Professional Documents
Culture Documents
Invitation TO Tender B: Tenderers Response: Documents To Be SUBMITTED by TENDERER
Invitation TO Tender B: Tenderers Response: Documents To Be SUBMITTED by TENDERER
Failure to submit any documentation included in this Part B or comply with the requirements of
this document may result in the disqualification of your tender
Tenders MUST be uploaded into Council’s eTendering Portal located at the hyperlink:
https://etendering.gleneira.vic.gov.au by 2:00 pm on Friday, 13 September 2019.
( Please Complete )
Invitation To Tender Part B * Documents to be Submitted by Tenderer
Tender / Contract No: 2020.26
Project: Moorleigh Village Community Shed
Address: 90-92 Bignell Rd, East Bentleigh. 3165
TABLE OF CONTENTS
B2 FORM OF TENDER
B3 TENDERER DETAILS
B3.1 METHOD OF TRADING
B3.2 SOLE TRADER DETAILS
B3.3 PARTNERSHIP DETAILS
B3.4 COMPANY DETAILS
B3.5 OTHER TRADING METHOD DETAILS
B3.6 INSURANCE COVER DETAILS
B4 SCHEDULES
B4.1 TENDERERS RESPONSE
B4.2 MATERIALS TO BE COMPLETED
B4.3 TENDER SUMMARY
TABLE OF CONTENTS
B1.1.1 Tenders MUST be uploaded into Council’s eTendering Portal located at the hyperlink:
https://etendering.gleneira.vic.gov.au by 2 00 pm on Friday, 13 September 2019.
B1.2.1 All documents in Part B are to be completed and submitted as part of the tender. Failure to do so may
result in Council treating any such tender as constituting a non conforming tender.
TABLE OF CONTENTS
B1.2.2 All schedules MUST be fully completed including rates for all items listed. Tenders which fail to provide
all the required information may be treated as non conforming (hashes, “TBA” or any other expression
is not acceptable).
B1.2.3 All supporting Tender documents must be scanned for submission, including but not limited to, supporting
brochures, annual reports, insurance certificates, OH&S, AS/NZS4801 certification, Quality ISO9001
certification, similar documents etc.
B1.2.4 Tenderers will be considered to be “fully informed”. All the documentation MUST be read in its entirety.
All rates submitted (including subcontractors) will be deemed to have been prepared in accordance with all
documentation.
B1.3.1 If the tender is submitted on any Conditions of Tender which differ from Council’s Conditions, such
difference must be clearly stated in Schedule 6B. Council may treat any such tender as constituting a
non conforming tender.
B1.4.1 If the Tenderer requires any alteration to the Standard Conditions of Contract, such alterations must be
clearly stated in Schedule 6C if such a schedule is provided in these documents. Council may treat any
requirement for alteration as constituting a non conforming tender.
B1.5.1.1 current Public Liability Insurance including the amount of cover; and
Dear Sir
Having examined the Standard Conditions of Tendering, Special Conditions of Tender, General Conditions of
Contract, Special Conditions of Contract, Schedules, and all other documents relating to this Tender (the "Tender
Documents") for the performance of the above work, I/we offer to carry out the said Services in conformity therewith
for the price or rates stated in the attached completed Schedules.
Until a formal agreement is prepared and executed, this document, together with your written acceptance thereof, shall
constitute a binding Contract between us. I/we understand you are not bound to accept the lowest or any Tender you
may have received, and you will not pay any expenses incurred by me/us in connection with the preparation and
submission of this Tender.
I/we will, within fourteen (14) days from the date of notification of Acceptance of this Tender, execute a Contract
with the Council in the terms contained within the Tender Documents.
