Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 16

Picture of Well Test to find oil rate in steady-state

Data for well testing to find the value of qo when steady state with BHP Constraint 10000 kPa. q
steady 774.247 m3/day, test has been done for 2 days.
Picture of IPR Well-1

With using Vogel equation to determine the qo, max to make an IPR above also so we can make an
IPR with BPH Constraint and also qo steady state. Oil rate constraint for the well-1 is 20 m3/day.

Picture of
Then we can see the result for oil rate constraint and Cumulative Oil Production are 146100 m3 and
the total recovery factor is 6% so because of this we consider to drill another well to increase the oil
production.

Adding another well test data with the same procedure with well-1 and also make an IPR mode for the
well, so that we can determine the oil rate for next constraint. Qo value that we get from steady state is
22.910 m3/day.
Adding a gas well with constraint on gas rate to each well which are 750 m3/day (Well-3) and 650 m3/day
(Well-4).
IPR for Well-2 has been plot by using the Vogel equation to see the performance of Well-2 with BHP
Constraint 15000 kPa.

After well placement we can see the Cumulative Oil Production on the field production is increasing to
219083 m3 and Cumulative Gas Production is 2.23 x 108 and the total RF for each oil and gas are :
𝑁𝑝
𝑅𝐹𝑜𝑖𝑙 = 𝑁
𝑥 100%

218720 𝑚3
𝑅𝐹𝑜𝑖𝑙 = 𝑥 100 % = 10.22 %
2140000𝑚3
𝐺𝑝
𝑅𝐹𝑔𝑎𝑠 = 𝑥 100%
𝐺

2.310 𝑥 108
𝑅𝐹𝑔𝑎𝑠 = 𝑥 100% = 49.57 %
0.466 𝑥 109

So from the result of the RF (Recovery Factor) we would like to try to increase the production by using
Injection Well with fluid injection is water.

Picture of Cumulative Production of Oil (Well 1 & 2) and Gas


Picture of Np and Gp after Water Injection

Judging from the result above there is no significant changes in oil and gas inclining of production so we
believe that water injection and also adding another well isn’t needed.

Conclusion

The comparison between injected field and un-injected field are didn’t have so much difference, so we
believe adding another well to produce also have the same result and to make a minimum cost of making
a well we believe that the plan above is our best option.
Reservoir property
Deskripsi Nilai Satuan
Tekanan Reservoir 16820.33 / 2439 kPa / Psi
Kedalaman Reservoir 914.7 / 3000 M / Ft
Kedalaman WOC 975 / 3198 M / Ft
Kedalama GOC 914.7 / 3000 M / Ft
Tekanan Gelembung 16966.3 kpa
(PB)
Porositas 0,05-0,17 Fraksi
Permeabilitas 1-505 mD
Densitas Minyak 44.8483 Lb/ft3
Densitas Air 1020 kg/m3
Densitas Gas 0.870 Lb/ft3
Original Oil Inplace 2141600 STB
Permeability
Porosity
Oil saturation
Grid top

SKENARIO PRODUKSI
1. Setiap penambahan satu sumur pada sumur minyak dengan constraint STO
pada sumur 1 =35 m3/day
Pada sumur 2 =25 m3/day
Pada sumur 3 Gas= 750 m3/day
Pada sumur 4 Gas= 650 m3/day
2. Pembuatan IPR (Vogel Equation) untuk mengetahui Laju Produksi Maksimum di setiap
sumur
2
qo  Pwf   Pwf 
 1.0  0.2   0.8 
Qmax  Pr   Pr 
3. Running simulasi dengan yang FIX menggunakan 5 sumur produksi (2 oil dan 2 Gas & 1
Injeksi ) untuk menyesuaikan kontrak 30 tahun.
LAPORAN SIMULASI RESERVOIR

DIFFERENCE IN PERFORMANCE BETWEEN INJECTED AND UN-


INJECTED FIELD WITH WATER

Kelompok 11

1. Achmad Fauzi 1501361


2. Bagus Setiawan 1501019
3. Christoffel Saint M 1501463
4. Drian Nama Tri Wahyu 1501045
5. Fadli Fadl Rizky 1301359
6. Hazrah 1501261
7. Hendro Saputro 1501178
8. Sukardi 1501109

PROGRAM STUDI S1 TEKNIK PERMINYAKAN


SEKOLAH TINGGI TEKNOLOGI MINYAK DAN GAS BUMI
BALIKPAPAN
2018
KATA PENGANTAR

Alhamdulillah puji syukur kami ucapkan kehadirat Allah SWT yang telah memberikan
berkat, rahmat dan hidayah-Nya kepada kami sehingga dapat menyelesaikan Laporan ini.

Laporan ini merupakan salah satu tugas mata kuliah Simulasi Reservoir di program studi
Teknik Perminyakan beserta konsentrasinya pada Sekolah Tinggi Teknologi Minyak dan Gas
Bumi Balikpapan.

Lapora ini sudah kami susun dengan maksimal dan mendapat bantuan dari berbagai pihak
sehingga bisa memperlamcar pembuatan laporan ini. Untuk itu kami menyampaikan terimakasih
kepada semua pihak yang telah berkontribusi dalam pembuatan laporan ini.

Terlepas dari segala hal tersebut, kami sadara sepenuhnnya bahwa masih ada kekurangan
baik dari segi susunan kalimat maupun tata bahasanya. Untuk itu kami sangat mengharapkan kritik
dan saran yang membangun dari pembaca demi kesempurnaan laporan ini.

You might also like