PART - A (ROAD WORK DRAWINGS)
LEGENDS
DESIGN REPORT
STANDARD DRAWINGS
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\0.Cont Contents.dwg Dec 30, 2014 - 2:51pm maninder.v
LOCATION MAP
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\0.LOCA LOCATION MAP.dwg Dec 30, 2014 - 2:52pm maninder.v
Typical Cross Section
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE PAVED CARRIAGEWAY PAVED SPACE
SHOULDER
SHOULDER
(As Required) (As Required)
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2.5 % 2.5 %
3.0 % 3.0 %
2 2
1 1
ROW
ROW
BC PCC (Varies)
DBM DETAIL AT "F"
EXISTING PAVEMENT
WMM II
WMM I
GSB DETAIL AT "B"
SUBGRADE
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2.5 % 2.5 %
3.0 % 3.0 %
2 2
1 1
ROW
ROW
BC
DBM
DETAIL AT "F"
WMM II
WMM I
GSB
DETAIL AT "B"
SUBGRADE
PAVED EARTHEN
SHOULDER SHOULDER
2.5 % 3.0 %
BC
DBM 150
WMM I 150
WMM II
2
4%SLOPE 4%SLOPE GSB 1
n* n*
500(MIN.)
SUBGRADE
1 1
h*
500
DETAIL AT "F"
DETAIL AT "B"
EARTHEN DRAIN (TYPE-I)
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\1.TCS\ TCS.dwg Dec 30, 2014 - 2:46pm maninder.v
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2.5 % 2.5 %
3.0 % 3.0 %
2 2
1 1
ROW
ROW
EMBANKMENT FILL
BC
DBM DETAIL AT "F"
WMM II
EXISTING PAVEMENT
WMM I
GSB DETAIL AT "B"
SUBGRADE
PAVED EARTHEN
SHOULDER SHOULDER
2.5 % 3.0 %
4%SLOPE 4%SLOPE
BC
DBM 150
WMM I 150
n* n*
500(MIN.)
WMM II
1 1
h*
2
GSB 1
SUBGRADE
500
DETAIL AT "B"
EARTHEN DRAIN (TYPE-I)
DETAIL AT "F"
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\1.TCS\ TCS.dwg Dec 30, 2014 - 2:46pm maninder.v
RIGHT OF WAY 150
200
CL
50 50
2.5 % 2.5 %
100
M-15(PCC)
250
BC
DETAIL AT "G" DETAIL AT "G"
PCC (Varies)
DBM
WMM II EXISTING PAVEMENT
WMM I
GSB
SUBGRADE DETAIL AT "C"
225
TCS-2 - RECONSTRUCTION + WIDENING IN URBAN SECTION
DETAIL AT "C"
( FOR DRAIN DETAILS REFER STANDARD DRAWING )
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\1.TCS\ TCS.dwg Dec 30, 2014 - 2:46pm maninder.v
RIGHT OF WAY
2.5 % 2.5 %
150
BC
PCC (Varies) DETAIL AT "G"
DBM
WMM II EXISTING PAVEMENT M-25(PCC)
WMM I
200
GSB
SUBGRADE DETAIL AT "D" 50 50
100
M-15(PCC)
TCS-3A - RECONSTRUCTION + WIDENING IN SEMI URBAN AREA
250
DETAIL AT "G"
RIGHT OF WAY
2.5 % 2.5 %
TCS-3B - RECONSTRUCTION + WIDENING IN SEMI URBAN AREA ( FOR DRAIN DETAILS REFER STANDARD DRAWING )
TCS 3 - 2 LANE WITH PAVED SHOULDERS/6m CARRIAGEWAY & COVERED LINED DRAIN
(SEMI URBAN)
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\1.TCS\ TCS.dwg Dec 30, 2014 - 2:46pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
TYPICAL CROSS SECTIONS
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/TCS- 004
(Garautha-Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\1.TCS\ TCS.dwg Dec 30, 2014 - 2:46pm maninder.v
DESIGN REPORT
DETAILS OF HORIZONTAL ALIGNMENT
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\2.HIP HIP.dwg Dec 30, 2014 - 2:53pm maninder.v
DETAILS OF HORIZONTAL ALIGNMENT
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\2.HIP HIP.dwg Dec 30, 2014 - 2:54pm maninder.v
DETAILS OF VERTICAL ALIGNMENT
CHAIANAGE LEVEL START LEVEL END LEVEL LENGTH TYPE GRADE IN GRADE OUT k value
118662.265 157.270 118632.265 157.648 118692.265 157.270 60.0000 Sag 47.5730 -1.261 0
118790.600 157.270 118760.600 157.270 118820.600 157.836 60.0000 Sag 31.7990 0 1.887
118918.828 159.689 118868.828 158.746 118968.828 160.036 100.0000 Hog 83.7060 1.887 0.692
119589.673 164.333 119529.673 163.918 119649.673 164.035 120.0000 Hog 100.9480 0.692 -0.497
119748.541 163.544 119698.541 163.793 119798.541 163.838 100.0000 Sag 92.2930 -0.497 0.587
119962.769 164.802 119932.769 164.626 119992.769 164.828 60.0000 Hog 119.8560 0.587 0.086
120593.842 165.347 120563.842 165.321 120623.842 165.551 60.0000 Sag 101.3930 0.086 0.678
120800.079 166.746 120770.079 166.542 120830.079 166.587 60.0000 Hog 49.7030 0.678 -0.529
121000.000 165.688 120970.000 165.847 121030.000 165.750 60.0000 Sag 81.4880 -0.529 0.207
121246.986 166.200 121216.986 166.138 121276.986 166.202 60.0000 Hog 300.2860 0.207 0.007
121699.596 166.234 121669.596 166.232 121729.596 166.124 60.0000 Hog 160.0550 0.007 -0.367
121810.979 165.825 121780.979 165.935 121840.979 165.943 60.0000 Sag 78.8630 -0.367 0.393
122022.908 166.659 121992.908 166.541 122052.908 166.578 60.0000 Hog 90.8130 0.393 -0.267
122200.000 166.185 122170.000 166.265 122230.000 166.284 60.0000 Sag 100.7140 -0.267 0.328
122410.025 166.875 122380.025 166.777 122440.025 167.057 60.0000 Sag 217.0150 0.328 0.605
122542.099 167.674 122512.099 167.493 122572.099 167.544 60.0000 Hog 57.8260 0.605 -0.433
122930.000 165.996 122900.000 166.126 122960.000 166.006 60.0000 Sag 129.0450 -0.433 0.032
123249.947 166.099 123199.947 166.083 123299.947 165.922 100.0000 Hog 258.6830 0.032 -0.354
123433.656 165.449 123403.656 165.555 123463.656 165.632 60.0000 Sag 62.1150 -0.354 0.612
123569.999 166.283 123539.999 166.099 123599.999 166.346 60.0000 Hog 150.0430 0.612 0.212
124140.000 167.490 124110.000 167.426 124170.000 167.792 60.0000 Sag 75.5870 0.212 1.006
124299.240 169.091 124269.240 168.790 124329.240 168.919 60.0000 Hog 37.9850 1.006 -0.574
124480.000 168.054 124450.000 168.226 124510.000 168.117 60.0000 Sag 76.4790 -0.574 0.211
124930.701 169.003 124900.701 168.940 124960.701 168.978 60.0000 Hog 205.3120 0.211 -0.082
125111.411 168.855 125081.411 168.880 125141.411 168.903 60.0000 Sag 250.1990 -0.082 0.158
125609.414 169.643 125534.414 169.524 125684.414 168.675 150.0000 Hog 103.6070 0.158 -1.290
125871.742 166.259 125841.742 166.646 125901.742 166.196 60.0000 Sag 55.6710 -1.290 -0.212
126176.635 165.614 126076.635 165.825 126276.635 166.720 200.0000 Sag 151.7010 -0.212 1.107
126488.671 169.066 126438.671 168.513 126538.671 168.855 100.0000 Hog 65.4400 1.107 -0.422
126687.309 168.229 126637.309 168.440 126737.309 168.588 100.0000 Sag 87.7270 -0.422 0.718
127152.641 171.571 127072.641 170.996 127232.641 171.226 160.0000 Hog 139.1830 0.718 -0.431
127460.235 170.244 127430.235 170.374 127490.235 170.424 60.0000 Sag 58.2100 -0.431 0.599
127713.039 171.760 127638.039 171.310 127788.039 170.750 150.0000 Hog 77.0550 0.599 -1.347
127952.147 168.539 127922.147 168.943 127982.147 168.638 60.0000 Sag 35.7940 -1.347 0.329
128140.000 169.157 128110.000 169.058 128170.000 169.312 60.0000 Sag 321.1400 0.329 0.516
128316.965 170.070 128286.965 169.915 128346.965 170.172 60.0000 Hog 344.2100 0.516 0.342
128670.000 171.276 128640.000 171.174 128700.000 171.563 60.0000 Sag 97.2960 0.342 0.958
128941.256 173.875 128901.256 173.492 128981.256 173.626 80.0000 Hog 50.5720 0.958 -0.624
129167.898 172.462 129092.898 172.930 129242.898 173.129 150.0000 Sag 99.1020 -0.624 0.890
129413.840 174.651 129383.840 174.384 129443.840 174.680 60.0000 Hog 75.7980 0.890 0.098
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/VIP- 001
(Garautha-Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\2.HIP VIP.dwg Dec 30, 2014 - 2:55pm maninder.v
DETAILS OF VERTICAL ALIGNMENT
CHAIANAGE LEVEL START LEVEL END LEVEL LENGTH TYPE GRADE IN GRADE OUT k value
129413.840 174.651 129383.840 174.384 129443.840 174.680 60.0000 Hog 75.7980 0.890 0.098
129731.861 174.964 129701.861 174.934 129761.861 175.309 60.0000 Sag 57.0410 0.098 1.150
129887.094 176.749 129857.094 176.404 129917.094 176.755 60.0000 Hog 53.0220 1.150 0.019
130021.037 176.774 129991.037 176.769 130051.037 176.962 60.0000 Sag 98.7670 0.019 0.626
130539.342 180.020 130414.342 179.237 130664.342 179.091 250.0000 Hog 182.5770 0.626 -0.743
130806.455 178.035 130756.455 178.406 130856.455 178.165 100.0000 Sag 99.5420 -0.743 0.261
131100.024 178.802 131050.024 178.672 131150.024 178.525 100.0000 Hog 122.5200 0.261 -0.555
131280.548 177.801 131250.548 177.967 131310.548 178.149 60.0000 Sag 34.9780 -0.555 1.161
131539.383 180.805 131509.383 180.457 131569.383 181.084 60.0000 Hog 258.5970 1.161 0.929
131822.152 183.431 131792.152 183.152 131852.152 183.431 60.0000 Hog 64.6500 0.929 0.001
132069.957 183.432 132039.957 183.432 132099.957 183.695 60.0000 Sag 68.3890 0.001 0.878
132448.000 186.751 132298.000 185.434 132598.000 187.201 300.0000 Hog 519.2970 0.878 0.300
132717.524 187.560 132687.524 187.470 132747.524 187.760 60.0000 Sag 163.3030 0.300 0.668
133251.083 191.122 133221.083 190.921 133281.083 191.368 60.0000 Sag 393.1030 0.668 0.820
133637.791 194.293 133537.791 193.473 133737.791 193.722 200.0000 Hog 143.7550 0.820 -0.571
133999.021 192.231 133939.021 192.573 134059.021 192.762 120.0000 Sag 82.3770 -0.571 0.886
134418.231 195.944 134318.231 195.058 134518.231 195.507 200.0000 Hog 151.2620 0.886 -0.437
135021.422 193.310 134921.422 193.747 135121.422 192.283 200.0000 Hog 338.5650 -0.437 -1.027
135367.990 189.750 135337.990 190.058 135397.990 190.103 60.0000 Sag 27.2100 -1.027 1.178
135673.193 193.345 135623.193 192.756 135723.193 193.578 100.0000 Hog 140.3760 1.178 0.465
135864.949 194.237 135789.949 193.888 135939.949 194.383 150.0000 Hog 552.6470 0.465 0.194
136141.011 194.773 136091.011 194.676 136191.011 195.265 100.0000 Sag 126.5210 0.194 0.984
136367.983 197.007 136292.983 196.269 136442.983 196.387 150.0000 Hog 82.8410 0.984 -0.826
137206.466 190.079 137106.466 190.905 137306.466 190.439 200.0000 Sag 168.5280 -0.826 0.360
138037.827 193.075 137937.827 192.715 138137.827 193.901 200.0000 Sag 429.5410 0.360 0.826
138618.884 197.875 138493.884 196.842 138743.884 197.173 250.0000 Hog 180.1930 0.826 -0.561
138879.075 196.414 138829.075 196.695 138929.075 196.629 100.0000 Sag 100.8790 -0.561 0.430
139591.425 199.477 139541.425 199.262 139641.425 199.491 100.0000 Hog 248.6540 0.430 0.028
140037.340 199.601 139937.340 199.573 140137.340 199.078 200.0000 Hog 363.3340 0.028 -0.523
140566.023 196.837 140416.023 197.621 140716.023 197.921 300.0000 Sag 240.9450 -0.523 0.722
141290.577 202.072 141165.577 201.169 141415.577 201.272 250.0000 Hog 183.5510 0.722 -0.640
141944.971 197.886 141869.971 198.366 142019.971 198.361 150.0000 Sag 117.7900 -0.640 0.634
142481.761 201.288 142356.761 200.496 142606.761 200.542 250.0000 Hog 203.1150 0.634 -0.597
143143.315 197.339 143043.315 197.936 143243.315 197.932 200.0000 Sag 168.1240 -0.597 0.593
143498.811 199.446 143398.811 198.853 143598.811 199.595 200.0000 Hog 451.4670 0.593 0.150
144629.966 201.138 144599.966 201.093 144659.966 200.931 60.0000 Hog 71.4050 0.150 -0.691
144733.909 200.420 144703.909 200.627 144763.909 200.467 60.0000 Sag 70.8760 -0.691 0.156
144959.857 200.772 144929.857 200.726 144989.857 200.717 60.0000 Hog 175.7740 0.156 -0.185
145120.044 200.475 145070.044 200.568 145170.044 200.986 100.0000 Sag 82.7820 -0.185 1.023
145346.856 202.794 145296.856 202.283 145396.856 203.016 100.0000 Hog 172.4230 1.023 0.443
146232.991 206.716 146082.991 206.052 146382.991 205.833 300.0000 Hog 291.0120 0.443 -0.588
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/VIP- 002
(Garautha-Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\2.HIP VIP.dwg Dec 30, 2014 - 2:55pm maninder.v
DETAILS OF VERTICAL ALIGNMENT
CHAIANAGE LEVEL START LEVEL END LEVEL LENGTH TYPE GRADE IN GRADE OUT k value