IF TENDERER IS A COMPANY:
THE COMMON SEAL OF:
CARLOS ABREU
(Director) (Director / Secretary)
DIRECTOR
(Name of Signatory) (Title of Signatory)
…………………………………….……………………………………………………..….. ($2,567,305.6)
B3.1 METHOD OF TRADING (please Tick (√) the applicable option below)
🗆 Other
(If Other, provide details - include Trusts, multiple individual Tenderers not in formal partnership,
proposed partnerships or companies, Unincorporated Associations, Committees, etc, and ensure you fully
complete details under “Other Trading Method Details”)
B3.2 SOLE TRADER DETAILS (if no Trading Name, state “Not Applicable”)
Trading Name:
Trading Address: (for the purposes of this Tender / Contract including service of Notices)
Telephone: ABN:
Business Bank Name / Branch: (used for daily or other regular trading activity)
(Attach additional sheets if more than four (4) parties are involved)
Trading Name:
Trading Address: (for the purposes of this Tender / Contract including service of Notices)
Telephone: ABN:
Business Bank Name / Branch: (used for daily or other regular trading activity)
540 Whitehorse Rd, Mitcham VIC 3132 (used for daily or other regular trading activity)
Insert full details consistent with the type of information sought in respect of other trading types listed
above.
All parties in this category must provide sufficient details to enable Council to be satisfied that the
Tenderer has the legal capacity to contract and to hold the insurances required under the Contract.
Attention is also drawn to the provision of the Standard Conditions prohibiting changes in the effective
control of the Tenderer during the term of the Contract. Parties in this category must provide an
additional sheet setting out signatures and titles as they will appear in the Contract.
B1.6 INSURANCE COVER DETAILS (Insert details of current insurance held below)
WORKCOVER REGISTRATION:
Please attach copies of Certificates of Currency for the above insurances to your Tender.
B4.1.1 The following Schedules which form part of the Tenderers Response MUST be completed and submitted
by the Tenderer.
B4.2.1 Tenderers MUST complete and comply with the following provisions.
B4.2.2 All schedules MUST be fully completed in the format presented, including rates for ALL items listed.
Tenders which fail to provide all the required information may be deemed non-conforming (ie., TBA
is not acceptable).
B4.2.3 Tenderers will be considered to be fully informed. The documentation MUST be read in its entirety. ALL
rates submitted will be deemed to have been prepared in accordance with all documentation.
All amounts submitted in the Schedules shall allow for all associated general expenses.
B4.3.2 For Tender evaluation purposes only, the estimated total amount of this Tender calculated in accordance
with the Specifications and plans are –
Total figure in writing: Two millions one hundred twenty thousand nine hundred ten dollars and
ninety cents.
ITE
DESCRIPTION
M AMOUNT $
1. Capping / Demolition of Hydraulic Services $25,520.00………………
Main Works
2. - Pit excavation -Pipe excavation - Filling works - Gutters
connections. $17,930.60……………
6. Preliminaries $6,000.00……………
GST $13,776.17………………
Note: All rates must be completed. Failure to supply all the rates as detailed above may
render the tender non-conforming.
13.
$…………………………
GST $7,431.90………………
Total of Schedule 1C – (GST incl) $81,750.90……………
Note: All rates must be completed. Failure to supply all the rates as detailed above may
render the tender non-conforming.
