MASKANI/ AFFORDABLE HOUSING- LESHAN OLE SAIKA

2017 WORK PROGRESS


ITEM CLIENT'S NAME PROJECT TYPE LOCATION STATUS COMPLETION TIME
1 Steven Mutuku M.S Ruiru Complete N/A
2 Martin Mugi M.S Mavoko Complete N/A
3 Alice ombasa M.S Katani Complete N/A
4 Risper Ondigo B.W Katani Complete N/A
5 Robert Maoga M.S complete N/A
6 Walter Machete M.S Kitengela Complete N/A
7 Risper Ondigo Revised B.W Katani Complete N/A
8 Nahashon Mwaura M.S Juja Complete N/A
9 Jackson Molo Flat Complete N/A
10 Julius Ogutu (MSA) M.S Kiembeni Complete N/A
11 Edwin Were (MSA) B.W Kiembeni Complete N/A
12 Daniel Maingi Flat Kiambwa Complete N/A
13 Simon Mwengwa M.S Joska Complete N/A
14 Collins Mburu B.W Utawala Halted N/A
15 Steve Otieno B.W Ruai Complete N/A
16 Simon Kamau M.S Utawala Complete N/A
17 Josphat Kitolo B.S Mavoko Complete N/A

2017 WORK PROGRESS


ITEM CLIENT'S NAME MASKANI REP PROJECT TYPE LOCATION STATUS/ON-GOING COMPLETION TIME
1 Albert Gitau David O M.S Kamakis Complete N/A
2 David Otieno M.S Syokimau Laying of reinforcement 21/01/17
3 Gabriel Kamau David M M.S Membley Complete N/A
4 Gerald Muchiri Collins Vikwese M.S Syokimau Stalled N/A
5 Harun Muchemi David O M.S Juja Complete N/A

6 Henry Gisa Collins Vikwese M.S Syokimau Halted N/A


7 James Mutuku Collins Vikwese M.S Syokimau Complete N/A
8 John Gitau David O M.S Ruiru Casted ring beam 11/1/2017
9 John Gitau David O M.S Ruiru Foundation walling 4/3/2017
10 Jonathan Kioko Collins Vikwese M.S Syokimau Complete N/A
11 Kennedy Mwaura David O M.S Juja Complete N/A
12 Mike Otieno Collins Vikwese M.S Syokimau Complete N/A
13 Otieno Onjwayo Collins Vikwese M.S Syokimau Laying of reinforcement 28/01/17
14 Raphael Sebastian M.S Muranga Internal partitioning 1/2/2017
15 Raphael Sebastian M.S Muranga Fixing of trusses 20/02/17
16 Raphael Sebastian M.S Muranga Finishes T.B.D
17 Richard Kamuyu Collins Vikwese M.S Syokimau Complete N/A
18 Samuel Wende Collins Vikwese M.S Syokimau Curing 3/2/2017
19 Josephine Adhiambo Kevin Awiti M.S Chokaa Laying of reinforcement
20 Alice Ombasa Kevin Awiti M.S Katani Ground floor walling TBC
21 Risper Ondigo Kevin Awiti M.S Katani Design stage Complete
22 Aerial Mutegi David O Flat Ruiru Complete Complete
23 Timothy Waiharo David M Flat Wangige Reinforcement 1st floor 16/6/17
24 Imara Kevin Awiti Flat Pipeline Walling 21/07/2017
25 Edward Nyaboga Collins Vikwese M.S Syokimau Septic reinforcement 12/2/2017
26 Clement Ngeci David O M.S Juja Walling 13/01/17
27 Isaac Kimanthi David O M.S Juja Reinforcement 12/1/2017
28 Guyo Mohammed David O M.S Juja Walling 13/01/17
29 Martin Mathai David O M.S Juja Complete N/A
30 Stanley Mwangangi David M Flat Ruaka Reinforcement 24/02/17
31 Erastus Mbugua David M M.S Ndenderu Walling 27/02/17
32 James Makuba Collins Vikwese M.S Kahawa S Complete N/A
33 Fred Kachilia Collins Vikwese M.S Kahawa S Internal plastering 22/09/17
34 Martin Mugi collins Vikwese M.S Utawala Ground floor casting 29/04/17
35 Martin Waweru David O M.S Ruiru Walling 22/05/17
36 Wilberforce Juma Kevin Awiti M.S Ruai Reinforcement 8/5/2017
37 Patrick Siyenge David O Flat Thindigua Stalled N/A
38 Joseph Kinuthia Collins Vikwese M.S Kahawa W Fixing of roof trusses 19/05/17
39 Kwendo Benson Collins Vikwese Flat Kimbo Stalled N/A
40 Mr Mwaki Kevin Awiti M.S Muranga Casting 1st floor 2/6/2017
41 Bernard Njua Lewis W Flat 1 Thika Finishes T.B.C
42 Zachariah Kimani Lewis W Flat Thika Formwork to 1st floor 9/7/2017
43 Simon Kambo David M B.W Wangige Trench Excavation Complete
44 Njoroge Ruku David M Flat Wangige Plastering 15/06/17
45 John Kariuki David M Flat Wangige Column reinforcement 24/06/17
46 Edwin Ngugi Eunice Flat Kamakis Casting of ring beams 15/09/17
47 George Gitau Eunice Flat Ruiru Reinforcement 20/09/17
48 Joyce Nyamiobo David M Flat Ngong First floor reinforcement 16/11/2017
49 Peter Mugambi Collins Vikwese B.W Githurai Complete N/A
50 Bernard Njua Lewis W Flat 2 Thika Column footings 11/7/2017
51 David Kingori Lewis W Flat Thika 1st floor walling 9/7/2017
52 Shadrack Muchemi David O M.S Ruiru Internal and external plastering 27/09/17
53 Sammy Karanja Kevin Awiti Flat Pipeline 1st floor Reinforcement 11/7/2017
54 Joel Kalya Kevin Awiti Flat Pipeline 1st floor Reinforcement 6/7/2017
55 Sila Kiume Collins Vikwese Flat Machakos 4th floor beams 24/11/2017
56 Justus Musyoki Collins Vikwese M.S Syokimau Roof trusses 13/07/17
57 Gladies Nakhungu Kevin Awiti M.S Utawala ground floor walling 13/07/17
58 Jane Onsogo Kevin Awiti M.S Kamulu Foundation walling 10/7/2017
Evans Nyagei Maima D Flat Utawala Column footings 17/11/17
STRUCTURAL DRAWINGS
NEXT STEP
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Stamping
Stamping
Construction
Construction
Construction
Construction
N/A
Construction
Construction
Construction

