Scs Non Parametric Method: Hidrograf Limpasan MAB Jembatan Sungai Ci Silad Sta. 51+879
Scs Non Parametric Method: Hidrograf Limpasan MAB Jembatan Sungai Ci Silad Sta. 51+879
Diketahui
Hidrograf Limpasan MAB Jembatan Sungai Ci Silad sta. 51+879
DAS = 23.4 km2 300.0
2340.0 hektar
L= 21260 m
So = 0.0060 m/m 10,000 m3 250.0
23,400,000 m2
a. Hitung Tp dan Tb 0.000 m
1 Dengan rumus kirpich 200.0
tc = 0.01947 * ( L^0.77 / S^0.385 ) (0.87 * L^2 / ( 1000 * S ))^0.385
299.56 menit 5.00 jam
Debit (,3/detik)
4.99 jam 150.0
2 Tp = 2/3*Tc
3.33 jam
Tb = 8/3*Tp 100.0
8.87 jam
b. HSS SCS
1 AHSS = 1/2*(qp*tb) 50.0
1.33
2 Hitung debit puncak HSS
Qp = 1/(3.6*Tp)*ADAS/AHSS 0.0
1.47 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
Waktu (Jam)
3 Absis dan Ordinat HSS (berdimensi)
4,256,138
Total Vol.
4,256,138
(m3)
Luas DAS
23.4
(km2)
DRO (mm) 181.89
DRO/ref 107.07%
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Ci Silad sta. 51+879
PARAMETER HSS GAMA PADA JEMBATAN SUNGAI CI SILAD STA. 51+879 Koordinat Hidograf Satuan GAMA I
Luas DAS (km2) 23.40 km2 Debit Banjir Rencana - Kala Ulang 100 Tahun
Panjang sungai utama (km) 21.26 km 300
Unit Hujan Efektif , Ro (mm) 1.00 mm
Parameter Hidrograf (α) 1.36
TIME LAG, tg 1.63 jam
Unit Hidrograf
2.00
2 0.50 0.14 -3.09 -1.39 -0.60 0.05 0.02 0.02
3 1.00 0.28 -2.59 -1.17 -0.45 0.17 0.09 0.09
4 1.50 0.42 -2.09 -0.94 -0.30 0.28 0.24 0.24
1.00
5 2.00 0.56 -1.59 -0.72 -0.15 0.39 0.48 0.48
6 2.50 0.70 -1.09 -0.49 0.01 0.50 0.83 0.83
7 3.00 0.84 -0.59 -0.27 0.16 0.62 1.28 1.28
8 3.50 0.97 -0.09 -0.04 0.31 0.73 1.85 1.85 0.00
9 4.00 1.11 0.41 0.18 0.46 0.84 1.58 1.58 0 2 4 6 8 10
10 4.50 1.25 0.91 0.41 0.61 0.95 1.21 1.21 Waktu t (jam)
Tabel Perhitungan Debit Banjir Rancangan Metode HSS Nakayasu Kala Ulang 100 Tahunan
α = 1.36
R50th = 169.94 mm
Refektif = 0.58 mm
3
Qbaseflow = 0.01 (m /dt)
3
Q max = 186.33 (m /dt)
Ordinat Hujan Jam-Jaman Debit
t HSS R0,1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 Base flow Banjir
(Qt) 74.23 19.29 13.53 10.77 9.10 7.95 7.11 6.46 5.52 5.52 5.52 Rancangan
3
(jam) (m /det/mm) (mm) (m3/det) (m3/det)
1/1 Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Ci Silad sta. 51+879 - Nakayasu/TAB)
Hydraulics Analysis
Data
Name of River : Ci Silad
Station : 51+800
Slope of River : 0.00120
n 0.055
Design flood return period 100 years : 186.33 m3/sec (R-100)
35.88
Y" 35.88 35.88 35.88 35.88 35.88 35.88 35.88 35.88 35.88 35.88 35.88 35.88 35.88
X 0 30.5 168.3 187.4 194 200.47 207.79 211.91 213.01 244.41 264.01 283.71 295.11 2500.62
