Customer : Pertamina

CEKLIST REPORT TOOL DST Field : Randu wangi


well : RWG-001
Test : DST#5
Date :

DIMENSI PRESSURE TEST VISUAL CHECK


NO TOOLS Lenght Od Id Pressure Time Remaks
Vis Check Rabbit
( Meter ) ( Inch ) ( Inch ) ( Psi ) (Mnt)
1 Slip Joint 6.080 5.00 2.25 7000
2 Rd.Circulating valve 1,,10 5.00 2.25 7000
3 Lprn 4.83 5.00 2.25 7000
4 External Carier 1.525 5.00 2.25 7000
5 Bigh John Jar 1.845 5.00 2.25 7000
6 Safety Joint 7" 1.080 6.00 2.25 2000
7 Champ Packer 7" 3.010 8.25 2.25 7000
8 Vertical Shock Absorber 1.080 5.00 2.25 -
Note : Ø OD sablon 1,25 " Inch

Dengan ini telah dilakukan hal tersebut diatas bersama team pertamina ep.
Dst Eng Res Eng Companyman