TECHNICAL VISITS
NEXT STEP VISIT 1 VISIT2 VISIT 3 VISIT 4 VISIT 5
N/A 27/01/17
Casting 13/01/17
N/A 27/01/17
Laying of roof 13/01/17 5/7/2017
N/A 27/01/17

Client communication 13/01/17


N/A 26/01/17
Walling 3/1/2017 27/01/17
Casting G.F slab 28/03/17
N/A 26/01/17
N/A 27/01/17
N/A 13/01/17
Casting 26/01/17
Tying of ring beams 25/01/17 16/02/17 22/02/17
Laying of roofing tiles N/A 16/02/17 N/A
N/A N/A N/A 22/02/17 12/5/17
N/A 26/01/17
Walling 13/01/17
Casting 5/1/2017
Upper floor 30/01/17 16/06/17 22/06/17 16/11/17
Construction 8/2/2017
N/A 3/1/2017 14/03/17
Casting F.F slab 20/03/17 31/03/17 16/06/17
Reinforcement 28/02/17 29/03/17 29/04/17 31/05/17 4/7/2017
Casting 5/1/2017
Reinforcement 6/1/2017
Casting 6/1/2017
Reinforcement 6/1/2017
N/A 6/1/2017
Casting 17/02/17
Reinforcement 17/02/17
N/A 6/4/2017 30/06/17
External plaster 6/4/2017 12/5/17 23/06/17 5/9/2017
Walling and columns 15/4/17 28/04/17
Ring beam 22/04/17
Casting 8/5/2017
N/A `10-05-17 7/9/2017
Roof laying 11/5/17'
N/A 11/5/17' 30/06/17 5/9/2017
Walling 2/6/2017
Finishes 3/6/2017
Reinforcement 1/7/2017
Strip footing 8/6/2017
Reinforcement 8/6/2017 16/6/2017
Casting 16/6/17
Roofing 17/6/17 29/06/17 15/06/17 9/11/2017
casting to 1st floor 17/6/17 29/06/17 15/06/17 9/11/2017
casting ground floor 28/06/17 3/7/2017 10/11/2017 15/11/17
N/A 30/06/17 6/9/2017
Ground floor casting 1/7/2017
Formwork 1/7/2017
Finishes 3/7/2017 6/9/2017
Casting 4/7/2017
Casting 4/7/2017 6/7/2017
Casting 5/7/2017 14/11/17
Roofing 5/7/2017
Formwork 6/7/2017
casting ground floor 6/7/2017
Casting of the columns 16/11/17