146232.991 206.716 146082.991 206.052 146382.991 205.833 300.0000 Hog 291.0120 0.443 -0.588
148380.000 194.084 148330.000 194.379 148430.000 194.123 100.0000 Sag 150.3690 -0.588 0.077
148592.133 194.247 148562.133 194.224 148622.133 193.916 60.0000 Hog 50.8070 0.077 -1.104
148992.909 189.822 148952.909 190.263 149032.909 190.009 80.0000 Sag 50.8470 -1.104 0.469
149290.790 191.219 149190.790 190.750 149390.790 191.005 200.0000 Hog 292.8670 0.469 -0.214
149960.000 189.788 149910.000 189.895 150010.000 189.720 100.0000 Sag 1297.5600 -0.214 -0.137
150079.586 189.625 150049.586 189.666 150109.586 189.828 60.0000 Sag 73.5890 -0.137 0.679
150356.044 191.501 150293.544 191.077 150418.544 191.267 125.0000 Hog 118.7740 0.679 -0.374
150927.425 189.365 150827.425 189.739 151027.425 188.791 200.0000 Hog 996.7200 -0.374 -0.574
151220.242 187.683 151190.242 187.855 151250.242 187.596 60.0000 Sag 211.5070 -0.574 -0.291
151899.735 185.707 151869.735 185.794 151929.735 185.541 60.0000 Hog 226.9570 -0.291 -0.555
152142.123 184.362 152112.123 184.528 152172.123 184.150 60.0000 Hog 401.9140 -0.555 -0.704
152901.178 179.015 152801.178 179.719 153001.178 179.489 200.0000 Sag 169.6820 -0.704 0.474
153692.583 182.768 153592.583 182.294 153792.583 182.838 200.0000 Hog 495.2380 0.474 0.070
154740.183 183.505 154540.183 183.365 154940.183 183.118 400.0000 Hog 1514.0950 0.070 -0.194
155180.000 182.653 155150.000 182.711 155210.000 182.695 60.0000 Sag 180.6170 -0.194 0.138
155334.614 182.867 155304.614 182.825 155364.614 182.814 60.0000 Hog 190.8000 0.138 -0.176
155583.341 182.429 155553.341 182.482 155613.341 182.520 60.0000 Sag 125.1250 -0.176 0.303
156094.835 183.981 155944.835 183.526 156244.835 182.940 300.0000 Hog 300.6130 0.303 -0.694
156297.399 182.575 156267.399 182.783 156327.399 182.318 60.0000 Hog 375.4160 -0.694 -0.854
156466.481 181.130 156416.481 181.557 156516.481 181.381 100.0000 Sag 73.6910 -0.854 0.503
156671.396 182.160 156641.396 182.009 156701.396 181.876 60.0000 Hog 41.3790 0.503 -0.947
156875.773 180.224 156845.773 180.508 156905.773 180.510 60.0000 Sag 31.5690 -0.947 0.953
157036.408 181.755 156986.408 181.279 157086.408 181.508 100.0000 Hog 69.0430 0.953 -0.495
157335.990 180.272 157285.990 180.520 157385.990 180.764 100.0000 Sag 67.6190 -0.495 0.984
157625.868 183.124 157595.868 182.829 157655.868 183.167 60.0000 Hog 71.4700 0.984 0.144
157910.098 183.534 157880.098 183.491 157940.098 183.397 60.0000 Hog 100.1110 0.144 -0.455
158064.213 182.833 158014.213 183.060 158114.213 181.156 100.0000 Hog 34.5090 -0.455 -3.353
158231.811 177.213 158181.811 178.890 158281.811 176.996 100.0000 Sag 34.2640 -3.353 -0.434
158465.151 176.200 158435.151 176.330 158495.151 176.200 60.0000 Sag 137.7900 -0.434 0.001
159261.714 176.209 159231.714 176.209 159291.714 176.037 60.0000 Hog 104.0830 0.001 -0.575
159469.337 175.015 159439.337 175.187 159499.337 175.189 60.0000 Sag 51.9240 -0.575 0.580
159648.239 176.053 159618.239 175.879 159678.239 175.930 60.0000 Hog 60.7180 0.580 -0.408
159987.902 174.667 159912.902 174.973 160062.902 176.877 150.0000 Sag 44.7180 -0.408 2.946
160312.055 184.218 160282.055 183.334 160342.055 183.614 60.0000 Hog 12.0950 2.946 -2.014
160530.409 179.820 160500.409 180.424 160560.409 179.629 60.0000 Sag 43.5180 -2.014 -0.636
160824.973 177.948 160744.973 178.456 160904.973 179.137 160.0000 Sag 75.3790 -0.636 1.487
161087.666 181.854 161007.666 180.664 161167.666 182.097 160.0000 Hog 135.2020 1.487 0.304
161735.881 183.823 161705.881 183.731 161765.881 184.081 60.0000 Sag 107.4980 0.304 0.862
162042.636 186.466 161992.636 186.035 162092.636 186.365 100.0000 Hog 93.8910 0.862 -0.203
162825.428 184.875 162795.428 184.936 162855.428 185.010 60.0000 Sag 91.8100 -0.203 0.450
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\2.HIP VIP.dwg Dec 30, 2014 - 2:55pm maninder.v
DETAILS OF VERTICAL ALIGNMENT
CHAIANAGE LEVEL START LEVEL END LEVEL LENGTH TYPE GRADE IN GRADE OUT k value
162825.428 184.875 162795.428 184.936 162855.428 185.010 60.0000 Sag 91.8100 -0.203 0.450
162975.286 185.550 162945.286 185.415 163005.286 185.519 60.0000 Hog 108.2440 0.450 -0.104
163044.990 185.478 163014.990 185.509 163074.990 185.587 60.0000 Sag 128.0360 -0.104 0.365
163278.173 186.328 163128.173 185.781 163428.173 186.177 300.0000 Hog 644.5100 0.365 -0.101
163495.000 186.109 163465.000 186.139 163525.000 186.268 60.0000 Sag 95.0560 -0.101 0.530
163583.509 186.579 163553.509 186.419 163613.509 186.629 60.0000 Hog 165.4640 0.530 0.168
164095.000 187.437 164065.000 187.386 164125.000 187.435 60.0000 Hog 344.0690 0.168 -0.007
164703.253 187.396 164673.253 187.398 164733.253 187.460 60.0000 Sag 271.2560 -0.007 0.215
164982.229 187.995 164952.229 187.930 165012.229 187.961 60.0000 Hog 184.4670 0.215 -0.111
165195.096 187.759 165165.096 187.792 165225.096 187.867 60.0000 Sag 127.1700 -0.111 0.361
165430.000 188.607 165400.000 188.499 165460.000 188.768 60.0000 Sag 343.2290 0.361 0.536
165628.920 189.673 165578.920 189.405 165678.920 189.738 100.0000 Hog 246.8250 0.536 0.131
166174.545 190.386 166144.545 190.347 166204.545 190.386 60.0000 Hog 458.8940 0.131 0.000
166895.901 190.386 166865.901 190.386 166925.901 190.540 60.0000 Sag 117.5670 0.000 0.510
167180.648 191.840 167105.648 191.457 167255.648 191.388 150.0000 Hog 134.8300 0.510 -0.602
167384.861 190.610 167309.861 191.062 167459.861 190.881 150.0000 Sag 155.6090 -0.602 0.362
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/VIP- 004
(Garautha-Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\2.HIP VIP.dwg Dec 30, 2014 - 2:55pm maninder.v
Plan and Profile
LEGEND FOR EXISTING FEATURES LEGEND FOR PROPOSED PLAN FEATURES
DESCRIPTION LINE TYPE & BLOCKS DESCRIPTION LINE TYPE & BLOCKS DESCRIPTION LINE TYPE & BLOCKS
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/LEGENDS- 001
(Garautha-Chirgaon Section of SH42) Date Dec 2014
START OF
PROJECT ROAD
Chianage 118+600
Easting 328656.200
Northing 2829803.110
Ch.=118968.828m
Lvl.=160.036m
Ch.=118868.828m
START OF
Ch.=118600.000m
Ch.=118820.600m
Ch.=118632.265m
Lvl.=158.746m
Ch.=118692.265m
Ch.=118760.600m
PROJECT ROAD
Lvl.=158.055m
Lvl.=157.836m
Lvl.=157.648m
Lvl.=157.270m
Lvl.=157.270m
Datum(m) = 152
158.055 158.055
157.792 157.803
157.507 157.557
157.037 157.379
156.596 157.286
156.357 157.270
156.178 157.270
155.971 157.270
155.993 157.270
156.227 157.329
156.408 157.514
156.675 157.825
157.156 158.202
157.716 158.579
158.221 158.949
158.604 159.276
158.813 159.555
158.833 159.786
158.786 159.970
158.770 160.113
158.848 160.251
FINISHED ROAD LEVEL (FRL) AT PCL (m)
118762.26
118807.26
118828.46
118873.46
WIDENING
w=5.3
e=7.0
e=2.5
SUPERELEVATION (%)
e=7.0
118600
118620
118640
118660
118680
118700
118720
118740
118760
118780
118800
118820
118840
118860
118880
118900
118920
118940
118960
118980
119000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:32pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 154
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=246.273m
119020 159.020 160.390
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:33pm yogesh
119060 159.566 160.667
CONSULTANT:-
119100 160.255 160.944
egisIndia
119160 160.631 161.359
L=80.000m
119180 160.706 161.497
PROJECT:-
G=0.692
119260 161.090 162.051
L=560.845m
FRL at PCL
e=4.7
e=4.7
119280 161.223 162.190
EGL / ERL at PCL
L=158.120m
R=600.000m
119300 161.330 162.328
L=80.000m
119420 162.277 163.159
VER 0
HOR 0
SCALE:-
119500 162.958 163.712
25
2.5
119520 163.136 163.851
Ch.=119529.673m
Lvl.=163.918m
50
5.0
1:2500 @ A2 SHEET
119540 163.299 163.984
Date
119580 163.552 164.141
Checked by
Prepared by
Designed by
Approved by
119600 163.549 164.160
L=120.000m
R=-10094.812m
Dec 2014
119640 163.380 164.079
Rajeev Gupta
Sanjay Kumar
Ch.=119649.673m
Lvl.=164.035m
Maninder Vashisth
Balkeshwar Mishra
R0
Ch.=119698.541m
Rev.
Ch.=119798.541m
119800 163.105 163.846 Lvl.=163.838m
Description
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 154
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:33pm yogesh
120060 164.132 164.886
L=405.687m
R=-20000.000m
120080 164.124 164.903
CONSULTANT:-
120100 164.149 164.920
egisIndia
120160 164.114 164.972
PROJECT:-
120260 164.459 165.059
G=0.086
L=571.073m
120300 164.494 165.093
L=201.595m
120380 164.535 165.162
VER 0
HOR 0
SCALE:-
120500 164.588 165.266
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
120540 164.571 165.301
EGL / ERL at PCL
Date
120580 164.637 165.348
Checked by
Prepared by
Designed by
Approved by
120600 164.626 165.417
L=60.000m
L=278.414m
R=10139.258m
Ch.=120623.842m
R=20000.000m
Dec 2014
120640 164.696 165.660
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Lvl.=166.542m
120780 164.800 166.600
Revisions
Chainage
L=60.000m
Description
Ch.=120830.079m
1x2x2
L=156.734m
Lvl.=166.587m
120+800
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 156
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=60.000m
121020 164.821 165.736
R=8148.762m
Ch.=121030.000m
Lvl.=165.750m
121040 164.870 165.771
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:33pm yogesh
121060 164.903 165.812
CONSULTANT:-
121100 164.933 165.895
G=0.207
121140 164.928 165.978
L=186.986m
egisIndia
121160 164.894 166.020
PROJECT:-
121260 165.040 166.196
L=60.000m
Span
Ch.=121276.986m
R=-30028.631m
Chainage
L=560.342m
121380 164.860 166.210
G=0.007
VER 0
HOR 0
SCALE:-
L=392.610m
EGL / ERL at PCL
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
121540 165.071 166.222
Date
121580 165.142 166.225
Checked by
Prepared by
Designed by
Approved by
121600 165.176 166.227
Span
Dec 2014
121640 165.234 166.230
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Box Culvert
R0
Rev.
Lvl.=166.124m
121740 165.483 166.086
L=207.356m
Span
R=5000.000m
Lvl.=165.935m
Description
L=60.000m
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 158
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=60.000m
122040 165.329 166.604
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:34pm yogesh
R=-9081.334m
Ch.=122052.908m
Lvl.=166.578m
Span
122060 165.331 166.559
Chainage
122080 165.335 166.506
CONSULTANT:-
122100 165.340 166.453
L=275.333m
Pipe Culvert
R=10000.000m
1X1.2
G=-0.267
122120 165.321 166.399
122+023
L=117.092m
122140 165.341 166.346
egisIndia
122160 165.394 166.292
Ch.=122170.000m
Lvl.=166.265m
122180 165.496 166.244
L=60.000m
122220 165.436 166.256
R=10071.391m
Ch.=122230.000m
Lvl.=166.284m
122240 165.571 166.317
PROJECT:-
122260 165.575 166.382
G=0.328
122320 165.593 166.579
L=150.025m
122340 165.623 166.645
L=256.099m
Ch.=122380.025m
122380 165.622 166.777
Span
Lvl.=166.777m
R=21701.453m
Ch.=122440.025m
122440 165.604 167.057
1X1.2
Lvl.=167.057m
122+445
VER 0
HOR 0
Span
SCALE:-
L=72.074m
Ch.=122512.099m
25
2.5
e=2.5
Lvl.=167.493m
122520 165.629 167.535
Box Culvert
50
5.0
1:2500 @ A2 SHEET
122540 165.638 167.594
1x2x2
122+540
L=60.000m
Ch.=122572.099m
Date
Lvl.=167.544m
122580 165.698 167.510
Checked by
Prepared by
Designed by
Approved by
122600 165.649 167.424
Dec 2014
122640 165.624 167.251
Rajeev Gupta
Sanjay Kumar
L=302.523m
R=12000.000m
Maninder Vashisth
Balkeshwar Mishra
Rev.