Y 41.4 39 38 36.8 31.20 31.7 32.6 32.95 34.1 36.2 38.6 39.1 50.7 31.2
delta Y 0.00 0.00 0.00 0.00 4.68 4.18 3.28 2.93 1.78 0.00 0.00 0.00 0.00 1.30
Delta X 0 30.5 137.8 19.1 6.6 6.47 7.32 4.12 1.1 31.4 19.6 19.7 11.4 295.11
A 0.00 0.00 0.00 0.00 15.44 28.65 27.29 12.78 2.59 27.91 0.00 0.00 0.00 114.65
Oblique cross section of the river length 0.00 0.00 0.00 0.00 8.09 6.49 7.38 4.13 1.59 0.00 0.00 0.00 0.00 27.68
42.5
40 Elevation of Flood level
37.5 Series1
35
32.5
30
0 50 100 150 200 250 300
DISTANCE ( m )
Flood water level 35.88 Overtoping on the Dike NO FLOOD m Estiamte Structure Bridge Span : 15
Free Board 1.5 El Max Wall of River 39 Skew 0 m
Elevation of botom girder 37.38 = Super elevasi : 2
Structure Total High : 2.07
Estimate FG : 39.45
Data
Name of River : Ci Silad
Station : 51+879
Slope of River : 0.00120
n 0.043
Design flood return period 100 years : 186.33 m3/sec (R-100)
36.11
Y" 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11
X 0 10.1 14.7 21.17 28.49 35.61 37.11 38.61 39.61 39.61 39.61 39.71 344.33
Y 38 34.8 31.20 31.7 32.1 32.95 33.1 35 37 37 37 40 31.2
delta Y 0.00 1.31 4.91 4.41 4.01 3.16 3.01 1.11 0.00 0.00 0.00 0.00 Avg 1.83
Delta X 0 10.1 4.6 6.47 7.32 7.12 1.5 1.5 1 0 0 0.1 39.71
A 0.00 6.62 14.31 30.15 30.82 25.53 4.63 3.09 0.56 0.00 0.00 0.00 115.69
Oblique cross section of the river length 0.00 10.18 5.84 6.49 7.33 7.17 1.51 2.42 0.00 0.00 0.00 0.00 40.94
37
36
35 Elevation of Flood level
34
Series1
33
32
31
30
0 5 10 15 20 25 30 35 40 45
DISTANCE ( m )
Flood water level 36.12 Overtoping on the Dike NO FLOOD m Estiamte Structure Bridge Span : 25-40-25
Free Board 1.5 El Max Wall of River 34.8 Skew 43
Elevation of botom girder 37.62 = Super elevasi : 2
25 Structure Total High : 2.77
7.5 77.6 86.85 1.85 7.5 7.5 Estimate FG : 40.39
17.37
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Ci Silad sta. 51+879
SCS NON PARAMETRIC METHOD
Diketahui
Hidrograf Limpasan MAB Jembatan Sungai Ciemer sta. 59+900
DAS = 152.8 km2 800.0
15280.0 hektar
L= 25500 m 700.0
So = 0.00180 m/m 10,000 m3
152,800,000 m2
600.0
a. Hitung Tp dan Tb 0.000 m
1 Dengan rumus kirpich
tc = 0.01947 * ( L^0.77 / S^0.385 ) (0.87 * L^2 / ( 1000 * S ))^0.385 500.0
548.43 menit 9.15 jam
Debit (,3/detik)
9.14 jam 400.0
2 Tp = 2/3*Tc
6.09 jam 300.0
Tb = 8/3*Tp
16.25 jam
200.0
b. HSS SCS
1 AHSS = 1/2*(qp*tb)
1.33 100.0
2 Hitung debit puncak HSS
Qp = 1/(3.6*Tp)*ADAS/AHSS 0.0
5.22 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
Waktu (Jam)
