conducted by qualified
supply system pressure in which the 03.Open the Flow Test Valve and Drain personnel to ensure that the Inbal
Inbal Deluge Valve is planned to Valve, allowing all the water to drain. Deluge Valve and related equipment are
perform. 04.Inspect and replace any portion of the in good operating condition. The
08. It is recommended to install an inspe- detection system subjected to fire inspection and testing activities should
ctor's test valve on the hydraulic conditions. be done according to NFPA Standards,
release system. The inspector's test 05.Inspect the trim and alarm Y- the guidelines and regulations of the
valve is a locked closed ball valve Strainers. Clean if necessary. authorities having jurisdiction, and the
with an outlet end orifice equivalent 06.Verify that the Emergency Release following instructions. It is recom-
to the smallest orifice of the releasing Valve is in a closed position. mended that the Deluge Valve be tested,
device provided on the system. The 07.Open the Trim Shutoff Valve. Push operated, cleaned, and inspected at least
inspector's test valve may be used to and hold the reset knob on the F.R.P. on a routine basis.
verify adequate operation of the and allow water pressure to build up
deluge system when a releasing in the trim and in the Inbal Valve Inspection
device operates. Control Chamber. Wait and verify A weekly Inspection is recommended:
09. Set the Inbal Deluge Valve by that the pressure readings on both 1.Verify that the Water Supply Valve is
following the Resetting procedure. pressure gauges are equal. sealed in fully open position.
10. Test the Inbal Valve, the trim, and the 08.Release the reset knob on the Flow 2. Verify that the required water
alarms according to the Testing Release Pilot (F.R.P). pressure is being applied to the Inbal
procedure. 09.Close the Flow Test Valve. Deluge Valve inlet and trim.
F03-02-01-003
Deluge Valve, Hydraulic Actuation
Series 700D/DG/DX - 04/14 A 01
m) m)
00 75
Performing the Trip Testing will cause
m)
m)
)
t (2 ft (1
0m
m)
m)
0m
0
0
50
00
ng nt water to flow from all open sprinklers
40
45
50
35
uiv e
66 5 7 5
Eq t Lin
Le a l e
t (2
t (3
ft (
ft (
ft (
ft (
th
and/or nozzles. Prevent damage by
to
0f
0f
0f
10
75
50
50
o
m H2O ft H2 O
Up
Pil
82
99
13
14
16
11
150 taking necessary precautions.
1. Open the Flow Test Valve to flush
40
away any debris or foreign particles
MAX. ELEVATION OF WET PILOT LINE
Removal
3.Verify that the Trim Shutoff Valve, 3.Close the Alarm Test Valve. All local To remove the Inbal Deluge Valve:
Alarm Test Valve, Emergency Release alarms should stop sounding and 1.Close all the pressure supplies:
Valve, Pressure Gauge Valves, Flow pressure switch is reset. a) Water Supply Valve.
Test Valve, and Drain Valve are in set 4.Verify that the supply piping to the b) Trim Shutoff Valve.
position. alarm drains properly . 2. Open the Emergency Release Valve to
4.The Supply and System Pressure release the water pressure from the
Deluge Trim Testing
Gauges should be checked for Inbal Valve Control Chamber.
accuracy. A semi-annual Deluge Trim Testing
is recommended. Testing of the control 3.Open the Flow Test Valve and Drain
5.Visually inspect for broken or Valve to allow all the water to drain.
missing parts, or other evidence trim is conducted with no flow of water
to the system. 4. Disconnect the union and remove the
of impaired protection. trim from the valve.
1. Open the Flow Test Valve to flush
away debris or foreign particles 5. Remove the Inbal Valve from the line
Strainer Cleaning
which may have accumulated in the for inspection.
A quarterly Strainer Cleaning is 6. To reinstall, follow the Installation
recommended: Inbal Deluge Valve inlet.
2. Close the Flow Test Valve. procedure (use new gaskets for
1. Close the Trim Shutoff Valve . flanged or wafer valve).
2. Remove the covers of the trim and 3. Close the Water Supply Valve
alarm Y- Strainers. Clean if necessary. installed in the inlet of the Inbal
Deluge Valve. Inquiries/Orders
3.Open the Trim Shutoff Valve .
4. Open the inspector's test valve in the The Data Sheet For Inquiries/Orders
Alarm Testing hydraulic release system. Water (bulletin F01-05-01) should be
A quarterly Alarm Testing is should be drained from the deluge submitted.
recommended: trim. Verify that the pressure reading
1.Test the Water Motor Alarm or Alarm on the System Pressure Gauge drops
Pressure Switch by opening the Alarm to zero which simulates an open
Test Valve. position of the Inbal Deluge Valve.
2.Water Motor Alarm should be audible. 5.Reset the valve by performing the
Alarm Pressure Switch should instructions in Resetting.
activate.
Mil Ltd. 17 Moshe Beker Street, P.O.Box 15200, Rishon Lezion 75051, Israel. Tel: +972 3 966 4350, Fax: +972 3 966 4320, E-mail:inbalvl@ attglobal.net
March 2000 / F03-02-01