1X1.2
Description
Ch.=122900.000m
DRG. NO. :
Lvl.=166.126m
Ch.=122960.000m
122960 165.634 166.006 Lvl.=166.006m
Ch.=123599.999m
Ch.=123539.999m
Ch.=123199.947m
Ch.=123299.947m
Ch.=123463.656m
Ch.=123403.656m
Lvl.=166.346m
Lvl.=166.099m
Lvl.=166.083m
Lvl.=165.922m
Lvl.=165.632m
Lvl.=165.555m
Datum(m) = 160
165.510 166.019
165.410 166.025
165.286 166.032
165.331 166.038
165.208 166.044
165.251 166.051
165.467 166.057
165.621 166.064
165.625 166.070
165.326 166.077
165.137 166.083
164.992 166.082
165.274 166.065
165.487 166.033
164.976 165.985
164.776 165.922
164.728 165.851
164.639 165.780
164.604 165.710
164.612 165.639
164.662 165.568
164.759 165.518
164.910 165.532
164.896 165.611
164.855 165.732
164.886 165.854
164.799 165.977
165.259 166.099
165.607 166.208
165.547 166.290
165.375 166.346
165.314 166.389
165.360 166.431
165.498 166.473
165.613 166.516
165.744 166.558
165.835 166.600
165.866 166.643
165.919 166.685
166.014 166.727
166.050 166.770
166.011 166.812
165.977 166.854
166.020 166.897
166.077 166.939
166.191 166.982
166.286 167.024
166.353 167.066
166.434 167.109
166.486 167.151
166.468 167.193
FINISHED ROAD LEVEL (FRL) AT PCL (m)
WIDENING
e=6.3
e=2.5
SUPERELEVATION (%)
e=6.3
123000
123020
123040
123060
123080
123100
123120
123140
123160
123180
123200
123220
123240
123260
123280
123300
123320
123340
123360
123380
123400
123420
123440
123460
123480
123500
123520
123540
123560
123580
123600
123620
123640
123660
123680
123700
123720
123740
123760
123780
123800
123820
123840
123860
123880
123900
123920
123940
123960
123980
124000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:34pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 164
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:34pm yogesh
124060 166.666 167.320
Detailed Ref.Drg No.=
CONSULTANT:-
124100 166.773 167.405
EGIS/DPR/EIRH1UP020/DPR/MJI-002
Ch.=124110.000m
Lvl.=167.426m
124120 166.811 167.454
egisIndia
L=60.000m
124160 166.967 167.698
R=7558.747m
Ch.=124170.000m
L=299.259m
Lvl.=167.792m
R=-8000.000m
124180 167.006 167.892
G=1.006
L=99.240m
124240 166.923 168.495
PROJECT:-
124260 166.987 168.697
Ch.=124269.240m
Span
Lvl.=168.790m
124280 167.067 168.882
Chainage
L=60.000m
Box Culvert
R=-3798.539m
Ch.=124329.240m
1x2x2
Lvl.=168.919m
124+300
VER 0
HOR 0
SCALE:-
L=60.000m
Ch.=124510.000m
25
2.5
Lvl.=168.117m
e=2.5
50
5.0
1:2500 @ A2 SHEET
124540 167.387 168.180
L=456.445m
Date
124580 167.425 168.264
Checked by
Prepared by
Designed by
Approved by
124600 167.517 168.306
Dec 2014
124640 167.629 168.391
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Date
Dec 2014
DRG. NO. :
L=60.000m
Ch.=124960.701m
R=-20531.161m
Ch.=125534.414m
Ch.=125141.411m
Ch.=125081.411m
Ch.=125684.414m
Lvl.=169.524m
Lvl.=168.903m
Lvl.=168.880m
Lvl.=168.675m
Ch.=125841.742m
Ch.=125901.742m
Lvl.=166.646m
Lvl.=166.196m
Datum(m) = 160
168.657 168.946
168.653 168.930
168.381 168.913
168.208 168.897
168.148 168.881
168.164 168.871
168.154 168.878
168.160 168.900
168.260 168.932
168.357 168.964
168.380 168.995
168.420 169.027
168.419 169.058
168.509 169.090
168.554 169.122
168.572 169.153
168.569 169.185
168.562 169.217
168.549 169.248
168.566 169.280
168.617 169.311
168.638 169.343
168.672 169.375
168.695 169.406
168.744 169.438
168.776 169.470
168.813 169.501
168.791 169.531
168.779 169.533
168.667 169.496
168.546 169.420
168.448 169.306
168.307 169.153
168.086 168.961
167.611 168.731
166.995 168.474
166.362 168.216
165.790 167.959
165.147 167.701
164.399 167.443
163.621 167.185
162.814 166.927
162.054 166.669
161.619 166.441
161.498 166.284
161.803 166.200
162.047 166.157
162.412 166.115
162.618 166.073
162.751 166.030
162.861 165.988
FINISHED ROAD LEVEL (FRL) AT PCL (m)
125582.63
125652.63
125670.00
125738.34
125822.17
125890.00
125930.00
125998.80
WIDENING
w=5.3 w=5.3
e=6.5 e=6.5
e=2.5 e=2.5
SUPERELEVATION (%)
e=6.5 e=6.5
125000
125020
125040
125060
125080
125100
125120
125140
125160
125180
125200
125220
125240
125260
125280
125300
125320
125340
125360
125380
125400
125420
125440
125460
125480
125500
125520
125540
125560
125580
125600
125620
125640
125660
125680
125700
125720
125740
125760
125780
125800
125820
125840
125860
125880
125900
125920
125940
125960
125980
126000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:35pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 160
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=174.893m
126020 162.985 165.945
L=37.424m
126036.23
126040 163.120 165.903
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:35pm yogesh
126060 163.271 165.861
Ch.=126076.635m
126080 163.407 165.819 Lvl.=165.825m
L=75.000m
CONSULTANT:-
126100 163.591 165.794
126108.78
e=6.2
e=6.2
w=5.3
w=5.3
L=26.210m
126140 126137.44 163.958 165.823
egisIndia
R=-300.000m
126160 164.288 165.878
L=75.000m
L=200.000m
126200 165.018 166.066
R=15170.081m
126210.00
126220 165.469 166.199
PROJECT:-
126260 166.375 166.545
Ch.=126276.635m
126280 166.431 166.757 Lvl.=166.720m
Detailed Ref.Drg No.=
L=146.578m
JUNCTION IMPROVEMENT For
G=1.107
L=162.036m
126380 167.117 167.864
FRL at PCL
L=70.000m
126420 167.650 168.306
e=4.0
e=4.0
126460 168.135 168.714
L=39.945m
R=700.000m
VER 0
HOR 0
SCALE:-
126500 168.370 168.904
L=100.000m
25
2.5
R=-6543.954m
L=70.000m
50
5.0
1:2500 @ A2 SHEET
126540 168.335 168.850 Lvl.=168.855m
Date
126580 167.947 168.681
Checked by
Prepared by
G=-0.422
Designed by
Approved by
126600 167.805 168.597
L=98.638m
Dec 2014
L=155.197m
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Ch.=126737.309m
126740 168.210 168.607 Lvl.=168.588m
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 162
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:35pm yogesh
127060 170.334 170.906
Ch.=127072.641m
127080 170.418 171.047 Lvl.=170.996m
CONSULTANT:-
127100 170.460 171.166
egisIndia
127160 170.691 171.350
L=160.000m
127180 170.750 171.354
R=-13918.300m
127200 170.657 171.329
PROJECT:-
127260 170.212 171.108
G=-0.431
127340 169.762 170.763
L=197.594m
127360 169.769 170.677
L=1001.261m
Chainage
VER 0
HOR 0
Ch.=127490.235m
Box Culvert
SCALE:-
Lvl.=170.424m
127500 169.713 170.483
127+474
1X1.5X1.5
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
127540 169.723 170.723
Date
127580 170.052 170.962
L=147.804m
Checked by
Prepared by
Designed by
Approved by
127600 170.218 171.082
Dec 2014
Ch.=127638.039m
127640 170.550 171.322 Lvl.=171.310m
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
L=150.000m
Dec 2014
R=-7705.546m
Ch.=127788.039m
Lvl.=170.750m
127800 169.859 170.588
Description
DRG. NO. :
R=3579.395m
L=80.000m
Ch.=127982.147m
127+990
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 162
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:36pm yogesh
G=0.329
Span
128060 168.126 168.894
L=127.853m
Chainage
128080 168.125 168.960
e=4.7
e=4.7
CONSULTANT:-
128100 168.292 169.025
Box Culvert
Ch.=128110.000m
Lvl.=169.058m
L=190.997m
R=600.000m
128120 168.508 169.093
128+027
1X5.0X2.0
128140 168.745 169.171
egisIndia
L=60.000m
128160 168.752 169.262
R=32114.048m
Ch.=128170.000m
Lvl.=169.312m
128180 168.837 169.363
G=0.516
128240 169.024 169.673
PROJECT:-
L=116.965m
L=80.000m
128260 169.016 169.776
L=60.000m
EGL / ERL at PCL
L=22.699m L=60.000m
Ch.=128346.965m
R=-34421.031m
Lvl.=170.172m
128360 169.303 170.217
e=3.5
e=3.5
R=-800.000m
128420 169.556 170.422
VER 0
HOR 0
SCALE:-
G=0.342
25
L=293.035m
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
128540 169.985 170.832
Date
128580 170.105 170.969
Checked by
Prepared by
Designed by
Approved by
128600 170.104 171.037
Dec 2014
Ch.=128640.000m
128640 170.200 171.174
Rajeev Gupta
Lvl.=171.174m
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
R0
R=9729.618m
Ch.=128700.000m
Rev.
Dec 2014
Description
L=201.256m
DRG. NO. :
e=5.2
e=5.2
Ch.=129991.037m
Ch.=129917.094m
Ch.=129857.094m
Pipe Culvert EGL / ERL at PCL
Lvl.=176.769m
Lvl.=176.755m
Ch.=129761.861m
Lvl.=176.404m
Ch.=129701.861m
Chainage 129+090
Ch.=129443.840m
Ch.=129383.840m
Lvl.=175.309m
Lvl.=174.934m
Lvl.=174.680m
Span 3 X 1.0
Lvl.=174.384m
Ch.=129242.898m
Ch.=129092.898m
Lvl.=173.129m
Lvl.=172.930m
Datum(m) = 168
172.041 173.509
172.092 173.384
172.030 173.260
171.857 173.135
171.793 173.010
171.805 172.888
171.908 172.798
171.953 172.748
172.050 172.738
172.168 172.769
172.198 172.841
172.326 172.952
172.475 173.104
172.613 173.282
172.797 173.460
172.956 173.638
173.155 173.816
173.336 173.994
173.490 174.172
173.613 174.350
173.695 174.510
173.815 174.619
173.985 174.676
174.175 174.696
174.299 174.716
174.341 174.736
174.365 174.755
174.392 174.775
174.383 174.795
174.369 174.814
174.339 174.834
174.266 174.854
174.349 174.873
174.325 174.893
174.351 174.913
174.430 174.932
174.613 174.981
174.860 175.099
174.999 175.288
175.075 175.517
175.042 175.747
175.006 175.978
175.130 176.208
175.232 176.437
175.241 176.618
175.288 176.724
175.400 176.755
175.629 176.759
175.873 176.763
176.038 176.767
176.216 176.774
FINISHED ROAD LEVEL (FRL) AT PCL (m)
129851.76
129910.00
129931.96
129990.00
WIDENING
w=5.3
e=7.0
e=2.5
SUPERELEVATION (%)
e=7.0
129000
129020
129040
129060
129080
129100
129120
129140
129160
129180
129200
129220
129240
129260
129280
129300
129320
129340
129360
129380
129400
129420
129440
129460
129480
129500
129520
129540
129560
129580
129600
129620
129640
129660
129680
129700
129720
129740
129760
129780
129800
129820
129840
129860
129880
129900
129920
129940
129960
129980
130000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:36pm yogesh
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-006
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:36pm yogesh
Box Culvert Pipe Culvert Box Culvert
Box Culvert
Chainage 130+082 FRL at PCL Chainage 130+609 Chainage 130+703
Chainage 130+907
EGL / ERL at PCL Span 1X1.2 Span 1X3.0X2.0
Span 1X1.5X1.5
Ch.=130414.342m
Span 1X1.5X1.5
Ch.=130664.342m
Ch.=130756.455m
Ch.=130856.455m
Lvl.=179.237m
Lvl.=179.091m
Lvl.=178.406m
Lvl.=178.165m
Ch.=130051.037m
Lvl.=176.962m
Lvl.=176.769m
Datum(m) = 166
176.216 176.774
176.377 176.817
176.506 176.899
176.603 177.018
176.764 177.144
176.845 177.269
176.927 177.394
177.058 177.519
177.177 177.644
177.243 177.770
177.338 177.895
177.442 178.020
177.577 178.145
177.731 178.271
177.825 178.396
177.910 178.521
177.986 178.646
178.113 178.772
178.317 178.897
178.419 179.022
178.649 179.147
178.827 179.272
178.922 179.380
179.117 179.466
179.232 179.530
179.253 179.572
179.221 179.593
179.177 179.591
179.123 179.568
179.086 179.523
179.095 179.456
178.962 179.366
178.710 179.255
178.489 179.123
178.411 178.974
178.358 178.826
178.252 178.677
178.147 178.529
178.038 178.381
177.889 178.259
177.715 178.178
177.610 178.137
177.526 178.136
177.431 178.175
177.373 178.227
177.432 178.279
177.434 178.332
177.668 178.384
177.836 178.436
177.898 178.488
177.863 178.541
FINISHED ROAD LEVEL (FRL) AT PCL (m)
130910.00
130929.58
WIDENING
w=5.3
e=7.0
e=2.5
SUPERELEVATION (%)
e=7.0
130000
130020
130040
130060
130080
130100
130120
130140
130160
130180
130200
130220
130240
130260
130280
130300
130320
130340
130360
130380
130400
130420
130440
130460
130480
130500
130520
130540
130560
130580
130600
130620
130640
130660
130680
130700
130720
130740
130760
130780
130800
130820
130840
130860
130880
130900
130920
130940
130960
130980
131000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:36pm yogesh
Minor Bridge
Chainage 131+860
Span 3x8.0
FRL at PCL
Ch.=131852.152m
EGL / ERL at PCL
Ch.=131792.152m
Box Culvert Slab Culvert Slab Culvert
Lvl.=183.431m
Lvl.=183.152m
Chainage 131+100 Chainage 131+247 Chainage 131+265
Ch.=131569.383m
Ch.=131509.383m
Span 1X1.5X1.5 Span 1 X 1.5 Span 1 X 3.0
Lvl.=181.084m
Lvl.=180.457m
Ch.=131050.024m
Ch.=131150.024m
Ch.=131310.548m
Ch.=131250.548m
Lvl.=178.672m
Lvl.=178.525m
Lvl.=178.149m
Lvl.=177.967m
Datum(m) = 175
177.863 178.541
177.777 178.593
177.745 178.645
177.741 178.694
177.716 178.713
177.703 178.700
177.568 178.655
177.581 178.576
177.711 178.470
177.822 178.359
177.812 178.248
177.894 178.137
177.927 178.026
177.928 177.928
177.913 177.928
177.830 178.043
177.719 178.259
177.812 178.491
178.013 178.723
178.267 178.955
178.545 179.187
178.781 179.419
178.827 179.652
179.032 179.884
179.272 180.116
179.574 180.348
179.940 180.578
180.271 180.794
180.253 180.995
180.085 181.182
180.006 181.368
180.169 181.554
180.163 181.739
180.243 181.925
180.333 182.111
180.465 182.296
180.692 182.482
180.864 182.668
180.879 182.854
180.861 183.039
180.756 183.220
180.253 183.351
179.342 183.419
178.675 183.431
179.389 183.431
179.918 183.431
180.709 183.431
181.545 183.431
182.041 183.432
182.351 183.432
182.460 183.432
FINISHED ROAD LEVEL (FRL) AT PCL (m)
131072.78
131260.00
131330.00
131350.00
131422.57
WIDENING
w=5.3 w=5.3
e=6.2 e=4.4
e=2.5 e=2.5 e=2.5
SUPERELEVATION (%)
e=6.2 e=4.4
131000
131020
131040
131060
131080
131100
131120
131140
131160
131180
131200
131220
131240
131260
131280
131300
131320
131340
131360
131380
131400
131420
131440
131460
131480
131500
131520
131540
131560
131580
131600
131620
131640
131660
131680
131700
131720
131740
131760
131780
131800
131820
131840
131860
131880
131900
131920
131940
131960
131980
132000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:37pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 180
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
Ch.=132039.957m
132040 182.635 183.432
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:37pm yogesh
Lvl.=183.432m
L=60.000m
132090.00
R=6838.866m
Ch.=132099.957m
CONSULTANT:-
132100 182.933 183.696 Lvl.=183.695m
L=50.000m
132139.71
132140 183.041 184.047
egisIndia
132160 182.970 184.223
e=7.0
e=7.0
w=5.3
w=5.3
132180 183.089 184.398
L=49.464m
R=240.000m
132190.00
132200 183.090 184.574
G=0.878
L=198.043m
132220 183.045 184.749
L=50.000m
132240 183.065 184.925
PROJECT:-
132239.17
L=116.824m
132320 183.462 185.622
e=2.5
132340 183.599 185.786
L=60.000m
Box Culvert
e=5.2
e=5.2
132460 185.644 186.603
L=65.353m
L=300.000m
R=-360.000m
R=-51929.681m
VER 0
HOR 0
SCALE:-
132500 185.437 186.814
Span
25
2.5
132520 185.362 186.908
Chainage
L=60.000m
50
5.0
1:2500 @ A2 SHEET
132540 185.386 186.995
Pipe Culvert
Date
132580 185.778 187.144
Ch.=132598.000m
Checked by
Prepared by
Designed by
Approved by
132600 185.919 187.207 Lvl.=187.201m
Dec 2014
132640 186.284 187.327
Rajeev Gupta
Sanjay Kumar
G=0.300
Maninder Vashisth
Balkeshwar Mishra
L=89.524m
Dec 2014
Ch.=132747.524m
Lvl.=187.760m
132760 186.466 187.843
e=2.5
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 182
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=473.559m
133020 188.813 189.579
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:37pm yogesh
L=190.563m
133060 188.958 189.846
R=-2000.000m
133080 189.005 189.980
CONSULTANT:-
133100 189.115 190.113
egisIndia
133160 189.309 190.514
FRL at PCL
PROJECT:-
133260 190.063 191.200
L=60.000m
R=39310.328m
133280 190.225 191.359 Ch.=133281.083m
Lvl.=191.368m
L=551.599m
VER 0
HOR 0
SCALE:-
133500 192.455 193.163
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
133540 192.835 193.491 Lvl.=193.473m
Date
133580 193.026 193.758
Checked by
Prepared by
Designed by
Approved by
133600 193.173 193.849
Dec 2014
133640 193.176 193.948
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
L=200.000m
Balkeshwar Mishra
Ch.=133737.791m
133740 192.822 193.710 Lvl.=193.722m
DRG. NO. :
Lvl.=192.573m
L=152.689m
R=8237.714m
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 186
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=120.000m
L=152.689m
134020 191.769 192.509
R=8237.714m
134040 191.766 192.616
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:38pm yogesh
Ch.=134059.021m
134060 191.811 192.771 Lvl.=192.762m
CONSULTANT:-
134100 192.042 193.125
egisIndia
134160 192.595 193.656
G=0.886
134200 192.967 194.011
L=259.210m
134220 193.197 194.188
L=278.283m
134240 193.312 194.365
PROJECT:-
R=-10000.000m
134260 193.723 194.542
VER 0
HOR 0
Span
SCALE:-
134500 194.405 195.576
Chainage
25
2.5
Ch.=134518.231m
e=2.5
50
5.0
1:2500 @ A2 SHEET
134540 194.238 195.412
1x2x2
134+520
Date
134580 194.172 195.237
L=434.246m
Checked by
Prepared by
Designed by
Approved by
134600 194.124 195.150
Dec 2014
134640 194.030 194.975
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Rev.
Dec 2014
L=403.191m
EGIS/DPR/EIRH1UP020/DPR/MJI-007
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 184
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=200.000m
135040 192.434 193.022
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:38pm yogesh
L=90.510m
R=-33856.520m
135060 192.273 192.858
CONSULTANT:-
135100 191.962 192.496
egisIndia
135160 191.362 191.887
L=236.966m
135220 190.647 191.270
R=-20000.000m
G=-1.027
135240 190.359 191.065
PROJECT:-
L=216.568m
135260 190.068 190.859
L=60.000m
R=2720.990m Ch.=135397.990m
VER 0
HOR 0
SCALE:-
135500 190.593 191.305
L=345.270m
25
2.5
e=2.5
G=1.178
50
5.0
1:2500 @ A2 SHEET
135540 191.209 191.776
Date
135580 191.590 192.247
Checked by
Prepared by
Designed by
Approved by
135600 191.873 192.483
Dec 2014
135640 192.159 192.944
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
R0
Rev.