3 Absis dan Ordinat HSS (berdimensi)
27,237,837
Luas DAS (km2) 152.80 km2 Debit Banjir Rencana - Kala Ulang 100 Tahun
Panjang sungai utama (km) 25.50 km 1000
Unit Hujan Efektif , Ro (mm) 1.00 mm
Parameter Hidrograf (α) 1.98 800
TIME LAG, tg 1.88 jam
Unit Hidrograf
2 1.00 0.24 -3.13 -0.84 -0.23 0.33 0.28 0.28 6.00
10 9.00 2.18 4.87 1.31 1.21 1.41 2.00 2.00 Waktu t (jam)
Tabel Perhitungan Debit Banjir Rancangan Metode HSS Nakayasu Kala Ulang 100 Tahunan
α = 1.98
R50th = 161.24 mm
Refektif = 0.58 mm
3
Qbaseflow = 0.01 (m /dt)
Q max = 843.42 (m3/dt)
Ordinat Hujan Jam-Jaman Debit
t HSS R0,1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 Base flow Banjir
(Qt) 88.73 23.06 16.18 12.88 10.88 9.51 8.50 7.73 6.60 6.60 6.60 Rancangan
3
(jam) (m /det/mm) (mm) (m3/det) (m3/det)
1/1 Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cilemer sta. 59+900 - Nakayasu/TAB)
Hydrology Analysis
Data
Name of River : Ci Lemer
Station : 59+900
Slope of River : 0.00065
n 0.03
Design flood return period 100 years : 658.33 m3/sec (R-100)
15.54
Y" 15.54 15.54 15.54 15.54 15.54 15.54 15.54 15.54 15.54 15.54 15.54 15.54
X 0 14.17 20.04 20.95 25.81 28.23 31.44 41 51.57 54.29 74.07 75.07 436.64
Y 13.9 13.2 11.62 9.2 7.39 8.78 8.49 7.22 8.92 14.33 14.14 14.14 7.22
delta Y 1.64 2.34 3.92 6.34 8.15 6.76 7.05 8.32 6.62 1.21 1.40 1.40 Avg 4.59
Delta X 0 14.17 5.87 0.91 4.86 2.42 3.21 9.56 10.57 2.72 19.78 1 75.07
A 0.00 28.16 18.36 4.67 35.20 18.03 22.16 73.44 78.93 10.64 25.76 1.40 316.75
Oblique cross section of the river length 1.64 14.19 6.08 2.59 5.19 2.79 3.22 9.64 10.71 6.06 19.78 1.00 82.88
15
13 Elevation of Flood level
11
Series1
9
7
5
0 10 20 30 40 50 60 70 80
DISTANCE ( m )
Flood water level 15.54 Overtoping on the Dike 1.64 m Estiamte Structure Bridge Span : 25-40-25
Free Board 1.5 El Max Wall of River 13.2 Skew 43
Elevation of botom girder 17.04 = Super elevasi : 2
25 Structure Total High : 2.77
7.5 77.6 86.85 1.85 7.5 7.5 Estimate FG : 19.81
17.37
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cilemer sta. 59+900
Hydrology Analysis
Data
Name of River : Ci Lemer
Station : 59+900
Slope of River : 0.00065
n 0.030
Design flood return period 100 years : 658.33 m3/sec (R-100)
15.23
Y" 15.23 15.23 15.23 15.23 15.23 15.23 15.23 15.23 15.23 15.23 15.23 15.23
X 0 4 30 34 34.2 34.4 34.6 34.8 35 35.2 35.4 35.6 347.20
Y 15.5 7.8 7.8 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 7.8
delta Y 0.00 7.43 7.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Avg 1.24
