Hello

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 24

Tracker NO Office NO

OMAXE LTD.
NAME OF PROJECT : OMAXE CITY - I, ROHTAK CONTRACT VALUE :

NATURE OF WORK : HT CABLES TERMINATION PROGRESS OF WORK:

NAME OF THE CONTRACTOR :- Shankar Electrical Engineers TIME SPEND: MONTHS

WORK ORDER NO. & DATE : JOB WORK DATE OF START:

R/A BILL NO. & DATE :- 1ST RA & 15.05.2019 COMPLETION PERIOD: N/A

PERIOD OF BILL : FROM 01.05.2019. TO 15.05.2019 GST No. :-

ERP CODE : PAN NO. :

DATE OF BILL RECEIVED AT H.O. :- DATE OF BILL CHECKING AT H.O. :-


CLAIMED BY
S.NO. PARTICULARS GROSS AMT. PREVIOUS AMT. THIS BILL AMT RAMARKS
CONTRACTOR

1 WORK DONE(CIVIL) 2000 2000

2 WORK DONE(ELECT/ PLUMBING)

3 DIFF. OF CEMENT

4 RATE DIFF OF TILES

TOTAL (A) 2000 2000

5 Add GST 18% On (A)

FREIGHT

TOTAL (B) 2000 2000

ADVANCES

6 Add Secured Advance

7 Add Mobilization Advance

TOTAL (C) 2000 2000

DEDUCTIONS

8 SECURITY @ 5 % (ON TOTAL A)

9 TDS @ 2% (ON TOTAL C-GST AMOUNT)

10 DPF.1% (ON TOTAL A)

11 DEBIT

12 HOLD

13 DEBIT FOR (ELECT. )

TOTAL DEDUCTION (C) 0 0

NET PAYABLE AMOUNT (D) 2000 2000

14 NOW PAYABLE

PREPAIRED BY : (Name & Ph No.)

PROJECT INCHARGE: (Name & Ph No.)

H.O. BILL MONITORING: (Name & Ph No.)

ASST.V.P/ SR. GM/ GM.: (Name & Ph No.)


BILL ABSTRACT
NAME OF PROJECT : OMAXE CITY - I, ROHTAK Name of Work - Shankar Electrical Engineers

WORK ORDER NO. & DATE : JOB WORK LAST R/A BILL NO. : N/A
NAME OF THE CONTRACTOR :- Shankar Electrical Engineers THIS R/A BILL NO. : I RA Job Work Bill & 15-05-19
PERIOD OF BILL : FROM 01.05.2019. TO 15.05.2019
*

THIS R/A UPTO LAST R/A


THIS
B/F CUM. AMOUNT QTY. AS
ITEM REF. FULL PART LAST R/A BILL EXECUTED %
DESCRIPTION UNIT FROM QTY. (8X9) PER Remarks
NO. M.B. RATE RATE BILL AMT. AMT.(11- OF QTY (8/14)
QTY. AB/PA QTY. (5+6) (8X10) AS BOQ
PAGE 12)
GE
NO.
NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16
WORK DONE

3Cx300Sq mm, HT CABLES


1
TERMINATION
Nos 2 2 1000 2000 0 2000

Total 2000 2000


Summery of M/S Irfan welding works

Sr. No. Villa No. Unit Previous Qty This Bill Qty.
S Irfan welding works

Cummulative
Remarks
Qty
Summery of M/S Rajesh Kumar

Sr. No. Villa No. Unit Previous Qty This Bill Qty.

Fabricating of Mumty Door

1 Villa No-4 to 9 Kg 0 288.66

2 Villa No-53 to 69 Kg 0 817.87

Fabricating of Staircase Railing

Villa No-60 & 61 Kg 0 145.16

Villa No-64 to 69 Kg 0 435.48

Fabricating of Entilo Glass Frame

Villa No-53 to 69 Kg 0 455.94

Fabricating of Holdfast for staircase


railing

100 Nos Kg 0 44

Fabricating of Main Gate


Villa No-55 to 57 Kg 0 288.39

Total 0 2475.5
M/S Rajesh Kumar

Cummulative
Remarks
Qty

288.66
MB No-8 Page
no-08

817.87
MB No-8 Page
no-08

145.16
MB No-8 Page
no-10

435.48
MB No-8 Page
no-10

455.94
MB No-8 Page
no-11(A)

44
MB No-8 Page
no-11(B)
288.39
MB No-8 Page
no-9

2475.5

You might also like