R=20000.000m
L=66.756m
Ch.=135789.949m
Lvl.=193.888m
135800 193.265 193.934
Description
DRG. NO. :
Ch.=135939.949m
135940 193.823 194.383 Lvl.=194.383m
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 186
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
G=0.194
L=151.062m
136040 194.019 194.577
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:38pm yogesh
136060 194.060 194.616
CONSULTANT:-
136100 194.140 194.697
L=573.763m
136140 194.256 194.866
egisIndia
L=100.000m
136160 194.412 194.998
R=12652.139m
136180 194.599 195.161
Ch.=136191.011m
Lvl.=195.265m
136200 194.785 195.354
PROJECT:-
G=0.984
L=101.972m
136260 195.346 195.944
L=150.000m
R=-8284.051m
VER 0
HOR 0
SCALE:-
136500 195.409 195.916
25
2.5
L=186.024m
e=2.5
50
5.0
1:2500 @ A2 SHEET
136540 195.016 195.586
Date
136580 194.702 195.255
FRL at PCL
Checked by
Prepared by
Designed by
Approved by
136600 194.468 195.090
EGL / ERL at PCL
Dec 2014
136640 194.164 194.759
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
R0
Rev.
Dec 2014
136+700
L=259.478m
DRG. NO. :
Ch.=137937.827m
Lvl.=192.715m
Ch.=137106.466m
Ch.=137306.466m
Lvl.=190.905m
Lvl.=190.439m
Datum(m) = 182
191.349 191.785
191.178 191.619
190.978 191.454
190.747 191.289
190.539 191.124
190.460 190.958
190.576 190.799
190.578 190.661
190.415 190.548
190.307 190.458
190.204 190.392
190.032 190.349
189.852 190.331
189.713 190.336
189.564 190.365
189.585 190.417
189.662 190.488
189.778 190.560
189.879 190.632
189.927 190.704
190.059 190.776
190.174 190.848
190.227 190.920
190.257 190.993
190.267 191.065
190.122 191.137
189.998 191.209
189.920 191.281
189.840 191.353
189.567 191.425
189.478 191.497
189.525 191.569
189.681 191.641
189.881 191.713
190.030 191.785
190.124 191.858
190.255 191.930
190.429 192.002
190.602 192.074
190.755 192.146
191.006 192.218
191.087 192.290
191.327 192.362
191.629 192.434
191.843 192.506
191.848 192.578
191.849 192.651
191.922 192.723
192.127 192.800
192.325 192.887
192.410 192.984
FINISHED ROAD LEVEL (FRL) AT PCL (m)
R=16852.795m G=0.360
VERTICAL PROFILE L=200.000m L=631.361m
AT PROPOSED CENTER LINE (PCL)
R=270.000m L=80.000m
L=80.000m R=-5000.000m R=-1000.000m
HORIZONTAL ALIGNMENT
L=148.992m L=22.720m L=46.515m L=188.925m
L=331.368m L=50.000m L=50.204m L=50.000m
w=5.3
137139.45
137219.45
137242.18
137322.18
WIDENING
w=5.3
e=7.0 e=4.4
e=2.5 e=2.5
SUPERELEVATION (%)
e=7.0 e=4.4
137000
137020
137040
137060
137080
137100
137120
137140
137160
137180
137200
137220
137240
137260
137280
137300
137320
137340
137360
137380
137400
137420
137440
137460
137480
137500
137520
137540
137560
137580
137600
137620
137640
137660
137680
137700
137720
137740
137760
137780
137800
137820
137840
137860
137880
137900
137920
137940
137960
137980
138000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:39pm yogesh
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-008
Slab Culvert
Chainage 138+850
Span 1 X 5.0
Pipe Culvert
Ch.=138743.884m
FRL at PCL
Ch.=138493.884m
Ch.=138829.075m
Ch.=138929.075m
Chainage 138+108 EGL / ERL at PCL
Lvl.=197.173m
Lvl.=196.842m
Lvl.=196.695m
Lvl.=196.629m
Span 1X1.2
Ch.=138137.827m
Lvl.=193.901m
Datum(m) = 186
192.410 192.984
192.371 193.090
192.259 193.205
192.197 193.329
192.188 193.462
192.223 193.605
192.435 193.758
192.609 193.919
192.786 194.084
193.059 194.250
193.421 194.415
193.749 194.580
194.047 194.745
194.310 194.910
194.483 195.076
194.608 195.241
194.796 195.406
194.991 195.571
195.142 195.736
195.230 195.902
195.381 196.067
195.714 196.232
195.839 196.397
195.997 196.563
196.099 196.728
196.145 196.892
196.146 197.039
196.070 197.164
196.078 197.267
196.104 197.348
196.093 197.407
196.067 197.443
196.068 197.457
196.188 197.449
196.344 197.419
196.414 197.366
196.655 197.292
196.802 197.195
196.874 197.083
196.763 196.971
196.437 196.858
196.397 196.746
196.516 196.640
196.300 196.569
196.161 196.538
196.266 196.546
196.506 196.594
196.660 196.676
196.527 196.762
196.447 196.848
196.387 196.934
FINISHED ROAD LEVEL (FRL) AT PCL (m)
WIDENING
e=2.5
SUPERELEVATION (%)
138000
138020
138040
138060
138080
138100
138120
138140
138160
138180
138200
138220
138240
138260
138280
138300
138320
138340
138360
138380
138400
138420
138440
138460
138480
138500
138520
138540
138560
138580
138600
138620
138640
138660
138680
138700
138720
138740
138760
138780
138800
138820
138840
138860
138880
138900
138920
138940
138960
138980
139000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:39pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 190
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:39pm yogesh
139060 196.304 197.192
CONSULTANT:-
139100 196.347 197.364
L=376.852m
139140 196.351 197.536
egisIndia
139160 196.448 197.622 Span
Chainage
PROJECT:-
G=0.430
L=612.350m
139260 197.112 198.052
VER 0
HOR 0
SCALE:-
139500 198.461 199.084
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
139540 198.449 199.256 Ch.=139541.425m
Lvl.=199.262m
139560 198.454 199.335
Date
139580 198.558 199.398
Checked by
Prepared by
Designed by
Approved by
139600 198.599 199.445
L=100.000m
R=-24865.356m
Dec 2014
139640 198.527 199.490 Ch.=139641.425m
Rajeev Gupta
Sanjay Kumar
Lvl.=199.491m
Maninder Vashisth
Balkeshwar Mishra
L=66.997m
R0
Rev.
Description
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 188
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:40pm yogesh
L=200.000m
L=462.696m
140060 198.649 199.400
R=-36333.367m
140080 198.579 199.333
CONSULTANT:-
140100 198.366 199.254
egisIndia
140160 198.268 198.960
PROJECT:-
140260 198.006 198.437
G=-0.523
L=278.683m
140300 197.585 198.228
L=108.004m
EGL / ERL at PCL
R=-3000.000m
140360 197.468 197.914
VER 0
HOR 0
SCALE:-
140500 196.684 197.329
25
2.5
e=2.5
Span
50
5.0
1:2500 @ A2 SHEET
140540 196.734 197.292
L=294.038m
Date
140580 196.679 197.322
L=300.000m
140+550
1X3.0X1.5
R=24094.487m
Checked by
Prepared by
Designed by
Approved by
140600 196.634 197.362
Dec 2014
140640 196.788 197.492
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Ch.=140716.023m
140720 197.572 197.950 Lvl.=197.921m
Date
Dec 2014
DRG. NO. :
e=2.5
L=449.554m
Pipe Culvert
Chainage 141+140
FRL at PCL
Span 1X1.2 EGL / ERL at PCL Slab Culvert
Chainage 141+976
Ch.=141415.577m
Ch.=141165.577m Span 1 X 2.2
Lvl.=201.272m
Lvl.=201.169m
Ch.=141869.971m
Lvl.=198.366m
Datum(m) = 190
199.169 199.972
199.304 200.117
199.501 200.261
199.676 200.406
199.870 200.550
200.104 200.695
200.236 200.839
200.349 200.984
200.373 201.128
200.587 201.267
200.839 201.385
200.965 201.481
201.023 201.555
201.035 201.608
200.980 201.639
201.025 201.647
200.941 201.635
200.830 201.600
200.927 201.543
200.894 201.465
200.709 201.365
200.547 201.244
200.428 201.116
200.311 200.988
200.243 200.860
200.074 200.732
199.827 200.604
199.627 200.476
199.512 200.348
199.253 200.220
199.033 200.092
198.874 199.965
198.822 199.837
198.773 199.709
198.697 199.581
198.525 199.453
198.416 199.325
198.401 199.197
198.335 199.069
198.044 198.941
197.882 198.813
197.794 198.685
197.799 198.557
197.916 198.429
197.918 198.306
197.711 198.212
197.621 198.152
197.736 198.126
197.871 198.134
197.968 198.176
198.014 198.252
FINISHED ROAD LEVEL (FRL) AT PCL (m)
R=11778.965m
VERTICAL PROFILE L=150.000m
AT PROPOSED CENTER LINE (PCL) L=250.000m L=454.394m
R=-18355.121m G=-0.640
R=-2000.000m R=2500.000m
HORIZONTAL ALIGNMENT
L=669.718m L=200.021m L=190.046m
L=136.580m
WIDENING
e=2.5
SUPERELEVATION (%)
141000
141020
141040
141060
141080
141100
141120
141140
141160
141180
141200
141220
141240
141260
141280
141300
141320
141340
141360
141380
141400
141420
141440
141460
141480
141500
141520
141540
141560
141580
141600
141620
141640
141660
141680
141700
141720
141740
141760
141780
141800
141820
141840
141860
141880
141900
141920
141940
141960
141980
142000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:40pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 190
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
Ch.=142019.971m
142020 198.260 198.362 Lvl.=198.361m
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:40pm yogesh
142060 198.481 198.615
L=84.032m
CONSULTANT:-
142100 198.588 198.869
egisIndia
142160 198.877 199.249
L=83.766m
R=-2000.000m
G=0.634
142200 199.129 199.502
L=336.790m
142220 199.248 199.629
PROJECT:-
142260 199.535 199.883
VER 0
HOR 0
SCALE:-
L=250.000m
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
142540 200.263 200.831
Date
142580 200.125 200.684
Checked by
Prepared by
Designed by
L=738.481m
Approved by
142600 200.026 200.581 Ch.=142606.761m
Lvl.=200.542m
142620 199.885 200.463
Dec 2014
142640 199.793 200.344
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 188
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:41pm yogesh
Lvl.=197.936m
143060 197.390 197.845
L=201.352m
R=12000.000m
143080 197.433 197.757
CONSULTANT:-
143100 197.416 197.693
egisIndia
143160 197.023 197.644
L=200.000m
R=16812.417m
143180 196.911 197.676
Span
Chainage
PROJECT:-
1 X 3.0
Lvl.=197.932m
143+216
L=191.264m
143280 197.102 198.149
G=0.593
L=155.496m
143340 197.461 198.505
VER 0
HOR 0
SCALE:-
143500 198.777 199.339
25
2.5
e=2.5
L=200.000m
50
5.0
1:2500 @ A2 SHEET
143540 199.004 199.469
EGL / ERL at PCL
Date
143580 199.060 199.563
Ch.=143598.811m
Checked by
Prepared by
Designed by
Approved by
143600 199.049 199.597 Lvl.=199.595m
Dec 2014
143640 199.126 199.657
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
TITLE :
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 192
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=79.485m
144020 199.384 200.225
R=-10000.000m
144040 199.395 200.255
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:41pm yogesh
144060 199.494 200.285
CONSULTANT:-
144100 199.568 200.345
G=0.150
L=102.852m
144120 199.706 200.375
L=1001.155m
144140 199.774 200.405
egisIndia
144160 199.770 200.435
FRL at PCL
PROJECT:-
L=182.947m
R=3000.000m
144260 199.923 200.585
L=138.805m
144420 199.366 200.824
VER 0
HOR 0
SCALE:-
144500 200.261 200.944
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
144540 200.381 201.003
L=117.788m
R=1200.000m
Date
144580 200.415 201.063
Checked by
Ch.=144599.966m
Prepared by
Designed by
Approved by
144600 200.534 201.093 Lvl.=201.093m
Dec 2014
144640 200.488 201.041
Rajeev Gupta
L=60.000m
Sanjay Kumar
Maninder Vashisth
Ch.=144659.966m
Balkeshwar Mishra
R0
L=43.943m
Rev.
Lvl.=200.627m
144720 200.224 200.534
Chainage
Date
Dec 2014
R=7087.645m
L=55.000m
DRG. NO. :
L=343.815m
Ch.=144989.857m
R=-17577.406m
Lvl.=200.717m
145000 200.106 200.698
PLAN & PROFILE
Ch.=145396.856m
Span 1X1.5X1.5
Ch.=145296.856m
Span 1X1.2
Lvl.=203.016m
Lvl.=202.283m
Ch.=145170.044m
Ch.=145070.044m
Lvl.=200.986m
Lvl.=200.717m
Lvl.=200.568m
Datum(m) = 194
200.106 200.698
199.956 200.661
199.811 200.624
199.719 200.587
199.822 200.555
199.910 200.567
199.916 200.626
199.980 200.734
200.071 200.890
200.167 201.088
200.296 201.293
200.685 201.497
201.060 201.702
201.329 201.906
201.532 202.111
201.705 202.315
201.900 202.504
202.038 202.670
202.159 202.813
202.223 202.933
202.276 203.030
202.387 203.118
202.518 203.207
202.640 203.295
202.749 203.384
202.898 203.472
202.986 203.561
203.077 203.649
203.182 203.738
203.277 203.826
203.361 203.915
203.465 204.003
203.602 204.092
203.677 204.180
203.769 204.269
203.852 204.357
203.889 204.446
203.925 204.534
204.043 204.623
204.122 204.711
204.235 204.800
204.390 204.888
204.407 204.977
204.448 205.065
204.479 205.154
204.469 205.242
204.445 205.331
204.630 205.419
204.697 205.508
204.882 205.596
205.090 205.685
FINISHED ROAD LEVEL (FRL) AT PCL (m)
WIDENING
e=7.0
e=2.5 e=2.5
SUPERELEVATION (%)
e=7.0
145000
145020
145040
145060
145080
145100
145120
145140
145160
145180
145200
145220
145240
145260
145280
145300
145320
145340
145360
145380
145400
145420
145440
145460
145480
145500
145520
145540
145560
145580
145600
145620
145640
145660
145680
145700
145720
145740
145760
145780
145800
145820
145840
145860
145880
145900
145920
145940
145960
145980
146000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:41pm yogesh
JUNCTION IMPROVEMENT For
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-011
EGIS/DPR/EIRH1UP020/DPR/MJI-010
FRL at PCL
EGL / ERL at PCL
Ch.=146082.991m
Ch.=146382.991m
Box Culvert
Lvl.=206.052m
Lvl.=205.833m
Chainage 146+810
Span 1x2x2
Datum(m) = 194
205.090 205.685
205.148 205.773
205.248 205.862
205.317 205.950
205.385 206.039
205.496 206.122
205.603 206.192
205.695 206.249
205.715 206.291
205.717 206.320
205.755 206.335
205.924 206.336
205.693 206.323
205.683 206.297
205.645 206.257
205.583 206.203
205.509 206.136
205.416 206.055
205.346 205.960
205.196 205.851
204.983 205.733
204.910 205.616
204.798 205.498
204.740 205.380
204.631 205.263
204.469 205.145
204.312 205.027
204.161 204.910
204.012 204.792
203.864 204.674
203.747 204.557
203.623 204.439
203.469 204.321
203.325 204.204
203.135 204.086
203.083 203.968
202.940 203.851
202.806 203.733
202.722 203.615
202.661 203.498
202.589 203.380
202.543 203.262
202.495 203.145
202.515 203.027
202.444 202.909
202.303 202.792
202.168 202.674
202.069 202.556
201.886 202.439
201.697 202.321
201.509 202.203
FINISHED ROAD LEVEL (FRL) AT PCL (m)
VERTICAL PROFILE
AT PROPOSED CENTER LINE (PCL) L=300.000m
R=-29101.186m
R=1200.000m L=40.000m R=20000.000m
L=40.000m
HORIZONTAL ALIGNMENT
L=312.606m L=181.261m L=351.143m L=462.077m
WIDENING
e=3.7
e=2.5
SUPERELEVATION (%)
e=3.7
146000
146020
146040
146060
146080
146100
146120
146140
146160
146180
146200
146220
146240
146260
146280
146300
146320
146340
146360
146380
146400
146420
146440
146460
146480
146500
146520
146540
146560
146580
146600
146620
146640
146660
146680
146700
146720
146740
146760
146780
146800
146820
146840
146860
146880
146900
146920
146940
146960
146980
147000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:42pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 188
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:42pm yogesh
147060 201.165 201.850
CONSULTANT:-
147100 200.943 201.615
L=462.077m
147120 200.812 201.497
R=20000.000m
147140 200.791 201.380
egisIndia
147160 200.666 201.262
PROJECT:-
147260 200.095 200.674
L=181.864m
147340 199.280 200.203
G=-0.588
L=1947.009m
147380 199.133 199.968
L=131.366m
VER 0
HOR 0
R=25000.000m
SCALE:-
Chainage
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
1x2x2
Date
147580 198.041 198.791
Checked by
Prepared by
Designed by
Approved by
147600 197.939 198.673
Dec 2014
147640 197.658 198.438
L=195.354m
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Rev.
