DATE: 16/10/2019: Preventive Maintance of HQT
DATE: 16/10/2019: Preventive Maintance of HQT
DATE: 16/10/2019
2. H/F and T/F doors up and down not properly, due to check hydraulic flow control
valve (Very important)
6. Quenching tank cylinder forward, reverse trigger working is slowly due to cylinder
not forwarding to T/F.
11. 6.8Ltrs Unloading elevator, conveyer bed fabrication & welding work to be done.
By
HQT team