The following schedule of technical details forms part of the specification and must be
completed in full and returned with the tender
Details Insulation
Manufacturer Daikin Fantech
Type
Thermal Resistivity
Thickness
Density
R-Value
Thickness
Density
Details Pipework
Manufacturer Daikin Fantech
Type
R-Value
Thickness
Density
A/C Controllers
Relays
Fuses
Circuit Breakers
6 Demolition $3,800.00……………
14 Earthing $5,200.00………………
GST $17,076.00…………
Supply and installation of one gang light switch incl. 20m cable $ 182 each
Supply and installation of one lighting point incl. 15m cable $ 154 each
Luminaires
Luminaire Type Supply/Delete (Unit Only) Installed Cost
1R $ 434 $ 560
1S $ 98 $ 238
1W $ 112 $ 252
1X $ 280 $ 448
1E $ 133 $ 245
2E $ 161 $ 259
3E $ 133 $ 245
Electrical and Telecommunication Pits with Medium Duty Covers – Supply, Install and Finish to
Surface Level
450x450 preformed PVC pit and lid 450x450 $ 119 each
600x600 preformed PVC pit and lid 600x600 $ 189 each
900x1200 preformed PVC pit and lid 900x1200 $ 294 each
Power Cables
TPS supplied and installed on cable tray or catenary
Supply and installation on cable tray (excluding cable tray) per metre of the following copper cables,
including terminations at each end:
Supply and installation on Catenary per metre of the following copper cables, including terminations at
each end:
Electrical Accessories
Accessories to include supervision, supply, install, test, commission
Switchboard
Switchboard Supply and Installation
Supply and installation of 1x standard 16A and 20A single phase MCB,
including termination of sub-circuit cable. $ 238 each
Supply and installation of 1x standard 16A and 20A single phase
MCB/RCD, including termination of sub-circuit cable. $ 224 each
Power
Power Cable Supply and Installation
Supply and installation of 1x wall mounted double 10A SSO including
20m of cable $ each
Supply and installation of one 15A GPO including 20m cable
connection to sub-circuit $ each
Supply and installation of 1x wall mounted weatherproof isolator 20A
single phase direct connection including 40m of cable. $ each
Supply and installation of 1x wall mounted weatherproof isolator 20A
three phase direct connection including 40m of cable. $ each
Supply and installation of un-switched power outlet on existing lighting $ each
circuit
Supply and installation of un-switched power outlet on new lighting $ each
circuit including 20m cable connection to sub-circuit
Installation of skirting duct 10A double GPO including 20m cable $ each
connection to sub-circuit
Cable Tray
Additional Cost Deletion Cost
Cable Tray Supply and Installation
(per mtr) (per mtr)
300mm Cable tray including brackets and
accessories (installed) $ 160.79 $
Access Control
Proximity Reader – Card Reader (reed switch) $ each
Supply and Install
Tenderers are required to list below the resources that are intended to be used on this Contract and the working rate
and standby rate sought for the use of the resource on Day Works. Rates shall include all overhead administration
costs, all operator costs including site allowance, mobilisation costs, fuel, servicing and profits, but excluding
Contractor supervision costs for the resource.
HOURLY HOURLY
ITEM
HIRE RATE STANDBY RATE
LOADERS
HOURLY HOURLY
ITEM
HIRE RATE STANDBY RATE
GRADERS
PAVING MACHINES
CRANES
HOURLY HOURLY
ITEM
HIRE RATE STANDBY RATE
$/hr $/hr
Brick / Block layer
160 90
Carpenter
135 70
Concreter
150 60
Electrician
140 60
Security System Technician
110 60
Excavator Operator
150 150
Site Manager
130 90
Foreman
120 60
Glazier
155 90
Joiner
130 70
Labourer - skilled
80 45
Labourer - unskilled
70 40
Landscaper
140 100
Mechanical technician
160 100
Painter
135 50
Plasterer
130 50
Plumber
180 100
Project Manager
160 100
Roofer
180 100
Steelworker 180 100
Tiler 100
160
$/hr $/hr
Waterproofer 135 50
The Tenderer is to signify whether or not its Tender conforms to the requirements of the Tender Documents by striking
out below ** that which is applicable.
Should the Tender not conform with the requirements of the Tender Documents, the Tenderer shall list below all areas
of non-conformance and the reason for such non-conformance and shall value * each such non-conformance so that
in the event of the non-conformance being deemed unacceptable, the Contract Sum can be adjusted accordingly. If
the non-conformances are not priced and are determined to be unacceptable, the Tender may not be further considered.
* VALUE OF
AREA OF NON-CONFORMANCE AND REASON NON CONFORMANCE
($)
DOES CONFORM
The Tenderer is to signify if it requires any variation to the Conditions of Tender to be considered by Council and to
indicate whether submission of the Tender is subject to such conditions being accepted.
Council may treat any such requirement as constituting a non conforming Tender.
TENDER IS CONDITIONAL
CHANGE(S) REQUIRED TO CONDITIONS OF TENDER ON CHANGES BEING
ACCEPTED YES / NO
CONFORM
The Tenderer is to signify if it requires any variation to the Conditions of Contract to be considered by Council and to
indicate whether submission of the Tender is subject to such conditions being accepted.
Council may treat any such requirement as constituting a non conforming Tender.
