The document is a log sheet listing 9 pending requests for information (RFIs) related to a construction project. It includes the RFI number, subject, initiation date, and current status of each RFI. The RFIs request additional drawings and details for elements like building elevations, gates, walls, and stormwater drainage. Most of the RFIs are still awaiting a response or revised drawings according to the log.
The document is a log sheet listing 9 pending requests for information (RFIs) related to a construction project. It includes the RFI number, subject, initiation date, and current status of each RFI. The RFIs request additional drawings and details for elements like building elevations, gates, walls, and stormwater drainage. Most of the RFIs are still awaiting a response or revised drawings according to the log.
The document is a log sheet listing 9 pending requests for information (RFIs) related to a construction project. It includes the RFI number, subject, initiation date, and current status of each RFI. The RFIs request additional drawings and details for elements like building elevations, gates, walls, and stormwater drainage. Most of the RFIs are still awaiting a response or revised drawings according to the log.
The document is a log sheet listing 9 pending requests for information (RFIs) related to a construction project. It includes the RFI number, subject, initiation date, and current status of each RFI. The RFIs request additional drawings and details for elements like building elevations, gates, walls, and stormwater drainage. Most of the RFIs are still awaiting a response or revised drawings according to the log.
3 52 Door & Window schedule required for Phase # 1 3-Jul-19
4 53 Details for Low-Height wall required (Dry Wall) 3-Jul-19
Electrical & IT rooms at Fifth floor building-2 ST.L 64’-
5 56 19-Jul-19 3” Detail Drawing Required Drawing # A5-003 West Elevation at Grid 14~15 ST.L 6 58 +64'-3"~ +78'-3" a wall shown behind top arches 21-Aug-19 please provide its detail.
Reference Architectural drawing East elevation (DWG
No. A5-001) and West elevation (DWG No. A5-003) 7 59 Shown Groin Vaults at Level +64’-3” to +89’-0” at Grid 21-Aug-19 10~11 and 13~14 Please provide its complete detail drawings.
North, South& West Side of Boundary Wall
8 61 16-Sep-19 Construction drawing Required. East Side Storm Water Drain revised Construction 9 62 16-Sep-19 drawing required. Is LOG SHEET Status
Awaited
IFC drawings recived however work has not commencent due to
MEP desgine awaited from Arcop
Awaited
Awaited
Awaited
Deaile Awaited (Arcop has requested to hold this work)