Delta X 0 4 26 4 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 35.6
A 0.00 14.86 193.19 14.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 222.91
Oblique cross section of the river length 0.00 8.44 26.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.44
15
13 Elevation of Flood level
11
Series1
9
7
5
0 5 10 15 20 25 30 35 40
DISTANCE ( m )
Flood water level 15.24 Overtoping on the Dike NO FLOOD m Estiamte Structure Bridge Span : 25-40-25
Free Board 1.5 El Max Wall of River 15.5 Skew 43
Elevation of botom girder 16.74 = Super elevasi : 2
25 Structure Total High : 2.77
7.5 77.6 86.85 1.85 7.5 7.5 Estimate FG : 19.51
17.37
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cilemer sta. 59+900
SCS NON PARAMETRIC METHOD
Diketahui
Debit (,3/detik)
2 Tp = 2/3*Tc
4.44 jam
Tb = 8/3*Tp 200.0
11.84 jam
b. HSS SCS 150.0
1 AHSS = 1/2*(qp*tb)
1.33
2 Hitung debit puncak HSS 100.0
Qp = 1/(3.6*Tp)*ADAS/AHSS
3.01 50.0
10,208,654
t / TR
Qt = Qp . e (Persamaan untuk lengkung naik) 250 38 37.00 0.013 45.291 0.008
Qt = Qp . e -t / k (Persamaan untuk lengkung resesi) 200 39 38.00 0.011 38.650 0.007
Aliran DPSar (QB): 40 39.00 0.009 32.983 0.006
150
QB = 0,4751. A0,6444 . D0,943 41 40.00 0.008 28.147 0.005
QB = 8.899 100 Volume Limpasan 99272.02 20.04
Indeks Ф 50 koreksi Kedalaman hujan 1.546
Ф = -10.4903 - 3.859 10-6 A2 + 1.6985 x 10-13 (A/SN)4
0
Ф = Indeks Filtrasi 0 4 8 12 16 20 24
Waktu (jam)
Ф= 10.474 mm/jam
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cimoyan sta. 64+500
TABEL PERHITUNGAN HIDROGRAF SATUAN SINTETIK NAKAYASU
DAS SUNGAI CIMOYAN STA. 64+500
Luas DAS (km2) 64.20 km2 Debit Banjir Rencana - Kala Ulang 100 Tahun
Panjang sungai utama (km) 21.60 km 400.00
Waktu t (jam)
TABEL ORDINAT HIDROGRAF SATUAN SINTETIK NAKAYASU
INTERVAL 1
Unit Hidrograf
2 2.00 0.55 -1.64 -0.57 -0.05 0.46 1.07 1.073 6.00
10 10.00 2.75 6.36 2.22 1.81 1.86 0.51 0.508 Waktu t (jam)
Tabel Perhitungan Debit Banjir Rancangan Metode HSS Nakayasu Kala Ulang 100 Tahunan
α = 1.74
R50th = 134.52 mm
Refektif = 0.59 mm
Qbaseflow = 0.01 (m3/dt)
Q max = 357.54 (m3/dt)
Ordinat Hujan Jam-Jaman Debit
t HSS R0,1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 Base flow Banjir
(Qt) 74.03 19.24 13.50 10.75 9.07 7.93 7.09 6.45 5.50 5.50 5.50 Rancangan
3
(jam) (m /det/mm) (mm) (m3/det) (m3/det)
1/1 Tol Serpan-33 - Perhitungan Sungai Cimoyan sta. 64+500 - HSS - Nakayasu/TAB)
Hydrology Analysis
Data
Name of River : Ci Moyan
Station : 64+521
Slope of River : 0.00150
n 0.03
