Professional Documents
Culture Documents
Comments
Comments
The roof was redone to the main home in 2014 and to the pole barn in January of 2019.
The wood siding around the garage doors was removed and then replaced with concrete boards in 2014
Vinyl windows were installed to most of the home over 5 years ago.
The two bathrooms were remodeled in 2013 and 2014. Rebath is the contractor and their guarantee is
passed on to the next owner.
Pergo laminate has been installed in the master bedroom and the hallway.
In 2016 the crawl space was incapsulated and an oversized dehumidifier was installed. Orkin did their
annual inspection in October of 2019. The report was excellent and is available to the buyer.
Wind and hail insurance has been discounted and is approximately $1,300.00 per year.