Professional Documents
Culture Documents
Contoh Format Laporan Harian Kontraktor
Contoh Format Laporan Harian Kontraktor
RDMP RU V – BALIKPAPAN
RDMP BALIKPAPAN JO
DAILY HSE REPORT
Report No. NA
S - TOTAL LTI FREE ACCIDENT/INCIDENT STATUS
DATE 11-Oct-19
WEATHER Clear 30' C HUMIDITY 65% FATALITY 0
START DATE 17-Jul-19
► TODAY HSE ACTIVITIES (SUMMARY) LWDC 0
- HEALTH 1ST OF GOAL RWDC 0
0
Always take care of your health and sleep enough MAN-HOUR MTC 0
Drink 2 liters of fresh water per day OCCUPATIONAL ILLNESS 0
PREVIOUS 0
sprayer the mosquito on surrounding the portacamp, check a mosquito larvae on toilet and TOTAL LOST WORKDAYS 0
drainage, etc. FAC 0
TODAY 0
- SAFETY LTIR 0
Use PPE due to work TRIR 0
CUMULATIVE 0
awareness 5 PPE mandatory and specific PPE (apron, gloves, face shield) SR 0
keep safe from line of fire (swing area Crane)
TOTAL MAN HOURS WORKED 15360
pre use check of cylinder gas a prior to utilized, etc.
- ENVIRONMENT
TODAY MAN HOURS STATUS
Keep the environment clean
Cleaning housekeeping for domestic waste, Separate of waste bin an appropriate with types of waste CONST TODAY PREV. ACCUM.
COMPANY TYPE
manag for B3 waste (oil, diesel, cat, tinner, etc) and keep it from the enviro polluting, etc MP WH MH MP MH MP MH
PT.CHPK Fab.material 36 8 288 1884 15072 1920 15360
INSPECTION STATUS
INSPECTOR TIME INSPECTOR TIME
INSPECTOR TIME INSPECTOR TIME
ATTACHED DOCUMENT HSE CHECK LIST
► Any unsafe Work Practice, Behavior & Near Miss & Incident :
2. QC 96 2 98
3. Painter / Blaster 248 6 254
TRIR 0
4. Helper Blasting 200 5 205
Cumulative
5. Welding Inspector 0 0 0 LTI Free Man-Hours
6. Fitter 120 3 123 SR 0
Non Local 350 5 355 Local & Non Local 15,072 288 15,360
Labor Foreigner
Local 0 0
Description Description
Description Part No./Size Marking Cutting Rolling Blasting Painting
Bottom
Shell Shell # 4 1 1
(D-320-02-A)
Shell # 5 1 1 2
Shell # 4 3
Today Activity (D-320-02-B)
Roof
Roof Structure
Bottom
Annular
Roof
Item of
Concern
EPC ISBL and OSBL for the RDMP PROJECT
RDMP RU V – BALIKPAPAN
RDMP BALIKPAPAN JO
Today
No. Description Total BQ
Equipment Status
Crane 25 Ton 1 Ready on Ws.CIRO
Equipment Blasting & Painting 2 1 unit Ready on CIRO,1 unit Ready on Mlir
Unit of
Disc Unit Description Total Qty Acum Last
Measure Today
Day
PREPARED BY,
PT.Cahaya Hidup Primakarya CHECK & REVIEWED BY,
EQUIPMENT STATUS
11-Oct-19
Today
Accum Remark
Equipment Status
Ready on Ws.CIRO 1
Ready on Ws.CIRO 1
UANTITY REPORT
Quantity
16 1 94.1% - 1
12 1 70.6% - 5
9 1 52.9% - 8
15 1 88.2% - 2
16 1 94.1% - 1
1 1 5.9% - 16
Quantity
APPROVED BY,
RDMP JO
( Achmad Djaniarko )
AREA SI / GSI
PROJECT : Field Erected Tank Package
PROJECT NO : 26070-100-HC-000-00003-000
DATE : Friday, October 11, 2019
Indivi
No. Work Item WF %
Last Day
### 1 RFCC Feed Tank( D-320-12 ) 23.51% 46.21%
### 2 RFCC Feed Tank( D-320-02-A ) 38.24% 28.18%
### 3 RFCC Feed Tank( D-320-02-B ) 38.24% 54.48%
### TOTAL 100.00%
No./
Description Material Qty/BQ
Mark
D-320-02-B
1 Bottom Plate A537 Gr.70 163
2 Annular Plate A537 Gr.70 34
3 Shell Plate A537 Gr.70 153
4 Roof Plate A283 Gr.C 183
D-320-02-A
1 Bottom Plate A537 Gr.70 163
2 Annular Plate A537 Gr.70 34
3 Shell Plate A537 Gr.70 153
4 Roof Plate A283 Gr.C 183
D-320-12
1 Bottom Plate A537 Gr.70 91
2 Annular Plate A537 Gr.70 14
3 Shell Plate A537 Gr.70 126
4 Roof Plate A283 Gr.C 117
SUMMARY FABRICATION PROGRESS
Individual Progress to
Today Progress (%) Last Day Today
0.00% 46.21% 10.86% 0.00%
0.13% 28.31% 10.78% 0.05%
0.54% 55.03% 20.84% 0.21%
42.48% 0.26%
65.0% 30.0%
40.0% 25.0% 30.0%
Sandblast/Pri
Total Weight (Kg)
Marking /Cutting Rolling
mer Coat
225140.16 163 0 24
17031.28 34 0 34
691135 42 0 0
212380.16 183 0 0
123478.18 91 0 91
20396.74 14 0 14
434891.850426054 126 0 0
127425.2 117 0 22
ess to
Remarks
Progress (%)
10.86%
10.83%
21.05%
42.74% 1
5.0% 100.0%
5.0% 100.0%
Delivery on
Progress (%)
site
0 95.0%
34 100.0%
0 47.7%
0 88.1%
0 69.4%
34 100.0%
0 11.0%
0 65.0%
0 95.0%
14 100.0%
0 40.0%
0 70.6%
EPC ISBL and OSBL for the RDMP PROJECT
RDMP RU V – BALIKPAPAN
RDMP BALIKPAPAN JO
DAILY QUANTITY REPORT
Contract Title :
#REF!
EPC ISBL and OSBL for the RDMP PROJECT RU V BALIKPAPAN
Contract No. :
Area : RDMP
25/00000/2018-S0
#REF!
Shift : Work Hours #REF!
#REF! Total Work Hours = #REF!
Work Quantity
Unit of
Disc. Unit Description
Measure
Total QTY. Up to Last Day Today Up to Today Remark
%
EARLY WORK Drilling Activity m
Soil TANK
CPT Activity Point
Investigation (OSBL AREA
9)
Drilling Activity m
Soil
Common UG Detection Works Ha
Investigation
Positioning & Leveling Point