ITP NUMBER:
AYC INSPECTION CHECKLIST DATE
APPROVED:
ITP-AYC- ROAD/TSI/02452/01
TRAFIC SIGNAGE MATERIAL RECEIVING INSPECTION
Rev.00
CHECKLIST : CONTRACTOR :
PROJECT TITLE
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER: REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
CONTRACTOR TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
No. Acceptance Criteria REFERENCE PASS FAIL N/A RE-INSP DATE
A MATERIALS
Sheet steel fo sign panels shall conform to ASTM A 366, CLASS 1 and be Project Specs. 02452
A1
not less than 1.58 mm thick, unless otherwise shown on the drawings. Section 2.02 Para. A
Sheet Aluminum for sign panels shall conform to ASTM B 109, Alloy 6061- Project Specs. 02452
A2
T6 and not less than 3.0mm thick, unless otherwise shown on the drawings Section 2.02 Para. B
Steel pipe posts shall be hot dipped galvanized conforming to Schedule 40,
ASTM A 53 for signs greater than 1200 mm X 1200 mm. Project Specs. 02452
A3
Post sizes shall be as shown on the contract drawing, subject to Section 2.02 Para. C
an absolute minimum O.D. 75 mm ASTM 53 and 75.4 mm (BS 1387)
B FASTENERS
All high strength and regular strength bolts, nuts and washers for steel sign
support assemblies shall conform to ASTM A 325 or A 307, respectively, Project Specs. 02452
B1
and hot-dip galvanized to ASTM A 153. Minimum weight of zinc shall be not Section 2.02 Para. F-1
less that 0.55 kg/m2.
All bolts, nuts, and flat washers for sheet sign panels shall be Type 304
Project Specs. 02452
B2 passivated stainless. Type 1A, conforming to ASTM A 320 or 2024-T$ clear
Section 2.02 Para. F-2
anodized aluminum conforming to ASTM B211.
Aluminum lock washers 7075-T6 aluminum alloy. Nuts are to be of the self- Project Specs. 02452
B4
locking type Section 2.02 Para. F-3
Neoprene Spacers: ASTM C 864, with Shore Hardness of 40. Minimum Project Specs. 02452
B5
thickness 44 mm. Section 2.02 Para. F-3
ITP-AYC- ROAD/TSI/02452/01
TRAFIC SIGNAGE MATERIAL RECEIVING INSPECTION
Rev.00
CHECKLIST : CONTRACTOR :
PROJECT TITLE
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER: REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
CONTRACTOR TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
Relfelx reflectors for use in porcelain enamel signs shall be made of methyl
Project Specs. 02452
B2 methacrylate plastic molded into shape which will reflect incident light in a
Section 2.02 Para. H
narrow pattern back towards the source of the light.
REMARKS:
ITP-AYC- ROAD/TSI/02452
Installation and Final Inspection of Traffic Signage Rev.00
PROJECT TITLE CHECKLIST : CONTRACTOR :
LAYOUT DRAWING NUMBER: REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
CONTRACTOR TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITP-AYC- ROAD/TSI/02452 Rev.00 3.2
SAUDI ARAMCO INSPECTION L CONTRACTOR INSPECTION LEVEL
W I
ITEM
No. Acceptance Criteria REFERENCE PASS FAIL N/A RE-INSP DATE
The substrate and the conditions under which the traffic and
directional signs are to be installed and correct any
Project Specs. 02452
A.1 unsatisfactory conditions. Do not procedd with the work untl
Section 3.01 Para. A
unsatisfactory conditions have been corrected oc comply with
the requirements.
Sign Posts shall be plumb and shall not vary from a true plumb line
Project Specs. 02452
A.5 more than 5.0 mm. Post shall be securely anchored and laterally
Section 3.02 Para. C
stayed while the concrete hardens.
Sign panels shall be securely attached to the posts such that there is Project Specs. 02452
A.6
no wobble, sway, or looseness within the assembly. Section 3.02 Para. D1
Panels shall be accurately sloped where shown, or plumbed Project Specs. 02452
A.7
elswhere and all panels set with top and bottom edges level. Section 3.02 Para. D1
Mount the sign panels with slider brackets, in accordance with Project Specs. 02452
A.8
approved shop drawings. Section 3.02 Para. D2
REMARKS:
REFERENCE DOCUMENTS:
ITP-AYC- ROAD/TSI/02452
Installation and Final Inspection of Traffic Signage Rev.00
PROJECT TITLE CHECKLIST : CONTRACTOR :
LAYOUT DRAWING NUMBER: REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
CONTRACTOR TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITP-AYC- ROAD/TSI/02452 Rev.00 3.2
SAUDI ARAMCO INSPECTION L CONTRACTOR INSPECTION LEVEL
W I
QC Record
Performed Inspection Work / Rework May Proceed T&I Witnessed Work Verified
Reviewed
Name, Initials and Date: Name, Initials and Date:
*Person Responsible for Completion of Quality Work / Test ABBR- Y = YES N = NO F = FAILED PS-PROJECT SPECS. R-EWP=Rammed-Earth Wall Panel
ITP No.: ITP-AYC- ROAD/TSI/02452
INSPECTION AND TEST PLAN
Revision No.: 01
1 DOCUMENT REVIEW
2 MATERIALS RECEIVING
3 INSTALLATION / EXECUTION
1 The first three incidents of each Inspection or testing activity listed 100% participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon t
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
3 Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S S. ARAMCO - Witness first two activities and once every 5 occurrences thereafter. I 100% Contractor Inspection/Test
ON AND TEST PLAN
Supplier's Name:
Remarks / Record
JAPID (e.g.. Test Frequency, reports, Certificates, check’’. mlists,
etc)
W SATIP-A-114-01 Rev.06
H SATIP-Q-001-02 Rev.06
H SATIP-Q-001-02 Rev.06
W SATIP-Q-001-02 Rev.06
GENERAL NOTES
od, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor's performance.