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 184
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:42pm yogesh
148060 195.173 195.967
CONSULTANT:-
148100 194.914 195.732
egisIndia
148160 194.467 195.379
PROJECT:-
148260 194.070 194.790
L=1325.251m
R=15036.872m
Span
R=-17000.000m
148420 193.488 194.118
VER 0
HOR 0
SCALE:-
148500 193.197 194.176
G=0.077
25
2.5
L=132.133m
e=2.5
50
5.0
1:2500 @ A2 SHEET
148540 193.005 194.207
Date
148580 192.932 194.206
EGL / ERL at PCL
Checked by
Prepared by
Designed by
Approved by
148600 192.904 194.112
L=60.000m
R=-5080.742m
Dec 2014
148640 192.737 193.719
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Description
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 182
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=80.000m
R=5084.704m
149020 189.715 189.965
Ch.=149032.909m
149040 189.627 190.043 Lvl.=190.009m
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:43pm yogesh
Span
149060 189.675 190.136
Chainage
149080 189.850 190.230
CONSULTANT:-
149100 190.109 190.324
Slab Culvert
G=0.469
1 X 5.0
149120 190.284 190.418
149+011
L=157.881m
149140 190.317 190.512
egisIndia
149160 190.362 190.605
L=202.925m
149180 190.385 190.699
Ch.=149190.790m
Lvl.=190.750m
149200 190.378 190.792
PROJECT:-
149260 190.565 190.993
L=200.000m
R=-29286.741m
149320 190.277 191.071
L=242.050m
Lvl.=191.005m
VER 0
HOR 0
SCALE:-
149500 189.945 190.772
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
149540 189.937 190.686
Date
149580 189.932 190.601
EGL / ERL at PCL
Checked by
Prepared by
Designed by
Approved by
149600 189.985 190.558
Dec 2014
149640 189.896 190.472
Rajeev Gupta
Sanjay Kumar
L=271.877m
Maninder Vashisth
Balkeshwar Mishra
G=-0.214
DRG. NO. :
Ch.=149910.000m
Lvl.=189.895m
1 X 0.9
L=123.241m
Minor Bridge
Pipe Culvert
Chainage 150+037 FRL at PCL Pipe Culvert
EGL / ERL at PCL
Chainage 150+720
Span 4X3.5 Chainage 150+952
Span 1X1.2
Ch.=150418.544m
Ch.=150293.544m
Pipe Culvert Span 1X1.2
Lvl.=191.267m
Lvl.=191.077m
Ch.=150109.586m
Ch.=150827.425m
Ch.=150010.000m
Ch.=150049.586m
Chainage 150+092
Lvl.=189.828m
Lvl.=189.739m
Lvl.=189.720m
Lvl.=189.666m
Span 1 X 0.9
Datum(m) = 182
190.030 189.734
189.769 189.706
189.545 189.679
189.591 189.659
189.712 189.687
189.637 189.770
189.637 189.899
189.538 190.035
189.567 190.171
189.608 190.306
189.691 190.442
189.892 190.578
190.117 190.713
190.369 190.849
190.652 190.985
190.971 191.119
191.388 191.227
190.962 191.301
190.560 191.342
190.322 191.349
190.231 191.322
190.102 191.262
190.018 191.187
189.966 191.112
189.891 191.038
189.784 190.963
189.718 190.888
189.798 190.813
189.810 190.739
189.846 190.664
189.955 190.589
189.934 190.514
189.900 190.439
189.823 190.365
189.728 190.290
189.650 190.215
189.583 190.140
189.476 190.066
189.446 189.991
189.390 189.916
189.225 189.841
189.054 189.767
189.001 189.691
188.877 189.612
188.718 189.529
188.593 189.441
188.449 189.350
188.314 189.255
188.289 189.155
188.206 189.052
188.145 188.944
FINISHED ROAD LEVEL (FRL) AT PCL (m)
R=7358.876m G=0.679
VERTICAL PROFILE L=60.000m L=183.958m
AT PROPOSED CENTER LINE (PCL) L=39.586m L=125.000m L=408.881m L=200.000m
G=-0.137 R=-11877.428m G=-0.374 R=-99671.963m
R=-30.000m R=45.000m R=-2500.000m
HORIZONTAL ALIGNMENT
L=778.234m
L=38.948m L=23.442m L=54.401m L=117.817m
WIDENING
e=2.5
SUPERELEVATION (%)
150000
150020
150040
150060
150080
150100
150120
150140
150160
150180
150200
150220
150240
150260
150280
150300
150320
150340
150360
150380
150400
150420
150440
150460
150480
150500
150520
150540
150560
150580
150600
150620
150640
150660
150680
150700
150720
150740
150760
150780
150800
150820
150840
150860
150880
150900
150920
150940
150960
150980
151000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:43pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 178
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:43pm yogesh
L=65.630m
151060 187.790 188.604
Span
151080 187.676 188.489
Chainage
CONSULTANT:-
151100 187.554 188.374
Box Culvert
G=-0.574
151120 187.416 188.259
L=162.817m
1x2x2
151+100
egisIndia
151160 187.207 188.029
L=181.682m
R=2000.000m
151180 187.073 187.914
Ch.=151190.242m
Lvl.=187.855m
151200 186.964 187.802
L=60.000m
151240 186.813 187.628
PROJECT:-
R=21150.687m
Ch.=151250.242m
Lvl.=187.596m
151260 186.737 187.567
VER 0
HOR 0
SCALE:-
151500 186.031 186.870
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
151540 185.899 186.753
L=565.468m
Date
L=619.493m
Checked by
Prepared by
Designed by
Approved by
151600 185.648 186.579
Dec 2014
151640 185.543 186.462
Rajeev Gupta
Sanjay Kumar
Chainage
Maninder Vashisth
Balkeshwar Mishra
Rev.
DRG. NO. :
Ch.=151929.735m
R=-22695.690m
Lvl.=185.541m
Chainage
151+969
Ch.=152172.123m
Chainage 152+700
Lvl.=184.528m
Chainage 152+924
Lvl.=184.150m
Span 3x7.0
Span 1X1.5X1.5
Ch.=152801.178m
Ch.=153001.178m
Lvl.=179.719m
Lvl.=179.489m
Datum(m) = 172
184.253 185.151
184.140 185.040
184.045 184.929
183.953 184.818
183.868 184.706
183.791 184.595
183.681 184.484
183.553 184.364
183.394 184.234
183.197 184.095
183.008 183.954
182.954 183.813
182.894 183.672
182.797 183.531
182.641 183.390
182.426 183.249
182.125 183.109
181.818 182.968
181.574 182.827
181.436 182.686
181.391 182.545
181.368 182.404
181.247 182.263
181.040 182.122
180.772 181.981
180.464 181.841
180.159 181.700
179.872 181.559
179.599 181.418
179.363 181.277
179.207 181.136
179.067 180.995
178.819 180.854
178.526 180.714
178.316 180.573
178.459 180.432
178.301 180.291
178.277 180.150
178.304 180.009
178.383 179.868
178.433 179.727
178.505 179.597
178.618 179.490
178.629 179.407
178.366 179.347
178.183 179.311
178.249 179.298
178.193 179.309
178.368 179.344
178.550 179.402
178.740 179.483
FINISHED ROAD LEVEL (FRL) AT PCL (m)
R=16968.224m
VERTICAL PROFILE L=200.000m
AT PROPOSED CENTER LINE (PCL) L=182.388m L=60.000m L=629.055m
G=-0.555 R=-40191.435m G=-0.704
R=170.000m L=70.000m
R=-10000.000m R=-400.000m L=70.000m R=-1300.000m
HORIZONTAL ALIGNMENT
L=329.947m L=142.670m L=110.000m L=110.000m L=19.843m L=30.498m L=103.148m L=35.000m L=175.657m
L=52.621m
w=5.3
152574.67
152644.67
152675.17
152745.17
WIDENING
w=5.3
e=7.0 e=6.5 e=3.4
e=2.5 e=2.5
SUPERELEVATION (%)
e=7.0 e=6.5 e=3.4
152000
152020
152040
152060
152080
152100
152120
152140
152160
152180
152200
152220
152240
152260
152280
152300
152320
152340
152360
152380
152400
152420
152440
152460
152480
152500
152520
152540
152560
152580
152600
152620
152640
152660
152680
152700
152720
152740
152760
152780
152800
152820
152840
152860
152880
152900
152920
152940
152960
152980
153000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:44pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 172
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:44pm yogesh
Span
153060 178.377 179.768
Chainage
153080 178.277 179.863
L=35.000m
CONSULTANT:-
153100 178.211 179.958
Minor Bridge
3x8.0
153120 178.157 180.052
153+087
153140 178.376 180.147
egisIndia
153160 178.266 180.242
L=104.558m
Span
153180 178.493 180.337
Chainage
153200 178.723 180.432
Pipe Culvert
PROJECT:-
153260 179.579 180.716
G=0.474
L=591.405m
153320 180.486 181.001
L=330.527m
R=-10000.000m
VER 0
HOR 0
SCALE:-
153500 181.013 181.854
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
153540 181.153 182.044
Date
153580 181.343 182.234
Ch.=153592.583m
Checked by
Prepared by
Lvl.=182.294m
Designed by
Approved by
153600 181.399 182.328
FRL at PCL
Dec 2014
153640 181.437 182.496
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
L=338.265m
Date
Dec 2014
Ch.=153792.583m
153800 181.710 182.843 Lvl.=182.838m
Description
DRG. NO. :
Ch.=154540.183m
Ch.=154940.183m
Chainage 154+262 Chainage 154+720
Lvl.=183.365m
Lvl.=183.118m
Span 1X1.5X1.5 Span 1X2.0X2.0
Datum(m) = 176
181.727 182.984
181.705 182.998
181.668 183.012
181.687 183.026
181.721 183.041
181.804 183.055
181.792 183.069
181.818 183.083
181.847 183.097
181.799 183.111
181.792 183.125
181.835 183.139
181.898 183.153
181.902 183.167
181.870 183.181
181.813 183.195
181.797 183.209
181.834 183.224
181.846 183.238
181.829 183.252
181.853 183.266
181.826 183.280
181.756 183.294
181.699 183.308
181.709 183.322
181.719 183.336
181.706 183.350
181.704 183.364
181.704 183.377
181.724 183.387
181.745 183.395
181.776 183.400
181.807 183.402
181.793 183.401
181.774 183.398
181.725 183.393
181.670 183.384
181.698 183.373
181.739 183.360
181.693 183.343
181.653 183.324
181.691 183.303
181.752 183.279
181.726 183.252
181.744 183.222
181.755 183.190
181.798 183.155
181.844 183.118
181.862 183.079
181.888 183.041
181.870 183.002
FINISHED ROAD LEVEL (FRL) AT PCL (m)
G=0.070
VERTICAL PROFILE L=747.600m
AT PROPOSED CENTER LINE (PCL) L=400.000m
R=-151409.538m
R=20000.000m R=7000.000m R=-1400.000m R=800.000m L=30.000m
HORIZONTAL ALIGNMENT
R=-20000.000m L=30.000m
L=225.533m L=129.681m L=163.132m L=131.370m L=155.560m L=62.889m L=178.329m L L=45.862m
WIDENING
e=3.5
e=2.5
SUPERELEVATION (%)
e=3.5
154000
154020
154040
154060
154080
154100
154120
154140
154160
154180
154200
154220
154240
154260
154280
154300
154320
154340
154360
154380
154400
154420
154440
154460
154480
154500
154520
154540
154560
154580
154600
154620
154640
154660
154680
154700
154720
154740
154760
154780
154800
154820
154840
154860
154880
154900
154920
154940
154960
154980
155000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:44pm yogesh
Pipe Culvert
Box Culvert Chainage 155+323 Box Culvert Pipe Culvert
Pipe Culvert
Chainage 155+309 Chainage 155+639 Chainage 155+698
Chainage 155+142 Span 1X1.2
Span 1X3.0X1.5 Span 1X1.5X2.0 Span 1 X 1.0
Span 1X1.2 FRL at PCL
Ch.=155944.835m
EGL / ERL at PCL
Ch.=155304.614m
Ch.=155364.614m
Ch.=155150.000m
Ch.=155210.000m
Ch.=155613.341m
Ch.=155553.341m
Lvl.=183.526m
Lvl.=182.825m
Lvl.=182.814m
Lvl.=182.711m
Lvl.=182.695m
Lvl.=182.520m
Lvl.=182.482m
Datum(m) = 176
181.870 183.002
181.826 182.963
181.730 182.924
181.661 182.886
181.597 182.847
181.581 182.808
181.621 182.769
181.511 182.731
181.489 182.695
181.486 182.678
181.632 182.683
181.801 182.708
181.773 182.736
181.797 182.764
181.785 182.791
181.730 182.819
181.637 182.841
181.517 182.842
181.513 182.822
181.512 182.787
181.478 182.752
181.336 182.717
181.238 182.681
181.263 182.646
181.298 182.611
181.269 182.576
181.091 182.541
180.665 182.505
180.294 182.472
179.886 182.463
179.519 182.487
179.220 182.540
179.430 182.601
179.719 182.662
180.284 182.722
180.977 182.783
181.374 182.844
181.848 182.905
182.233 182.965
182.460 183.026
182.492 183.087
182.556 183.147
182.672 183.208
182.793 183.269
182.822 183.329
182.834 183.390
182.867 183.451
182.912 183.511
182.935 183.568
182.929 183.612
182.962 183.643
FINISHED ROAD LEVEL (FRL) AT PCL (m)
WIDENING
155020
155040
155060
155080
155100
155120
155140
155160
155180
155200
155220
155240
155260
155280
155300
155320
155340
155360
155380
155400
155420
155440
155460
155480
155500
155520
155540
155560
155580
155600
155620
155640
155660
155680
155700
155720
155740
155760
155780
155800
155820
155840
155860
155880
155900
155920
155940
155960
155980
156000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:45pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 174
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=25.000m
156020 182.973 183.660
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:45pm yogesh
156060 182.949 183.655
CONSULTANT:-
156100 182.886 183.597
L=300.000m
156120 182.901 183.547
R=-30061.309m
156140 182.892 183.485
egisIndia
156160 182.854 183.409
FRL at PCL
L=342.331m
156200 182.670 183.217
PROJECT:-
Ch.=156244.835m
Lvl.=182.940m
156260 182.276 182.834 Ch.=156267.399m
Lvl.=182.783m
156280 182.163 182.693
e=2.5
L=22.564m L=60.000m
156320 181.767 182.381 Ch.=156327.399m
G=-0.694 R=-37541.612m
Lvl.=182.318m
156340 181.503 182.211
G=-0.854
L=89.082m
VER 0
HOR 0
L=100.000m
SCALE:-
R=7369.113m
156+462
1X1.5X2.0
25
2.5
Ch.=156516.481m
R=-10000.000m
50
5.0
1:2500 @ A2 SHEET
156540 180.389 181.500
Date
156580 180.700 181.701
G=0.503
Checked by
Prepared by
Designed by
L=124.915m
Approved by
156600 180.944 181.801
Dec 2014
Span
Rajeev Gupta
Sanjay Kumar
Lvl.=182.009m
Chainage
Maninder Vashisth
Balkeshwar Mishra
L=60.000m
R0
1X1.2
R=-4137.891m
Rev.