Design flood return period 100 years : 357.07 m3/sec (R-100)
16.23
Y" 16.23 16.23 16.23 16.23 16.23 16.23 16.23 16.23 16.23 16.23 16.23
X 0 1.25 1.5 3 20.5 22 22.25 23.5 24 24.5 25 167.50
Y 16.3 13.1 13.1 11.05 11.05 13.25 13.25 16.45 16.45 16.45 16.45 11.05
delta Y 0.00 3.13 3.13 5.18 5.18 2.98 2.98 0.00 0.00 0.00 0.00 Avg 4.98
Delta X 0 1.25 0.25 1.5 17.5 1.5 0.25 1.25 0.5 0.5 0.5 25
A 0.00 1.96 0.78 6.23 90.63 6.12 0.74 1.86 0.00 0.00 0.00 108.33
Oblique cross section of the river length 0.00 3.37 0.25 2.54 17.50 2.66 0.25 0.00 0.00 0.00 0.00 26.57
17
16
15 Elevation of Flood level
14
River bed
13
12
11
10
0 5 10 15 20 25 30
DISTANCE ( m )
Flood water level 16.23 Overtoping on the Dike NO FLOOD m Estiamte Structure Bridge Span : 44
Free Board 1.5 El Max Wall of River 13.25 Skew 0 m
Elevation of botom girder 17.73 = Super elevasi : 2
Structure Total High : 2.07
Estimate FG : 19.80
Data
Name of River : Ci Moyan
Station : 64+521
Slope of River : 0.0015
n 0.03
Design flood return period 100 years : 357.07 m3/sec (R-100)
16.33
Y" 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33
X 0 7.97 21.44 26.23 31.81 34.29 41.15 45.42 47.89 49.28 66.38 371.86
Y 15.3 14.3 13.4 13.5 12.88 11.1 11.02 13.2 15.57 15.7 15.7 11.02
delta Y 1.03 2.03 2.93 2.83 3.45 5.23 5.31 3.13 0.76 0.63 0.63 Avg 2.54
Delta X 0 7.97 13.47 4.79 5.58 2.48 6.86 4.27 2.47 1.39 17.1 66.38
A 0.00 12.18 33.39 13.79 17.51 10.76 36.14 18.01 4.80 0.96 10.75 158.30
Oblique cross section of the river length 1.03 8.03 13.50 4.79 5.61 3.05 6.86 4.79 3.42 1.40 17.10 69.59
17
16
15 Elevation of Flood level
14
River bed
13
12
11
10
0 10 20 30 40 50 60 70
DISTANCE ( m )
Flood water level 16.33 Overtoping on the Dike 1.03 m Estiamte Structure Bridge Span : 15
Free Board 1.5 El Max Wall of River 14.3 Skew 0 m
Elevation of botom girder 17.83 = Super elevasi : 2
Structure Total High : 2.07
Estimate FG : 19.90
Diketahui
Hidrograf Limpasan MAB Jembatan Sungai Cisurianean sta. 72+916
DAS = 19.97 km2 140.0
1997.0 hektar
L= 14600 m
120.0
So = 0.0009 m/m 10,000 m3
19,970,000 m2
a. Hitung Tp dan Tb 0.001 m 100.0
1 Dengan rumus kirpich
tc = 0.01947 * ( L^0.77 / S^0.385 ) (0.87 * L^2 / ( 1000 * S ))^0.385
465.89 menit 7.77 jam 80.0
Debit (,3/detik)
7.76 jam
2 Tp = 2/3*Tc 60.0
5.17 jam
Tb = 8/3*Tp
13.80 jam 40.0
b. HSS SCS
1 AHSS = 1/2*(qp*tb)
20.0
1.33
2 Hitung debit puncak HSS
Qp = 1/(3.6*Tp)*A DAS/AHSS 0.0
0.80 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
Waktu (Jam)
3 Absis dan Ordinat HSS (berdimensi)
3,681,130
Total Vol.