TENDER IS CONDITIONAL
CHANGE(S) REQUIRED TO CONDITIONS OF CONTRACT ON CHANGES BEING
ACCEPTED YES / NO
CONFORM
The Tenderer is to acknowledge that it received the addenda listed below during the Tender period and that the Tender
has been prepared having regard to these addenda.
Shed_DRAWINGS
2020.26 Moorleigh Village Community Shed_DRAWINGS 09/09/2019
Arch
A100 _COVER SHEET 09/09/2019
A101 _DEMOLITION PLAN 09/09/2019
A102 _HOARDING PLAN 09/09/2019
A103 _ALLOTMENT PLAN 09/09/2019
A109 _SITE PLAN 09/09/2019
A110 _FLOOR PLAN 09/09/2019
A111 _FLOOR PLAN - POWER LAYOUT 09/09/2019
A112 _REFLECTED CEILING PLAN 09/09/2019
A113 _ROOF PLAN 09/09/2019
A120 _EAST & WEST ELEVATIONS 09/09/2019
A121 _NORTH & SOUTH ELEVATIONS 09/09/2019
A130 _SECTIONS 09/09/2019
A131 _SECTIONS 09/09/2019
A140 _GENERATOR ROOM AREA 09/09/2019
A141 _KITCHEN LAYOUT & DETAILS 09/09/2019
A142 _ROOFING DETAILS 09/09/2019
A143 _TIMBER, BALUSTRADES & GATES DETAILS 09/09/2019
A144 _DETAILS 09/09/2019
A150 _DOOR SCHEDULE_TENDER ISSUE T1 09/09/2019
A160 _FINISHES SCHEDULE_TENDER ISSUE T2 09/09/2019
Civ 09/09/2019
C0-00 [B] COVER SHEET, GENERAL NOTES AND LOCALITY PLAN 09/09/2019
C2-00 [B] CIVIL LAYOUT AND STORMWATER DRAINAGE PLAN 09/09/2019
C3-80 [B] CIVIL DETAILS 09/09/2019
C4-20 [B] STORMWATER WORKS DETAILS 09/09/2019
C4-60 [B] STORMWATER CATCHMENT PLAN 09/09/2019
Elec 09/09/2019
BR-E5250 Rev B 09/09/2019
BR-E5251 Rev B 09/09/2019
BR-E5300 Rev B 09/09/2019
BR-E5400 Rev B 09/09/2019
BR-E5450 Rev B 09/09/2019
GECC 09/09/2019
GECC STD DWGS 09/09/2019
Hydr 09/09/2019
BR-H5500 Rev B 09/09/2019
BR-H5501 Rev B 09/09/2019
BR-H5520 Rev B 09/09/2019
BR-H5530 Rev B 09/09/2019
BR-H5540 Rev B 09/09/2019
Mech 09/09/2019
19-000359 - BR-
M5000 - COVER SHEET & DRAWING LIST - Rev C 09/09/2019
This Tender has been prepared having regard to the addenda listed above.
(a) Has Third Party Registration been obtained for the Tenderer’s Corporate Quality System from a nationally
recognised registering body?
YES NO
N
If yes, provide copy of certificate and quote the licence number and body:
A copy of the manual is not required to be submitted with this Schedule.
If No, a Quality Manual prepared in accordance with the Australian Standard for Quality Systems
specified in Clause 160.A1 of the Specification shall be attached to, and form part of, this Schedule.
Please see attached Doc 1. IMS Index. AWS Services have created our integrated management system
in compliance to AS/NZS 4801:2001, AS/NZS ISO 14001:2016, AS/NZS ISO 9001:2016. AWS are in the
process of receiving their accreditation whilst preparing for Stage 2 of the accreditation process.
(b) Are you a Commercially Registered Building Practitioner as nominated in the Building Code of Australia ?
YES NO
Y
(c) Has the Tenderers Corporate Quality Manual for Tendering at the level of quality system specified for this
Contract been approved for previous Works carried out for GLEN EIRA CITY COUNCIL?
YES NO
Y
1.
1.
1.
1.