Lvl.=181.876m
L=147.822m
Lvl.=180.508m
156860 179.731 180.405
Span
DRG. NO. :
R=3156.903m
L=57.533m
1 X 1.0
G=0.953
Box Culvert
Chainage 157+893
Ch.=157880.098m
Ch.=157940.098m
Ch.=157655.868m
Span 1X1.2 EGL / ERL at PCL
Ch.=157595.868m
Span 1X1.5X2.0
Lvl.=183.491m
Lvl.=183.397m
Lvl.=183.167m
Lvl.=182.829m
Ch.=157086.408m
Ch.=157385.990m
Ch.=157285.990m
Lvl.=181.508m
Lvl.=180.764m
Lvl.=180.520m
Datum(m) = 174
180.735 181.395
180.990 181.517
181.143 181.582
181.057 181.588
180.865 181.537
180.669 181.440
180.502 181.341
180.321 181.242
180.427 181.143
180.622 181.044
180.713 180.945
180.543 180.846
180.261 180.747
179.928 180.648
179.647 180.549
179.481 180.465
179.462 180.437
179.717 180.468
179.918 180.558
180.111 180.708
180.306 180.902
180.513 181.099
180.711 181.295
180.945 181.492
181.168 181.689
181.375 181.886
181.552 182.082
181.661 182.279
181.942 182.476
182.072 182.673
182.215 182.868
182.347 183.025
182.445 183.127
182.499 183.173
182.484 183.202
182.452 183.231
182.389 183.260
182.444 183.289
182.554 183.317
182.623 183.346
182.676 183.375
182.711 183.404
182.696 183.433
182.739 183.462
182.914 183.491
182.981 183.500
182.737 183.469
182.794 183.398
182.790 183.307
182.658 183.216
182.404 183.125
FINISHED ROAD LEVEL (FRL) AT PCL (m)
157982.97
WIDENING
e=2.5
SUPERELEVATION (%)
157000
157020
157040
157060
157080
157100
157120
157140
157160
157180
157200
157220
157240
157260
157280
157300
157320
157340
157360
157380
157400
157420
157440
157460
157480
157500
157520
157540
157560
157580
157600
157620
157640
157660
157680
157700
157720
157740
157760
157780
157800
157820
157840
157860
157880
157900
157920
157940
157960
157980
158000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:45pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 166
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=60.000m
158040 158042.97 182.179 182.847
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:46pm yogesh
158060 182.086 182.548
w=5.3
w=5.3
e=7.0
e=7.0
L=30.203m
158073.17
R=-200.000m
158080 181.831 182.134
L=100.000m
R=-3450.900m
CONSULTANT:-
158100 181.213 181.604
Ch.=158114.213m
158120 180.366 180.962 Lvl.=181.156m
L=60.000m
158133.17
158140 179.548 180.292
egisIndia
G=-3.353
158160 178.858 179.621
L=67.598m
158180 178.430 178.951 Ch.=158181.811m
Lvl.=178.890m
L=81.365m
158200 177.998 178.328
158220.10
158220 177.655 177.822
158230.00
158240 177.339 177.433
PROJECT:-
L=100.000m
R=3426.368m
158260 176.965 177.160
G=-0.434
Chainage
L=153.340m
158380 176.043 176.570
VER 0
HOR 0
SCALE:-
R=13779.030m
Ch.=158495.151m
158500 176.027 176.200 Lvl.=176.200m
e=2.5
25
2.5
158520 176.079 176.201
158534.31
50
5.0
1:2500 @ A2 SHEET
158540 158544.31 175.901 176.201
L
158554.36
158560 175.870 176.201
158569.36
Date
158580 175.834 176.201
Checked by
Prepared by
Designed by
Approved by
158600 175.931 176.202
Dec 2014
R=-90.000m
L=143.004m
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Dec 2014
TITLE :
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 168
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:46pm yogesh
159060 176.031 176.207
CONSULTANT:-
159100 176.007 176.207
egisIndia
159160 176.022 176.208
PROJECT:-
159260 159260.00
175.616 176.171
L=60.000m
159280 175.291 176.097
Ch.=159291.714m
R=-10408.282m
Lvl.=176.037m
159300 175.065 175.989
w=5.45
w=5.45
R=65.000m
L=143.868m
159340 172.069 175.759
G=-0.575
159380 174.266 175.529
L=147.623m
159389.04
L=21.615m
L=25.0
EGL / ERL at PCL
VER 0
HOR 0
SCALE:-
e=7.0
e=7.0
R=5192.434m
Ch.=159499.337m
159500 174.590 175.193
w=5.3
w=5.3
Lvl.=175.189m
L=117.613m
R=-250.000m
25
2.5
159520 174.631 175.309
50
5.0
1:2500 @ A2 SHEET
159540 174.696 175.425
159553.27
159560 174.928 175.541
L=25.0
G=0.580
Date
00m
L=118.902m
Checked by
Prepared by
Designed by
Approved by
159600 175.140 175.773
L=25.718m
Ch.=159618.239m
159620 175.166 175.889 Lvl.=175.879m
Dec 2014
159640 175.180 175.966
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Ch.=159678.239m
159680 175.235 175.923 Lvl.=175.930m
R0
L=155.981m
R=500.000m
Rev.
Description
DRG. NO. :
Ch.=159912.902m
159920 172.621 174.950 Lvl.=174.973m
Chainage
R=-1000.000m
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 170
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=150.000m
R=4471.765m
160020 174.900 175.818
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:46pm yogesh
L=50.000m
160060 176.182 176.792 Ch.=160062.902m
Lvl.=176.877m
e=2.5
160080 176.790 177.380
L=48.974m
CONSULTANT:-
160100 177.443 177.970
L=50.000m
160140 178.758 179.148
egisIndia
160160 179.297 179.738
FRL at PCL
G=2.946
160180 179.801 180.327
L=219.153m
EGL / ERL at PCL
e=4.0
e=4.0
160240 181.623 182.095
PROJECT:-
L=180.840m
160260 182.311 182.684
R=-480.000m
160280 182.736 183.273 Ch.=160282.055m
Lvl.=183.334m
160300 183.035 183.729
L=60.000m
R=-1209.514m
160340 183.009 183.653 Ch.=160342.055m
Lvl.=183.614m
160360 182.762 183.252
L=50.000m
160380 182.346 182.849
L=30.000
160420 181.275 182.044
e=3.6
e=3.6
160460 180.674 181.238
R=-800.000m
VER 0
HOR 0
SCALE:-
160500 180.054 180.432 Ch.=160500.409m
Lvl.=180.424m
m L=58.779m L=30.000m
25
2.5
160520 179.798 180.073
50
5.0
1:2500 @ A2 SHEET
160540 179.623 179.807
L=60.000m
R=4351.810m
Date
160580 179.088 179.504
e=2.5
Checked by
Prepared by
Designed by
Approved by
160600 178.965 179.377
Dec 2014
160640 178.561 179.123
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Description
L=160.000m
R=7537.880m
TITLE :
R=-530.000m
DRG. NO. :
Ch.=161992.636m
Pipe Culvert Span 1X5.0X1.5
FRL at PCL
Lvl.=186.035m
Chainage 161+145
Ch.=161765.881m
EGL / ERL at PCL
Ch.=161705.881m
Span 1X1.2
Lvl.=184.081m
Lvl.=183.731m
Ch.=161167.666m
Lvl.=182.097m
Ch.=161007.666m
Lvl.=180.664m
Datum(m) = 176
179.404 180.550
179.724 180.842
180.036 181.107
180.565 181.341
180.824 181.547
180.992 181.722
181.129 181.868
181.176 181.985
181.188 182.072
181.260 182.134
181.333 182.195
181.272 182.256
181.233 182.317
181.276 182.377
181.304 182.438
181.315 182.499
181.401 182.560
181.620 182.620
181.887 182.681
182.073 182.742
182.110 182.803
182.066 182.863
182.004 182.924
181.951 182.985
181.921 183.046
181.875 183.106
181.855 183.167
181.840 183.228
181.713 183.288
181.511 183.349
181.108 183.410
181.277 183.471
181.510 183.531
181.742 183.592
181.966 183.653
182.187 183.714
182.348 183.784
182.713 183.889
183.042 184.032
183.340 184.203
183.654 184.375
183.867 184.548
184.075 184.720
184.282 184.892
184.456 185.065
184.528 185.237
184.602 185.409
184.630 185.582
184.583 185.754
184.513 185.926
184.489 186.096
FINISHED ROAD LEVEL (FRL) AT PCL (m)
161640.26
161675.26
161758.36
161793.36
WIDENING
w=5.3
e=5.4 e=6.3 e=7.0
e=2.5 e=2.5
SUPERELEVATION (%)
e=5.4 e=6.3 e=7.0
161000
161020
161040
161060
161080
161100
161120
161140
161160
161180
161200
161220
161240
161260
161280
161300
161320
161340
161360
161380
161400
161420
161440
161460
161480
161500
161520
161540
161560
161580
161600
161620
161640
161660
161680
161700
161720
161740
161760
161780
161800
161820
161840
161860
161880
161900
161920
161940
161960
161980
162000
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:47pm yogesh
CLIENT:-
WIDENING
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 178
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
e=6.3
e=6.3
L=145.081m
162040
R=450.000m
184.534 186.324
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:47pm yogesh
162060 184.629 186.374
L=100.000m
R=-9389.126m
162080 184.740 186.382
Ch.=162092.636m
Lvl.=186.365m
CONSULTANT:-
162100 184.807 186.350
L=50.000m
162120 184.838 186.309
egisIndia
162160 184.972 186.228
PROJECT:-
162260 185.271 186.025
VER 0
HOR 0
SCALE:-
162500 184.430 185.537
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
162540 184.431 185.455
Date
162580 184.414 185.374
FRL at PCL
Checked by
Prepared by
Designed by
Approved by
162600 184.490 185.334
EGL / ERL at PCL
Dec 2014
162640 184.677 185.252
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
R0
Rev.
Date
L=40.843m
Dec 2014
R=-400.000m
Ch.=162795.428m
Span
Description
R=9180.952m
Ch.=162855.428m
Lvl.=185.010m
1 X 1.2
DRG. NO. :
L=177.211m
Ch.=163005.286m
R=-10824.381m
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 178
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L
R=-10824.381m G
Ch.=163014.990m
163020 184.823 185.505 Lvl.=185.509m
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:47pm yogesh
e=7.0
e=7.0
L=27.730m
L=60.000m
163060 184.777 185.541
Ch.=163074.990m
163080 184.878 185.605 Lvl.=185.587m
CONSULTANT:-
163100 184.938 185.678
R=12803.617m G=0.365
L=53.183m
163120 185.015 185.751
Ch.=163128.173m
Lvl.=185.781m
163140 185.130 185.823
egisIndia
163160 185.305 185.889
L=145.987m
163200 185.418 186.003
PROJECT:-
163260 185.558 186.127
L=300.000m
163300 185.590 186.178
R=-64450.963m
163320 185.614 186.195
FRL at PCL
L=210.169m
163380 185.630 186.207
R=-10000.000m
Ch.=163465.000m
Lvl.=186.139m
163480 185.513 186.136
VER 0
HOR 0
SCALE:-
163500 185.523 186.169
e=2.5
25
2.5
e=2.5
50
5.0
1:2500 @ A2 SHEET
163540 185.677 186.348
R=9505.623m G=0.530
Ch.=163553.509m
L=60.000m L=28.509m
Date
163580 185.966 186.539
L=60.000m
Checked by
Prepared by
Designed by
Approved by
163600 185.970 186.601
R=-16546.420m
Ch.=163613.509m
Lvl.=186.629m
L=278.931m
Dec 2014
163640 185.938 186.673
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Description
e=5.7
e=5.7
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 180
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:48pm yogesh
Span
164060 186.555 187.378 Ch.=164065.000m
Chainage
Lvl.=187.386m
164080 186.666 187.408
Pipe Culvert
CONSULTANT:-
164100 186.651 187.427
1X1.2
L=60.000m
164+055
164120 186.507 187.434 Ch.=164125.000m
R=-34406.876m
Lvl.=187.435m
164140 186.348 187.434
egisIndia
Span
164160 186.250 187.432 Chainage
L=207.557m
164180 186.187 187.431
R=-3000.000m
Pipe Culvert
PROJECT:-
164260 186.328 187.426
L=120.781m
164340 186.383 187.420
VER 0
HOR 0
SCALE:-
164500 186.759 187.410
25
2.5
L=231.626m
e=2.5
50
5.0
1:2500 @ A2 SHEET
164540 186.796 187.407
FRL at PCL
Date
EGL / ERL at PCL
Checked by
Prepared by
Designed by
Approved by
164600 186.724 187.403
Dec 2014
164640 186.680 187.400
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
Ch.=164733.253m
Dec 2014
Lvl.=187.460m
L=213.944m
164820 164831.95
187.025 187.646
FOR TENDER PURPOSE
L=75.000m
DRG. NO. :
e=6.3
e=6.3
Lvl.=187.930m
L=82.889m
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 178
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
R=-18446.724m
Lvl.=187.961m
165020 187.170 187.953
L=75.000m
165040 187.138 187.931
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:48pm yogesh
165060 165064.84
187.128 187.908
G=-0.111
CONSULTANT:-
165100 187.187 187.864
L=54.110m
L=152.867m
165113.85
165120 187.255 187.842
egisIndia
165160 187.319 187.798 Ch.=165165.096m
Span
Lvl.=187.792m
L=90.000m
Chainage
L=60.000m
e=4.0
e=4.0
165220 187.337 187.850
R=12716.981m
Ch.=165225.096m
1x2x2
w=5.3
w=5.3
Lvl.=187.867m
165+195
L=28.630m
R=240.000m
165240 187.436 187.921
PROJECT:-
165260 187.536 187.993
L=90.000m
165300 187.680 188.138
G=0.361
165320 187.774 188.210
165322.48
L=174.904m
165340 187.833 188.282
Ch.=165460.000m
165460 188.195 188.768 Lvl.=188.768m
L=266.519m
VER 0
HOR 0
SCALE:-
165500 188.287 188.982
25
2.5
e=2.5
50
5.0
L=118.920m
1:2500 @ A2 SHEET
165540 188.581 189.196
Date
165580 188.702 189.411 Lvl.=189.405m
Checked by
Prepared by
Designed by
Approved by
165600 188.762 189.509
Dec 2014
165640 188.945 189.657
Rajeev Gupta
Sanjay Kumar
L=100.000m
Maninder Vashisth
Balkeshwar Mishra
R=-24682.540m
Rev.
TITLE :
DRG. NO. :
CHAINAGE (m)
VERTICAL PROFILE
Datum(m) = 186
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:48pm yogesh
166060 189.461 190.237
e=2.5
CONSULTANT:-
166100 189.429 190.289
egisIndia
Lvl.=190.347m
166160 189.492 190.365
L=60.000m
166200 189.565 190.386 Ch.=166204.545m
R=-45889.403m
Lvl.=190.386m
L=50.000m
166220 189.524 190.386
PROJECT:-
166260 189.605 190.386
e=4.4
e=4.4
FRL at PCL
L=142.385m
166320 189.655 190.386
R=1000.000m
EGL / ERL at PCL
L=50.000m
166420 189.716 190.386
VER 0
HOR 0
SCALE:-
166500 189.682 190.386
25
2.5
166520 189.691 190.386
50
5.0
1:2500 @ A2 SHEET
166540 189.686 190.386
G=0.000
L=661.356m
L=233.604m
Date
166580 189.789 190.386
Checked by
Prepared by
Designed by
Approved by
166600 189.776 190.386
Dec 2014
166640 189.752 190.386
Rajeev Gupta
Sanjay Kumar
Maninder Vashisth
Balkeshwar Mishra
e=2.5
R=-7000.000m
DRG. NO. :
Ch.=166925.901m
Chainage
Lvl.=190.540m
166940 190.161 190.611
Box Culvert
L=28.030m
L=179.747m
Pipe Culvert
FRL at PCL Chainage 167+371
EGL / ERL at PCL
Span 1X1.2
END OF
Ch.=167105.648m
Ch.=167255.648m
Ch.=167540.144m
Ch.=167309.861m
Ch.=167459.861m
PROJECT ROAD
Lvl.=191.457m
Lvl.=191.388m
Lvl.=191.172m
Lvl.=191.062m
Lvl.=190.881m
Datum(m) = 186
190.417 190.918
190.636 191.020
190.850 191.122
191.014 191.224
191.124 191.326
191.194 191.428
191.275 191.522
191.418 191.588
191.417 191.625
191.344 191.631
191.339 191.608
191.303 191.556
191.210 191.473
191.134 191.362
190.810 191.241
190.617 191.121
190.525 191.004
190.445 190.909
190.322 190.840
190.204 190.797
190.309 190.780
190.441 190.788
190.501 190.822
190.519 190.882
190.535 190.954
190.582 191.026
190.793 191.099
191.170 191.171
191.172 191.172
FINISHED ROAD LEVEL (FRL) AT PCL (m)
WIDENING
e=2.5
SUPERELEVATION (%)
167540.144
167000
167020
167040
167060
167080
167100
167120
167140
167160
167180
167200
167220
167240
167260
167280
167300
167320
167340
167360
167380
167400
167420
167440
167460
167480
167500
167520
167540
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\28.11.14 2.Garautha-Chirgaon Section of SH-42\4.Plan & Profile Garautha-Chirgaon Section of SH-42\ P&P LAYOUT.dwg Dec 30, 2014 - 2:49pm yogesh
Major Junction Improvement
SIDE RO
AD AHEA
DIRE
IN RO
D
IN L
CT
O
MAN
C
ION S
AL LAN
(ENG
GUAG
IGN
LISH
E
)
FOOTP
ATH
FOOTP
ATH
STOP
R1
FOOTPAT
2.