3,681,130
(m3)
Luas DAS
19.97
(km2)
Tol(mm)
DRO Serpan-33 - Perhitungan
184.33 MAB Jembatan Sungai Cisurianean sta. 72+916
DRO/ref 97.57%
Hydrology Analysis
PARAMETER HSS GAMA PADA JEMBATAN SUNGAI CI SURIANEAN STA. 72+916 Koordinat Hidograf Satuan GAMA I
Luas DAS (km2) 19.97 km2 Debit Banjir Rencana - Kala Ulang 100 Tahun
Panjang sungai utama (km) 14.60 km 400
Unit Hujan Efektif , Ro (mm) 1.00 mm
Parameter Hidrograf (α) 1.42
TIME LAG, tg 1.37 jam 300
Unit Hidrograf
2.00
2 0.50 0.17 -2.52 -1.30 -0.53 0.10 0.03 0.03
3 1.00 0.33 -2.02 -1.04 -0.36 0.23 0.14 0.14
4 1.50 0.50 -1.52 -0.78 -0.19 0.36 0.36 0.36
1.00
5 2.00 0.66 -1.02 -0.52 -0.02 0.49 0.73 0.73
6 2.50 0.83 -0.52 -0.27 0.16 0.62 1.24 1.24
7 3.00 0.99 -0.02 -0.01 0.33 0.75 1.92 1.92
8 3.50 1.16 0.48 0.25 0.50 0.87 1.44 1.44 0.00
9 4.00 1.33 0.98 0.51 0.67 1.00 1.06 1.06 0 2 4 6 8 10
10 4.50 1.49 1.48 0.76 0.84 1.13 0.78 0.78 Waktu t (jam)
Tabel Perhitungan Debit Banjir Rancangan Metode HSS Nakayasu Kala Ulang 100 Tahunan
α = 1.42
R50th = 189.00 mm
Refektif = 0.60 mm
3
Qbaseflow = 0.01 (m /dt)
Q max = 202.08 (m3/dt)
Ordinat Hujan Jam-Jaman Debit
t HSS R0,1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 Base flow Banjir
(Qt) 82.55 21.46 15.05 11.98 10.12 8.85 7.91 7.19 6.14 6.14 6.14 Rancangan
3
(jam) (m /det/mm) (mm) (m3/det) (m3/det)
1/1 Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cisurianean sta. 72+916 - Nakayasu/TAB)
Hydraulics Analysis
Data
Name of River : Ci Surianean
Station : 72+916
Slope of River : 0.00110
n 0.030
Design flood return period 100 years : 146.77 m3/sec (R-100)
10.05
Y" 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05
X 0 9.5 10 10.35 10.57 10.75 15.55 16.17 16.87 19.67 26.5 27.5 173.43
Y 8.4 7.4 6.4 5.4 4.4 3.4 3.4 5.4 7.4 8.4 9.4 9.4 3.4
delta Y 1.65 2.65 3.65 4.65 5.65 6.65 6.65 4.65 2.65 1.65 0.65 0.65 Avg 3.48
Delta X 0 9.5 0.5 0.35 0.22 0.18 4.8 0.62 0.7 2.8 6.83 1 27.5
A 0.00 20.41 1.57 1.45 1.13 1.11 31.91 3.50 2.55 6.02 7.84 0.65 78.15
Oblique cross section of the river length 1.65 9.55 1.12 1.06 1.02 1.02 4.80 2.09 2.12 2.97 6.90 1.00 35.31
10
8 Elevation of Flood level
6
Series1
4
2
0
0 5 10 15 20 25 30
DISTANCE ( m )
Flood water level 10.05 Overtoping on the Dike 1.65 m Estiamte Structure Bridge Span : 25-40-25
Free Board 1.5 El Max Wall of River 7.4 Skew 43
Elevation of botom girder 11.55 = Super elevasi : 2
25 Structure Total High : 2.77
7.5 77.6 86.85 1.85 7.5 7.5 Estimate FG : 14.32
17.37
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cisurianean sta. 72+916
Hydraulics Analysis
Data
Name of River : Ci Surianean
Station : 72+916
Slope of River : 0.00110