If no, a Quality Manual prepared in accordance with the Australian Standard for Quality Systems
specified in Clause 160.A1 of the Specification shall be attached to and form part of this Schedule.
(d) In addition the Quality System descriptions for activities listed below may be requested during the Tender
consideration period:
A preliminary Construction Program shall be submitted with the Tender based on an arbitrary commencement date of
21/10/2019 that can be modified in future to a specific date at the date of letter of acceptance. Amendments may be
made prior to commencement subject to the approval of the Superintendent.
The Construction Program shall include sufficient detail and be in a form necessary to show the following:
(c) Dates for provision of approvals, delivery of materials to the site, and removal of plant and equipment to and
from site; and
(d) Milestones which identify significant events including completion of separable parts.
2. Estimated time to complete inclusive of adverse weather days allocated in Clause 100.E2 of the specification.
(Tenderers should note the date for Practical Completion specified in the General Conditions of Contract
AS2124 Annexure together with applicable Bonuses and Liquidated Damages).
The Final Construction Program will be included in the Contract, supplied and fully detailed including “critical
path” in accordance with the provisions of Clause 100.E1 of the Specification.
The Construction Program shall be attached to and form part of this Schedule.
The Tenderer is to advise the nature and extent of work proposed to be sub-contracted. The names of proposed sub-
contractors and the type of work to be undertaken are to be listed in the table below:
If the Tender is subsequently accepted by GLEN EIRA CITY COUNCIL, such acceptance will not constitute
approval by the Superintendent pursuant to sub-clause 9.2 of the General Conditions of Contract.
9. Other
NOTE:
2. The Project Engineer is to be an experienced and qualified person able to take general control of the project and
visit the site regularly.
3. The Quality Management Representative is to have responsibility for quality system requirement.
4. The Permanent Site Supervisor / Foreman is to be competent to direct the whole of the workforce on site and shall
be allocated wholly to the project and shall normally be resident on site throughout working hours.
5. The Surveyor is to be experienced and able to take control of all project surveying requirements.
Drainage Pipes
Building Bricks
Building Doors
Building Handrails
NOTE: The above table should contain the following information where relevant:
CURRENT WORKS:
Name: Phillip Sunshine Leisure Centre Indoor Pool $865,000.00 2019
and Change Room Renovation /
Co.: Brimbank City Council Sunshine Leisure Centre Sunshine 03/09/2019 8 weeks
Tel.: 0392494301
PREVIOUS WORKS:
Name: Vindana Fernando Landscape, Renovation decking, 2019
ownings, irrigation system, concrete $120,237.84
Co.: Glen Eria City Council floor / 120 leila road Carnegie 4 Weeks
26/03/2019
Tel.: 0435652969
Co.: Glen Eira City Council Replacement of klip look roof sheeting
/ Mckinnon reserve pavilion $39,650.00 2018
Tel.:0435652969
21/12/2018 2 weeks
2. A list of Works of a similar nature to this project, performed by the Tenderer during the previous three (3) years.
I/We declare that my/our Tender is a bona fide Tender, intended to be competitive, and that I/we have not fixed or
adjusted the amount of the Tender by or under or in accordance with any agreement or arrangement with any other
person. I/We also declare that I/we have not done and I/we undertake that I/we will not do at any time before the hour
and date specified for the return of this Tender any of the following acts:
(a) Communicate to a person other than the person calling for those tenders the amount or approximate amount of
the proposed Tender, except where the disclosure, in confidence, of the approximate amount of the Tender was
necessary to obtain insurance premium quotations required for the preparation of the Tender.
(b) Enter into any agreement or arrangements with any other person that he/she/it shall refrain from tendering or as
to the amount of any tender to be submitted.
(c) Offer or pay or give or agree to pay any sum or valuable consideration directly or indirectly to any person for
doing or having done or causing to be done in relation to any other Tender or proposed Tender for the said work
any act or thing of the sort described above.
In this declaration, the word "person" includes any persons or any body or association, corporate or non-corporate,
and "any agreement or arrangement" includes such transaction, formal or informal, and whether legally binding or
not.