H
.0 2
EAD
R1
M
1200 M T
ULVER
PIPE C
OAD AH
SIDE R
0
11870
118900
118800
D
MAJOR ROAD AHEA
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 118+756
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 001
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
INTERSECTIO
N
STAGGERED
DIRECTION SIGN
INTERSECTION
STAGGERED
1200 MM
PIPE CULVERT
R1
0.
0
0.
0
R1
R8.0
0
0.
R1
INTERSECTION
STAGGERED
1200 MM
PIPE CULVERT
124300
124200
124100
ED
A G GER ION
S T T
RSEC
INTE
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 124+220
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 002
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
MAJOR ROAD AHEAD
XXX
XXX
DIRECTION SIGN
SIDE ROAD AHEAD
1200 MM
PIPE CULVERT
R8
.0
.0
R4
125600
125500
125400
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 125+500
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 003
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
SIDE
R O AD
DIREC
AHEA
IN RO
IN LO
TION
MAN (E
CAL LA
D
NGLISH
NGUA
SIGN
GE
)
D AHEAD
SIDE ROA
0
R1
0.
R1
0.
0
1200 MM
E
ATI VILLAG
PIPE CULVERT
126300
126200
TO LAKHAW
126100
MAJOR RO
AD AHEAD
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 126+160
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 004
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
AHEAD
ROAD
CROSS
130400
0
0.
R1
0
0.
R1
.0
R5
0.0
AHEAD
2
1200 MM R1 .0
R5
PIPE CULVERT
CROSS ROAD
1200 MM
PIPE CULVERT
130700
12 PE C
PI
00 U
130600
MM LVE
E
AI VILLAG
TO GARV
130500
RT
TY
CI
H CITY
H
RC
EA
TO EARC
TO
MA
JO
R
RO
AD
MAJOR RO AH
AD AHEAD EA
D
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 130+480 & 130+610
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 005
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
D
EA
AH
AD
RO
OR
AJ
RT
M
E
ULV
C
E P
PI
M
M
0
20 1
R15.
0
R15.0
SI
D E
RO
AD
AH
EA
D 00
09
D
13
A
AHE
AD
E RO
SID
0 0
8
Note:
0
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 130+900
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 006
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
EAD
AH D
OA R
JOR
MA
SIGN
ION
GE
CT
DIRE
NCE
ILLA
XXX
DIRECTION SIGN
HI V
XXX
XXX
XXX
BAC
TO
PIPE CULVERT 1200 MM
.0 0
R5
R1
.0
D
SIDE ROAD AHEA
DIRECTION SIGN
IN ROMAN (ENGLISH)
IN LOCAL LANGUAGE
134600
134700
134800
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 134+700
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 007
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
SIDE ROAD AHEAD
R1
0.
0
2.0
R1
138900
138800
138700
MA
JOR
ROA
DA
HEA
D
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 138+792
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 008
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
GE
VILLA
KAR
D
AHEA
HADO
AD
R RO
MAJO
TO B
N SIGN
DIRECTIO
ADVANCE
XXX
LVERT
XXX
PIPE CU
DIRECTION SIGN
SIDE ROAD
XXX
XXX
1200 MM
AHEAD
8.0
R5
.0
DIRECTION SIGN
141100
141200
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 141+110
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 009
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:22pm maninder.v
SIDE ROAD AHEAD
R5
.0
.0
146200
146100
MAJ
OR
ROA
DA
HEA
D
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 146+100
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 010
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:23pm maninder.v
STA
GGE
RED
INT
ERS
ECT
ION
TO MOT VILLAGE
DIRECTION SIGN
STAGGERED INTERSECTION
1200 MM
PIPE CULVERT
R1
2.
0
2.
0
R1
SECTION
R1
.0
5.
5
0
R1
STAGGERED INTER
146600
146700
146800
TION
RSEC
INTE
RED
STAGGE
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 146+666
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 011
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:23pm maninder.v
D
EA
AH
AD
RO
GN
OR
SI
DIRECTION SIGN
AJ
ADVANCE DIRECTION SIGN
M
IO
E CT
IR D
X
E
XX
C
AN
DV
XXX
XXX
X
XX
A
SIDE ROAD AHEAD
1200 MM
PIPE CULVERT
R15.0
R4.
0
DIRECTION SIG
UAGE
IN ROMAN (ENG
IN LOCAL LANG
150500
150400
150300
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 150+380
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 012
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:23pm maninder.v
D EA
D AH A
R RO O
MAJ
DIRECTION SIGN
1200 M
M
PIPE CU
LVERT
CROSS ROAD
R7
.0
5.0
R1
AHEAD
HEAD
ROAD A
.0
CROSS
R7
R7.0
MM
N
IN LOCA (ENGLISH)
1200 ULVERT
ION SIG
UAGE
C
PIPE
L LANG
AN
DIRECT
IN ROM
152600
152400
D
D AHEA
R ROA
MAJO
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 152+510
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 013
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:23pm maninder.v
D
AHEA
ROAD R
MAJO
DIRECTION SIGN
CROSS ROAD AHEAD 1200 MM
PIPE CULVERT
R1
2.0
0.0
R1
R7
.0
IN ROMAN (ENGLISH)
DIRECTION SIGN
IN LOCAL LANGUAGE
157500
157600
157700
MA
JOR
RO
AD
AH
EAD
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 157+580
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 014
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:23pm maninder.v
DIRECTION SIGN
7.5
CROSS ROAD
0.0
AHEAD
R3
5.5
5.5
5.5
5.5
5.5
FOOTPATH CUM DRAIN 5.5
R3
0.
0
167400
167500
Note:
1. All dimensions are in millimetre
2. Markings of Stop line, diagonal marking, chevron marking (including road studs)
shall be as per Drg/ STD-008
3. Route directional arrows shal be as per Drg/ STD -008a
AD AHEAD
MAJOR RO 4. All road signs shall be as per Drg/STD-009, 09a and 09b
5. Road studs (RRPM) at Junctions shall be as per Drg/STD-013
6. Kerb details shall be as per Drg/STD-013
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
MAJOR JUNCTION IMPROVEMENT
Uttar Pradesh Core Road Network Designed by Sandeep Gautam
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE AT CHAINAGE : 176+540
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/MJI- 015
(Garautha - Chirgaon Section of SH42) Date Dec 2014
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\5.Majo Major Junctions.dwg Dec 30, 2014 - 4:23pm maninder.v
ROAD SIGN & MARKING PLAN
START OF
PROJECT ROAD
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 118+600 TO KM- 120+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:44pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 120+000 TO KM- 122+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:44pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 122+000 TO KM- 124+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:45pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-002
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 124+000 TO KM- 126+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:45pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-004
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 126+000 TO KM- 128+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:45pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 128+000 TO KM- 130+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:45pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-006
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 130+000 TO KM- 132+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:45pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 132+000 TO KM- 134+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:45pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-007
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 134+000 TO KM- 136+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:46pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 136+000 TO KM- 138+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:46pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-008
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 138+000 TO KM- 140+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:46pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-009
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 140+000 TO KM- 142+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:46pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 142+000 TO KM- 144+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:46pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 144+000 TO KM- 146+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:46pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-011
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 146+000 TO KM- 148+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:47pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 148+000 TO KM- 150+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:47pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-012
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 150+000 TO KM- 152+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:47pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-013
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 152+000 TO KM- 154+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:47pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 154+000 TO KM- 156+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:47pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-014
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 156+000 TO KM- 158+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:47pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 158+000 TO KM- 160+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:48pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 160+000 TO KM- 162+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:48pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 162+000 TO KM- 164+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:48pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 164+000 TO KM- 166+000
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:48pm maninder.v
JUNCTION IMPROVEMENT For
Detailed Ref.Drg No.=
EGIS/DPR/EIRH1UP020/DPR/MJI-015
END OF
PROJECT ROAD
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra ROAD SIGNS & MARKING PLAN
HOR 0 25 50 Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 166+000 TO KM- 167+539
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\ROAD S TRSP LAYOUT.dwg Dec 30, 2014 - 4:48pm maninder.v
DRAINAGE PLAN AND
LONGITUDINAL PROFILE
CLIENT:-
CHAINAGE (m)
Datum(m) = 168
G=-0.038
G=-0.038
D:\Egis Work\Uttar Pradesh\DRAINAGE PLAN & PROFILE\Final Drain\Drain Plan & Profile Garautha-Chirgaon Section of SH-42\TENDER PURPO Drain P&P LAYOUT.dwg Dec 30, 2014 - 12:43pm yogesh
L=211.000m
L=211.000m
129560 174.383 174.795
FRL at PCL
CONSULTANT:-
IL of LHS Drain
IL of RHS Drain
129580 174.369 174.814
Span
egisIndia
129620 174.266 174.854
Chainage
129640 173.748 173.748 174.349 174.873
Box Culvert
129660 174.325 174.893
172.600
129+641
1X2.0X1.5
129680 174.351 174.913
G=-0.286
G=-0.286
Lvl.=174.934m
PROJECT:-
L=109.000m
L=109.000m
129720 174.613 174.981
G=-1.014
G=-1.261
L=137.000m
L=137.000m
129840 175.130 176.208
IL
Ch.=129857.094m
Span
Ch.=129917.094m
1X1.2
Lvl.=176.755m
129+887
VER 0
HOR 0
129960 175.873 176.763
SCALE:-
129980 176.038 176.767
25
G=-0.292
2.5
G=-0.119
Ch.=129991.037m
L=195.000m
L=195.000m
Lvl.=176.769m
130000 176.216 176.774
50
5.0
1:2500 @ A2 SHEET
130020 176.377 176.817
Date
Lvl.=176.962m
130060 176.603 177.018
Checked by
Prepared by
Designed by
Approved by
130080 176.019 176.019 176.764 177.144
IL
Span
Dec 2014
Chainage
Rajeev Gupta
Sanjay Kumar
Seema Kumar
130120 176.927 177.394
R0
130+082
1X1.5X1.5
Rev.
G=-0.581
G=-0.581
IL of RHS Drain
EGL / ERL at PCL
L=418.000m
L=418.000m
178.331 178.331
Span
Chainage
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
DRAINAGE PLAN AND LONGITUDINAL PROFILE
Uttar Pradesh Core Road Network HOR 0 25 50
Designed by Seema Kumar
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE FROM KM- 130+600 TO KM- 131+750
VER 0 2.5 5.0
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Egis Work\Uttar Pradesh\DRAINAGE PLAN & PROFILE\Final Drain\Drain Plan & Profile Garautha-Chirgaon Section of SH-42\TENDER PURPO Drain P&P LAYOUT.dwg Dec 30, 2014 - 12:43pm yogesh
CLIENT:-
CHAINAGE (m)
Datum(m) = 166
L=109.000m
L=109.000m
130580 179.086 179.523
IL
178.331 178.331
Span
130620 178.962 179.366
G=0.670
130660 178.489 179.123 Ch.=130664.342m
Pipe Culvert
G=0.670
L=094.000m
Lvl.=179.091m
1X1.2
L=094.000m
177.600
130680 178.411 178.974
130+609
130700 177.701 177.701 178.358 178.826
IL
Span
130720 178.252 178.677
D:\Egis Work\Uttar Pradesh\DRAINAGE PLAN & PROFILE\Final Drain\Drain Plan & Profile Garautha-Chirgaon Section of SH-42\TENDER PURPO Drain P&P LAYOUT.dwg Dec 30, 2014 - 12:43pm yogesh
G=0.791
G=0.791
Chainage
130740 178.147 178.529
L=047.000m
L=047.000m
177.329 177.329
CONSULTANT:-
Ch.=130756.455m
130760 178.038 178.381 Lvl.=178.406m
Box Culvert
130780 177.889 178.259
175.500
130+703
1X3.0X2.0
egisIndia
130800 177.715 178.178
G=0.077
G=0.111
130840 177.526 178.136
L=157.000m
L=157.000m
Ch.=130856.455m
130860 177.431 178.175 Lvl.=178.165m
IL
Span
130880 177.373 178.227
Chainage
PROJECT:-
130900 177.432 178.279
177.208 177.154
130920 177.434 178.332
Box Culvert
176.130
G=-0.527
G=-0.247
130960 177.836 178.436
L=093.000m
L=093.000m
130980 177.898 178.488
G=0.123
G=-0.191
IL
L=100.000m
L=100.000m
Span
VER 0
HOR 0
1X1.5X1.5
SCALE:-
Ch.=131150.024m
G=0.452
Lvl.=178.525m
G=0.452
IL
L=100.000m
25
2.5
L=100.000m
Span
50
5.0
1:2500 @ A2 SHEET
131200 177.123 177.123 177.812 178.248
Slab Culvert
Date
G=0.381
1 X 1.5
G=0.472
177.600
131+247
Checked by
176.901 176.944
Prepared by
Designed by
Approved by
Lvl.=177.967m
131260 177.928 177.928
176.803 176.939
IL
G=0.028
G=0.544
Dec 2014
L=047.000m L=018.000m
L=047.000m L=018.000m
Rajeev Gupta
Chainage
Sanjay Kumar
Seema Kumar
131300 177.830 178.043
Ch.=131310.548m
Maninder Vashisth
Lvl.=178.149m
131320 177.719 178.259
Slab Culvert
R0
176.100
131+265
Rev.