n 0.030
Design flood return period 100 years : 146.77 m3/sec (R-100)
10.96
Y" 10.96 10.96 10.96 10.96 10.96 10.96 10.96 10.96 10.96 10.96 10.96 10.96
X 0 2.9 3.4 3.75 3.97 4.15 8.45 9.07 9.77 12.57 13.4 13.6 85.03
Y 8.4 7.4 6.4 5.4 4.4 3.4 3.4 5.4 7.4 8.4 9.4 9.4 3.4
delta Y 2.56 3.56 4.56 5.56 6.56 7.56 7.56 5.56 3.56 2.56 1.56 1.56 Avg 4.39
Delta X 0 2.9 0.5 0.35 0.22 0.18 4.3 0.62 0.7 2.8 0.83 0.2 13.6
A 0.00 8.87 2.03 1.77 1.33 1.27 32.51 4.07 3.19 8.57 1.71 0.31 65.64
Oblique cross section of the river length 2.56 3.07 1.12 1.06 1.02 1.02 4.30 2.09 2.12 2.97 1.30 0.20 22.83
14
12
10 Elevation of Flood level
8
Series1
6
4
2
0
0 2 4 6 8 10 12 14 16
DISTANCE ( m )
Flood water level 10.97 Overtoping on the Dike 2.56 m Estiamte Structure Bridge Span : 25-40-25
Free Board 1.5 El Max Wall of River 7.4 Skew 43
Elevation of botom girder 12.47 = Super elevasi : 2
25 Structure Total High : 2.77
7.5 77.6 86.85 1.85 7.5 7.5 Estimate FG : 15.24
17.37
Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Cisurianean sta. 72+916
Hydraulics Analysis
SCS NON PARAMETRIC METHOD
Diketahui
DAS = 540 km2 Hidrograf Limpasan MAB Jembatan Sungai Ci Liman sta. 77+350
54000.0 hektar 1600.0
L= 77400 m
So = 0.0017 m/m 10,000 m3
1400.0
540,000,000 m2
a. Hitung Tp dan Tb 0.000 m
1 Dengan rumus kirpich 1200.0
tc = 0.01947 * ( L^0.77 / S^0.385 ) (0.87 * L^2 / ( 1000 * S ))^0.385
1320.42 menit 22.03 jam
1000.0
22.01 jam
2 Tp = 2/3*Tc
Debit (,3/detik)
14.67 jam 800.0
Tb = 8/3*Tp
39.13 jam 600.0
b. HSS SCS
1 AHSS = 1/2*(qp*tb)
1.33 400.0
2 Hitung debit puncak HSS
Qp = 1/(3.6*Tp)*ADAS/AHSS 200.0
7.67
PARAMETER HSS GAMA PADA JEMBATAN SUNGAI CI LIMAN STA. 77+350 Koordinat Hidograf Satuan GAMA I
Luas DAS (km2) 540.00 km2 Debit Banjir Rencana - Kala Ulang 100 Tahun
Panjang sungai utama (km) 77.40 km 2000
Unit Hujan Efektif , Ro (mm) 1.00 mm
Parameter Hidrograf (α) 1.37
TIME LAG, tg 4.89 jam 1500
Unit Hidrograf
2 0.50 0.04 -11.55 -1.72 -0.81 -0.11 0.01 0.01 12.00
10 4.50 0.37 -7.55 -1.12 -0.42 0.19 1.36 1.36 Waktu t (jam)
Tabel Perhitungan Debit Banjir Rancangan Metode HSS Nakayasu Kala Ulang 100 Tahunan
α = 1.37
R50th = 169.94 mm
Refektif = 0.58 mm
Qbaseflow = 0.01 (m3/dt)
Q max = 1,722.87 (m3/dt)
Ordinat Hujan Jam-Jaman Debit
t HSS R0,1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 Base flow Banjir
(Qt) 74.23 19.29 13.53 10.77 9.10 7.95 7.11 6.46 5.52 5.52 5.52 Rancangan
(jam) (m3/det/mm (mm) (m3/det) (m3/det)
1/1 Tol Serpan-33 - Perhitungan MAB Jembatan Sungai Ci Liman sta. 77+350 - Nakayasu/TAB)
Hydraulics Analysis
4.28
Y" 4.28 4.28 4.28 4.28 4.28 4.28 4.28 4.28 4.28 4.28 4.28 4.28
