Professional Documents
Culture Documents
To Executive Engineer
To Executive Engineer
Executive Engineer
Subject: Consultancy services for feasibility Study and Preparation of Detailed Project Report and
providing Pre-Construction of Preparation of DPR for the Construction of Cable Suspension Bridge
across Punpun River Located at Eastern side of Railway Bridge in the District of Patna.
Dear Sir,
As advised by the BRPNNL, we have re-reviewed the drawings and accordingly we are sending
you the below mentioned drawing.
Thanking You,
Yours faithfully
For VKS infratech Management Pvt Ltd
Project Coordinator