PROPOSED
ITEM OF PLANT DESCRIPTION AND CAPACITY
NO.
TENDERERS PLANT:
All Carpenter tools 4
Excavator 10 tonnes 1
Jackhammer 6
Hand jackhammer 5
Trucks 3
Semi tipper 1
The above table shall contain a list of the items of plant (number and type) which are available in good working order
and are proposed to be used on the work under the Contract.
Please place a √ (tick) in either box and attach additional comments or information as required.
1.1 Does the Tenderer have an Occupational Health and Safety (OH&S) Management
System prepared in accordance with the requirements of AS/NZS ISO4801?
Please see attached Doc 1. IMS Index. AWS Services have created our
integrated management system in compliance to AS/NZS 4801:2001, AS/NZS
ISO 14001:2016, AS/NZS ISO 9001:2016. AWS are in the process of
receiving their accreditation whilst preparing for Stage 2 of the accreditation
process.
1.3 If the answer to both of the questions above is NO, please provide details of the
Tenderers intended system for managing OH&S on this project.
The OH&S Management Questionnaire is required to be completed by Tenderers and submitted to GLEN EIRA CITY
COUNCIL at the same time as (and in consideration with) their Quotation or Tender. Additional information required
under Section B of the document for OH&S. Contractor Requirements contained in the specification should also be
attached and submitted.
The objective of the Questionnaire is to provide an overview of the Tenderers OH&S Management System and
performance record. The successful Tenderer will be required to verify their responses noted in this questionnaire
through their OH&S Policy and Site Safety Plan (refer to Schedule 25A & 25C).
Please place a √ (tick) in either box and attach additional comments or information as required.
3 OH&S TRAINING
3.1 Describe how health and safety training is conducted in your company.
Health and Safety training and awareness is maintained through the use of Toolbox
meetings, site specific inductions, external training and site inspections. The results
derived from these practices are then discussed in the weekly employee meetings held
every Friday as well as at Management Review meetings. Please see attached Doc 15.
Toolbox Meeting, Doc 16. Site Inspection, Doc 17. Induction Sign off, and Doc 18.
Training Record are attached.
3.2 Is a record maintained of all training and induction programs undertaken for Y
employees in your company? If YES, provide examples of safety training records.
All training and induction programs are recorded and maintained in both the
employee file and training registers. Please see attached Doc 18. Training Record
7 OH&S REFERENCES
7.1 Please provide the following information for three (3) most recent Contracts completed by the Tenderer:
Client Brimbank City Council Glen Eira City Council Westfield Airport West
Contact
0417343648 0435652969 0400452462
Phone No.
No. of person
23 14 All year
days on Contract
The information provided in this questionnaire is an accurate summary of the company’s Occupational Health and
Safety System.
Tenderers must provide evidence of their ability and capacity to comply with the requirements of the Occupational
Health and Safety Act (2004) and the Occupational Health and Safety Regulations 2007.
As a means of demonstrating compliance, the Tenderer is required to complete Schedule 25B and must provide a Site
Safety Plan.
NOTE: Prior to commencing work the successful Tenderer will be required to submit a Site Safety Plan specific
to the Contract and which as a minimum addresses those matters included in Section 111 of the Specification.
To assist in the preparing the Site Safety Plan, the Contractor is referred to the Work Safe document
“A Handbook for the Construction Regulations – Working safely in the general construction industry”.
The Site Safety Plan specific to this Contract shall be submitted within seven (7) days of a written request to do so.
Please place a √ (tick) in either box and attach additional comments or information as required.
1.3 If the answer to both of the questions above is NO, please provide details of the
Tenderers intended system for environmental management on this project.
The Tenderer is to detail sources of supply and signify estimated usage percentages for water supplied to the site for
construction purposes.
Potable*
SE Water Hydrant Access Permit No.: ……………………………………………
(Alternatively attach a copy of SE Water Authorisation to this Schedule)
Bore Water
Source: ………………………………………...........................................................
(please detail)
70 %
Recycled Water
Source: ………South East Water…………..….................................. Class: ...B...
(please detail)
Other
Source: ………………………………………….................................. Class: .........