X 0 21 23.28 24.01 31.3 37.59 47.38 60.42 78.72 80.17 89.66 108.07 601.60
Y 1.66 0.83 0.94 0 -2.23 -5.23 -5.23 0 1.13 1.13 1.87 2.2 -5.23
delta Y 2.62 3.45 3.34 4.28 6.51 9.51 9.51 4.28 3.15 3.15 2.41 2.08 Avg 4.52
Delta X 0 21 2.28 0.73 7.29 6.29 9.79 13.04 18.3 1.45 9.49 18.41 108.07
A 0.00 63.70 7.74 2.78 39.32 50.37 93.09 89.89 67.95 4.56 26.37 41.30 487.06
Oblique cross section of the river length 2.62 21.02 2.28 1.19 7.62 6.97 9.79 14.05 18.33 1.45 9.52 18.41 113.26
4
2
0 Elevation of Flood level
-2
-4 Series1
-6
-8
-10
0 20 40 60 80 100 120
DISTANCE ( m )
Flood water level 4.28 Overtoping on the Dike 2.08 m Estiamte Structure Bridge Span : 50
Free Board 1.5 El Max Wall of River 0.94 Skew 0 m
Elevation of botom girder 5.78 = Super elevasi : 2
Structure Total High : 2.77
Estimate FG : 8.55
3.88
Y" 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88
X 0 226.05 227.47 227.7 229.98 230.71 233 249.54 267.84 269.29 278.78 502.19 2942.55
Y 2.46 0 -0.17 0.83 0.94 0 -2.23 -2.37 -2.39 1.13 1.87 2.61 -2.39
delta Y 1.42 3.88 4.05 3.05 2.94 3.88 6.11 6.25 6.27 2.75 2.01 1.27 Avg 3.66
Delta X 0 226.05 1.42 0.23 2.28 0.73 2.29 16.54 18.3 1.45 9.49 223.41 502.19
A 0.00 598.91 5.63 0.82 6.83 2.49 11.44 102.21 114.55 6.54 22.58 366.28 1238.27
Oblique cross section of the river length 1.42 226.06 1.43 1.03 2.28 1.19 3.20 16.54 18.30 3.81 9.52 223.41 508.19
5
3 Elevation of Flood level
1
Series1
-1
-3
-5
0 100 200 300 400 500 600
DISTANCE ( m )
Flood water level 3.88 Overtoping on the Dike 1.42 m Estiamte Structure Bridge Span : 40
Free Board 1.5 El Max Wall of River 0.94 Skew 0 m
Elevation of botom girder 5.38 = Super elevasi : 2
Structure Total High : 2.77
Estimate FG : 8.15
4.13
Y" 4.13 4.13 4.13 4.13 4.13 4.13 4.13 4.13 4.13 4.13 4.13 4.13
X 0 276.23 278.51 279.24 285.53 298.26 310.55 317.09 325.39 328.84 338.33 609.74 3647.71
Y 2.55 0 0.94 0 -2.23 -4.7 -5.2 -4 -2.39 1.13 1.87 2.71 -5.2
delta Y 1.58 4.13 3.19 4.13 6.36 8.83 9.33 8.13 6.52 3.00 2.26 1.42 Avg 4.91
Delta X 0 276.23 2.28 0.73 6.29 12.73 12.29 6.54 8.3 3.45 9.49 271.41 609.74
A 0.00 788.95 8.35 2.67 33.00 96.70 111.61 57.10 60.81 16.43 24.97 499.70 1700.28
Oblique cross section of the river length 1.58 276.24 2.47 1.19 6.67 12.97 12.30 6.65 8.45 4.93 9.52 271.41 614.38
4
2
0 Elevation of Flood level
-2
-4 Series1
-6
-8 0 100 200 300 400 500 600 700
-10
DISTANCE ( m )
Flood water level 4.14 Overtoping on the Dike 1.58 m Estiamte Structure Bridge Span : 50
Free Board 1.5 El Max Wall of River 0.94 Skew 0 m
Elevation of botom girder 5.64 = Super elevasi : 2
Structure Total High : 2.77
Estimate FG : 8.41