Request For Information: Subject: Release of On-Hold Structural Elements at GF
Request For Information: Subject: Release of On-Hold Structural Elements at GF
Request For Information: Subject: Release of On-Hold Structural Elements at GF
Project: Date.
IKEA-2 Jakarta Garden City 10 Sep 2019
To : Total Page.
PT. AECOM Indonesia
Distribution Details
Architectural Structural MEP Interior Landscape Other Urgency
Discipline x High (less than 2 days)
Response required by x Medium (4 days)
Review only, comment if Regular (6 days)
necessary
Document Reference Document Number
Tender drawing
IFC drawing
Site instruction
Site memo
Specification
Request for information
Request for approval JKTD17025-158.S/RFA-
SD/WP2/VIII/19
Contractor noted that Engineer has put ON-HOLD structural elements on Contractor’s shop drawing which was
submitted on RFA no. JKTD17025-158.S/RFA-SD/WP2/VIII/19 a month ago (dated 09 August 2019).
Contractor has now experience delay on shop drawing delivery performance. Contractor request the Engineer to
release all on-hold structural elements at GF and the next 1st Floor.
Release all on-hold Beam and Column with indicated type and remain as per latest IFC during the time
that the S.D. was created.
Provide information on all missing beam type IFC drawings to progress with the shop drawing
preparation and site coordination.
Signature : __________________________