Lvl.=180.457m
131520 179.940 180.578
L=485.000m
L=485.000m
TITLE :
Lvl.=183.614m
EGL / ERL at PCL
Lvl.=183.334m
IL of LHS Drain
Ch.=160505.409m
IL of RHS Drain
Ch.=160565.409m
Lvl.=180.424m
Lvl.=179.629m
Lvl.=176.877m
177.961 178.412
178.600 179.001
179.175 179.590
179.664 180.180
180.225 180.769
180.725 181.358
181.424 181.947
182.147 182.537
182.646 183.126
183.003 183.646
183.055 183.735
182.830 183.353
182.490 182.950
181.927 182.547
181.406 182.144
181.032 181.741
180.741 181.339
180.457 180.936
180.118 180.533
179.862 180.154
179.668 179.865
179.461 179.667
179.137 179.536
178.860 179.282
178.622 179.155
FINISHED ROAD LEVEL (FRL) AT PCL (m)
G=-2.573 G=1.563
DRAIN GRADIENT (LHS) L=280.000m
L=220.000m
G=-2.750 G=1.702
DRAIN GRADIENT (RHS) L=220.000m
L=220.000m
160080
160100
160120
160140
160160
160180
160200
160220
160240
160260
160280
160300
160320
160340
160360
160380
160400
160420
160440
160460
160480
160500
160520
160540
160560
160580
160600
160620
160640
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\DRAINAGE PLAN & PROFILE\Final Drain\Drain Plan & Profile Garautha-Chirgaon Section of SH-42\TENDER PURPO Drain P&P LAYOUT.dwg Dec 30, 2014 - 12:43pm yogesh
Box Culvert
Chainage 165+200
Span 1x2x2 FRL at PCL
EGL / ERL at PCL
IL 184.980
IL of LHS Drain
Ch.=165522.253m
IL of RHS Drain
Ch.=165230.096m
Ch.=165170.096m
Lvl.=188.922m
Lvl.=187.867m
Lvl.=187.792m
Datum(m) = 178
187.307 187.803
187.359 187.785
187.328 187.835
187.397 187.903
187.517 187.975
187.600 188.047
187.662 188.120
187.752 188.192
187.821 188.264
187.857 188.336
187.879 188.409
188.031 188.481
188.132 188.553
188.162 188.625
188.181 188.698
188.215 188.770
188.403 188.914
188.545 188.985
188.638 189.054
188.681 189.121
188.741 189.185
188.851 189.247
188.930 189.306
188.988 189.363
189.073 189.418
189.082 189.470
189.088 189.520
189.139 189.567
189.209 189.612
189.281 189.655
FINISHED ROAD LEVEL (FRL) AT PCL (m)
188.923 188.656
187.175 187.013
G=-0.469 G=-0.376
DRAIN GRADIENT (LHS) G=-0.191 L=250.000m
L=150.000m
L=150.000m
165180
165200
165220
165240
165260
165280
165300
165320
165340
165360
165380
165400
165420
165440
165460
165480
165500
165520
165540
165560
165580
165600
165620
165640
165660
165680
165700
165720
165740
165760
165780
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\DRAINAGE PLAN & PROFILE\Final Drain\Drain Plan & Profile Garautha-Chirgaon Section of SH-42\TENDER PURPO Drain P&P LAYOUT.dwg Dec 30, 2014 - 12:44pm yogesh
END OF
PROJECT ROAD
Box Culvert
FRL at PCL Pipe Culvert
Chainage 166+950
EGL / ERL at PCL
END OF
Chainage 167+376
Span 1X1.5X1.5 IL of LHS Drain PROJECT ROAD
IL of RHS Drain Span 1X1.2
IL 188.450
Ch.=167110.648m
Ch.=167260.648m
Ch.=167540.348m
Ch.=167314.861m
IL 188.900
Ch.=167464.861m
Ch.=166930.901m
Lvl.=191.457m
Lvl.=191.388m
Lvl.=191.172m
Lvl.=191.062m
Lvl.=190.890m
Lvl.=190.540m
Datum(m) = 186
190.089 190.422
190.094 190.489
190.152 190.586
190.212 190.688
190.299 190.790
190.387 190.892
190.555 190.994
190.808 191.096
190.971 191.198
191.100 191.300
191.180 191.402
191.239 191.501
191.385 191.575
191.415 191.618
191.348 191.617
191.329 191.571
191.230 191.497
191.149 191.392
190.901 191.271
190.638 191.151
190.545 191.031
190.467 190.931
190.356 190.856
190.196 190.807
190.269 190.785
190.430 190.788
190.488 190.817
190.516 190.873
190.531 190.946
190.566 191.021
190.664 191.096
189.660 189.660 191.164 191.170
191.172 191.172
FINISHED ROAD LEVEL (FRL) AT PCL (m)
189.611 189.611
189.410 189.410
189.312 189.312
167539.819
166900
166920
166940
166960
166980
167000
167020
167040
167060
167080
167100
167120
167140
167160
167180
167200
167220
167240
167260
167280
167300
167320
167340
167360
167380
167400
167420
167440
167460
167480
167500
167520
167540
CHAINAGE (m)
D:\Egis Work\Uttar Pradesh\DRAINAGE PLAN & PROFILE\Final Drain\Drain Plan & Profile Garautha-Chirgaon Section of SH-42\TENDER PURPO Drain P&P LAYOUT.dwg Dec 30, 2014 - 12:44pm yogesh
Standard Drawings
A B C D E F G H
A B C D E F G H
ATTAINMENT OF SUPERELEVATION
SECTION AT A-A & H-H (NORMAL CAMBER) SECTION AT C-C & F-F (SUPERELEVATED TO CAMBER)
SECTION AT B-B & G-G (ADVERSE CAMBER REMOVED) SECTION AT D-D & E-E (FULL SUPERELEVATION ACHIEVED)
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 001super elevation.dwg Dec 30, 2014 - 2:59pm indu
PEDESTRIAN CROSSING B
15000 55000 15000 35000
BUS STOP 100m AHEAD
5500 PASSENGER SHELTER 1.0 m EARTHEN SHOULDER
1.5 m PAVED SHOULDER
BUSBAY 3500
SHOULDER
FOOTPATH
SHOULDER
MARKING
EARTHEN
PAVED
RAISED
2.5 % 2.5 %
3.0 %
DBM DBM
WMM II WMM II
WMM I WMM I
GSB GSB
SUBGRADE SUBGRADE
SECTION B-B
Note:
1. All dimensions are in meters unless otherwise mentioned.
2. Bus bay location as per site condition.
3. Additionally,Paver Blocks to be Provided in maximum 100m
length on either side in School Bus Bay areas.
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 002 Bus Bay.dwg Dec 30, 2014 - 2:59pm indu
F1 F1
C1 PB1(230X400)
B1(230X450)
PB2(230X400)
PB2(230X400)
B2(230X450)
B2(230X450)
SLAB 10THK.
F1
F1
C1 PB1(230X400)
B1(230X450)
SECTION X-X
(SCALE - 1:50)
SECTION A-A
(SCALE - 1:25)
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 002a BUS SHELTER.dwg Dec 30, 2014 - 3:00pm indu
TOILET BLOCK
1.0M RAISED FOOTPATH WITH PVC PIPE 150 MM REFER TO DRG NO.
DIA AT 5 M INTERVAL FOR DRAINAGE EGIS/DPR/EIRH1UP020/DPR/STD-03a-03b
B
100.0 70.0 200.0 70.0 100.0
TRUCK LAYOUT
SIGN VIDE IRC:67 2012 1.0
1.0 M EARTHEN SHOULDER 1.0 M EARTHEN SHOULDER
1.5 M PAVED SHOULDER TRUCK LAYBYE 7.0 1.5 M PAVED SHOULDER
1.0
0.5
7.0 M CARRIAGEWAY 7.0 7.0
M20
2.5%
1.0 7.0 1.0 0.5 7.0 1.5 1.0
SHOULDER
BC
FOOTPATH
TRUCK LAYBYE CARRIAGEWAY
SEPARATOR
SHOULDER
DBM
EARTHEN
RAISED
PAVED
WMM
GSB
SUBGRADE
DETAIL AT "A"
PAVER BLOCK (M-50) 100mm
SEND BEDDING 30mm BC
WMM II 125mm DBM
DETAIL AT "A" WMM I 125mm WMM II
GSB 250mm (or to match existing profile) WMM I
SUBGRADE 500mm GSB
SUBGRADE
SECTION B-B
NOTE:
1. All dimensions are in meter unless otherwise mentioned
2. Truck lay byes location as per site condition
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 003 Layout of Typical Truck Laybye.dwg Dec 30, 2014 - 3:00pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE : TRUCK LAYBYE TOILET
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description
BLOCKPLAN,SECTION,ELEVATION &
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE SCHEDULE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 03a
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 003a Truck laybye Toilet Block.dwg Dec 30, 2014 - 3:01pm indu
EARTH FILLING
15cm
G.L G.L
COARSE SAND
X X
10 10
20cm cm 40cm cm 20cm
100cm
SECTIONAL PLAN
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 003b Toilet Block Plumbing Details.dwg Dec 30, 2014 - 3:01pm indu
Steel Spacer Block (150x75x5 81
Channel Section)
27
50
180
260
NEUTRAL AXIS
50 R24
81
R2
4
312
1800 14
39
Steel Post (150x75x5)
Channel Section
TRAFFIC FACE
POST
81 75
736
100 100 50
51 108 108 51 51 108 108
95
312
312 95
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 004
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 004.Crash barrier end treatment (1).dwg Dec 30, 2014 - 3:01pm indu
TRAFFIC DIRECTION
PLAN
ELEVATION ELEVATION
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 004a
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 004a.Crash barrier end treatment (2).dwg Dec 30, 2014 - 3:02pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
DETAILS OF METAL BEAM CRASH BARRIER
Rev. Date Description
Government of Uttar Pradesh (W-BEAM)-I
egisIndia Development Program (UPCRNDP) N.T.S
Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 004b
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 004b.Crash barrier end treatment (3).dwg Dec 30, 2014 - 3:02pm indu
ROADWAY DELINEATOR SPACING ON CURVES
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 005.Safety Devices final.dwg Dec 30, 2014 - 3:02pm indu
RB RB
FRONT ELEVATION
SECTION AT A-A
PLAN
TYPE DESIGN WITH
RCC AS MATERIAL
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 006 boundary stone final.dwg Dec 30, 2014 - 3:03pm indu
FACE - 1 FACE - 2
SIDE ELEVATION
FACE - 1 FACE - 2
TYPE DESIGN FOR THE ORDINARY
SIDE ELEVATION
KILOMENTRE STONE
SECTIONAL PLAN
SECTIONAL PLAN
PLAN
SCHEDULE OF REINFORCEMENT
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 007 kilometer stone final.dwg Dec 30, 2014 - 3:03pm indu
STOP LINE YIELD LINE
Notes:
DOUBLE LINE AND HATCHED MARKINGS ON SHARP CURVE CONTINUE AS CENTRE LINE
(LESS THAN 100M) AND IN TRAFFIC CALMING ZONE
FIG-A FIG-B
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description DETAILS OF ROAD MARKINGS-I
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 008
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\8-9\ 008 Road Marking-1.dwg Dec 30, 2014 - 3:03pm indu
LANE MARKING-RM 01
LANE MARKING-RM 02
CENTER LINE MARKING
NO OVERTAKING LINE
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\8-9\ 008a Road Marking-2.dwg Dec 30, 2014 - 3:03pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description DETAILS OF ROAD SIGNS-I
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 009
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\8-9\ 009 Road Signs-I.dwg Dec 30, 2014 - 3:04pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description DETAILS OF ROAD SIGNS-II
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 009a
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\8-9\ 009a Road Signs-II.dwg Dec 30, 2014 - 3:04pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description DETAILS OF ROAD SIGNS-III
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 009b
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\8-9\ 009b Road Signs-III.dwg Dec 30, 2014 - 3:04pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description
GANTRY MOUNTED OVER HEAD TRAFFIC SIGNS
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 010
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 010 Gantry Mounted Overhead Traffic Signs final.dwg Dec 30, 2014 - 3:05pm indu
vkcknh {ks=
TABLE TOP LONGITUDINAL SECTION (WITHIN BUILT-UP AREAS)
lqjf{kr pyus
DETAIL AT "A"
CROSS SECTION AT A-A /khjs pyks ds fy, /kU;okn
AD-2 FRONT SIGN AD-3 BACK SIGN
150
200
50 50
100
/khjs pyks
M-15(PCC)
250
CROSS SECTION AT C-C
DETAIL AT "A" AD-1 FRONT SIGN
BACK SIGN
FRONT SIGN FRONT SIGN BACK SIGN BACK SIGN FRONT SIGN FRONT SIGN
ds fy, /kU;okn
ds fy, /kU;okn
/khjs pyks
lqjf{kr pyus
lqjf{kr pyus
vkcknh {ks=
vkcknh {ks=
/khjs pyks
/khjs pyks
/khjs pyks
VILLAGE / BUILT-UP AREA
20.0 20.0
ROAD STUDS
ROAD STUDS @4m c/c
@0.5m c/c
A RAISED FOOTPATH B C
ds fy, /kU;okn
ds fy, /kU;okn
/khjs pyks
lqjf{kr pyus
lqjf{kr pyus
vkcknh {ks=
vkcknh {ks=
/khjs pyks
/khjs pyks
/khjs pyks
BACK SIGN
BACK SIGN
FRONT SIGN FRONT SIGN BACK SIGN BACK SIGN FRONT SIGN FRONT SIGN
AD-1 AD-2 AD-3 AD-4
TYPICAL TRAFFIC CALMING IN BUILT-UP AREAS.
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\2.Garautha-Chirgaon Section of SH-42\3.FOR TENDER PURPOSE\8.STAN 011 Typical Traffic Calming in Buil-Up Areas.dwg Dec 30, 2014 - 3:18pm maninder.v
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by Maninder Vashisth
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by Balkeshwar Mishra
Rev. Date Description
SCHEDULE OF TRAFFIC CALMING AREAS
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) Checked by Sanjay Kumar R0 Dec 2014 FOR TENDER PURPOSE
N.T.S
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 011a
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 011a Schedule of Traffic Calming Areas.dwg Dec 30, 2014 - 3:05pm indu
A
A
STOP
STOP
A
A
JUNCTION WITH CROSS ROAD
JUNCTION WITH SKEW CROSSING
SIDE ROAD AHEAD
STOP
STOP
SIDE ROAD AHEAD
A
A
T - JUNCTION Y - JUNCTION
10M (MIN)
CL
NEW EDGE OF PAVEMENT OF HWY
GRADE B/W 0.5% TO 2%
B VARIES
PREMIX CARPET 2.5 % 2.5 %
ACCESS ROAD FORMATION WMM / GSB 2 2
1 1
TO BE ADJU H=MINI.300
ST WITH EX
ISTING GR
ADE EXISTING ACCESS
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 012 Typical Layout for Minor Intersection final.dwg Dec 30, 2014 - 3:06pm indu
M20
1.5 1.0
1.0 1.5
VARIES
2.5%
BC
DBM
WMM
GSB
SUBGRADE
TRANSVERSE SECTION
Earthen Shoulder
LONGITUDINAL SECTION
STOP
STOP
LONGITUDINAL SECTION
SHOULDER SHOULDER
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/STD- 013
(Garautha - Chirgaon Section of SH42) Date Dec 2014
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 013 Rumble strip & Pedestrian Crossing final.dwg Dec 30, 2014 - 3:06pm indu
SCHEDULE FOR USE OF FLY ASH
Design Chainage (Km)
Start End
125.740 125.860
125.900 126.120
155.560 155.690
SHOULDER
SHOULDER
EARTHEN
EARTHEN
SHOULDER SHOULDER
CL
FLY ASH
EXISTING FORMATION
1.0m 1.0m
FLY ASH FLY ASH
EARTH COVER EARTH COVER
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 014 Tpical Cross Section with Fly Ash final.dwg Dec 30, 2014 - 3:07pm indu
C
B
A IL- B
D ET
B
C A VIEW B-B(SIDE VIEW OF BASIN)
A
DETAIL-A
SECTION C-C
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\ 015 Chute Drain final.dwg Dec 30, 2014 - 3:07pm indu
C D
D
PLAN E
C TYPICAL SECTIONAL ELEVATION AT CROSS
ROAD LOCATION AND ACCESS TO PROPERTIES
SECTION D-D
SECTION C-C SECTION E-E
G G
F F
Public Works Department Part-A: Project Preparation Approved by SANJEEV VERMA DRG. NO. :
EGIS/DPR/EIRH1UP020/STD- 016
(Garautha - Chirgaon Section of SH42) Date Dec 2014 (SH. 1 OF 3)
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\016 DRAIN\ 016 & 016a EGIS-DPR-EIRH1UP020-DRAIN FINAL.dwg Dec 30, 2014 - 3:08pm indu
C D
D
PLAN
C
F F
SECTION C-C
SECTION D-D
SECTION F-F
Public Works Department Part-A: Project Preparation Approved by SANJEEV VERMA DRG. NO. :
EGIS/DPR/EIRH1UP020/STD- 016a
(Garautha - Chirgaon Section of SH42) Date Dec 2014 (SH. 2 OF 3)
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\016 DRAIN\ 016 & 016a EGIS-DPR-EIRH1UP020-DRAIN FINAL.dwg Dec 30, 2014 - 3:08pm indu
CLIENT:- CONSULTANT:- PROJECT:- SCALE:- Prepared by PURNA CHANDARJI
Revisions TITLE :
Uttar Pradesh Core Road Network Designed by SUBBA RAO
Rev. Date Description
Government of Uttar Pradesh egisIndia Development Program (UPCRNDP) - Checked by T.J.REDDY R0 Dec 2014 FOR TENDER PURPOSE
Public Works Department Part-A: Project Preparation Approved by SANJEEV VERMA DRG. NO. :
EGIS/DPR/EIRH1UP020/STD- 016b
(Garautha - Chirgaon Section of SH42) Date Dec 2014 (SH. 3 OF 3)
C:\Users\indu\Desktop\8.STANDARD DRAWING Garautha-Chirgaon\016 DRAIN\ 016b EGIS-DPR-EIRH1UP020-DRAIN FINAL.dwg Dec 30, 2014 - 3:08pm indu
C A
B B
C A SECTION A-A
PLAN DETAIL 'A'
SECTION D-D
SECTION C-C
REINFORCEMENT DETAILS
SECTION B-B
B
1 2
A A
PLAN
PAVED
SHOULDER
EARTHEN
SHOULDER
3.0 %
2.5 %
2
1
BC
DBM
WMM II
WMM I
GSB
SUBGRADE