Tm-22 m35 RCC
Tm-22 m35 RCC
A) Design Stipulation:
1. Characteristic Compressive Strength (fck) : 35 N/mm2
2 Current Margin in M55 PSC : 12 N/mm2
3 Target Mean Strength for M55 Grade : 47 N/mm2
4 Maximum Size of Aggregate : 20 mm
5 Degree of Supervision : Good
6 Type of Exposure : Moderate
7 Maximum Cement Content : 500 Kg/m3
8 Minimum Cement Content : 400 Kg/m3
9 Maximum Water Cement Ratio : 0.45
10 Proposed Cement Contant : 370 Kg/m3
11 Proposed Microsilica Contant : 0 Kg/m3
12 Total Cementitoius : 370 Kg/m3
13 Proposed Water Cement Ratio : 0.405
14 Slump : 150 ± 25 mm
I Cement
1 Brand of Cement : Ambuja As per letter no. L/OCG
2 Type of Cement : OPC
3 Grade of Cement : 53 GRADE
4 Specific Gravity of Cement : 3.15
IIIAdmixture
MYK Hyyecrete PC 20
1 Brand of Admixture MYK ARMENT : As per letter no.
RD 1144-CP
2 Admixture Content : 1.20%
3 Specific Gravity of Admixture : 1.090
4 Weigth of Admixture 4.440 Kg.
Microsilica
1 of 19
1 Brand of Microsilica : MICROSILICA
2 Microsilica Content 0.00%
3 Specific Gravity of Microsilica 0.000
4 Weigth of Microsilica 0.00
:
1. Source KHERIBATTAR As per let
2. Physical Properties
Properties
Tests 20mm 10mm
Specific Gravity 2.64 2.63
Water Absorption 0.31% 0.41%
Aggregate Impact Value 16.23% 17.08%
Abrasion Value 22.32% 23.56%
Flakiness Index 9.89% 11.27%
Elongation Index 10.16% 12.35%
Crushing Value 18.43% 17.37%
3 Grading
a) Individual gradation of 20mm Aggregates
% Passing Required (As per IS 383:
Sieve Size in mm % of Passing (Average)
Table 7)
40 100.00 100
20 91.74 85-100
10 6.00 0-20
4.75 1.10 0-5
2 of 19
b) Individual gradation of 10mm Aggregates
% Passing Required (As per IS 383:
Sieve Size in mm % of Passing (Average)
Table 7)
12.5 100.00 100
10 90.91 85-100
4.75 10.60 0-20
2.36 2.77 0-5
257.1
4 of 19
4. All in Aggregate (Theoretical Blending)
% of Ingredients
Sieve Size Average % of passing % of
32.00% 26.00% 42.00%
in mm Passing
20 mm 10 mm Sand 20 mm 10 mm Sand
40 100 100 100 32.00 26.00 42.00 100
20 91.74 100 100 29.36 26.00 42.00 97.36
4.75 1.10 10.60 99.27 0.35 2.76 41.69 44.80
0.600 0 0 43.70 0.00 0.00 18.35 18.35
0.150 0 0 10.16 0.00 0.00 4.27 4.27
6 of 19
e) Volume of all in Agg. = [a-(b+c+d+e)]
= 1.000 -0.1175 -0.150 -0.004 0.0000
= 0.728 M3
f) Mass of Coarse Agg. = e X Volume of Coarse Agg. X Sp. Gr of Coarse Agg. X 1000
10mm = 0.728 X 26.00% X 2.63
= 498.13 Kg.
g) Mass of Fine Agg. = e X Volume of Fine Agg. X Sp. Gr of Fine Agg. X Percentage of Blend
a) Extra quantity of water added for absorption in case of CA (20mm) at 0.31% by mass =
b) Extra quantity of water added for absorption in case of CA (10mm) at 0.41% by mass =
Extra quantity of water added for absorption in case of FA (Crushed
c) 2.69% by mass =
Sand) at
d) Quantity of water to be deducted for free moisture in Crushed Sand =
e) Quantity of water to be deducted for free moisture in Coarse Aggregate (20mm) =
f) Quantity of water to be deducted for free moisture in Coarse Aggregate (10mm) =
g) Actual Quantity of water to be added =
h) Actual quantity of 20 mm aggregate after allowing absorption =
i) Actual quantity of 10 mm aggregate after allowing absorption =
j) Actual quantity of Crushed Sand after allowing absorption =
7 of 19
Note:-
1 The mix design carried out in laboratory, if the workability achieved at site is less than required workability due to
chemical admixture can be increased slightly and site trials should be conducted to check the workability and stren
than required, water content should be adjusted.
2 The mix design is based on saturated surface dry condition of coarse and fine aggregate. If dry aggregate are used,
increased by an amount equal to the moisture likely to be absorbed by the aggregates. If wet aggregates are used, n
the mixing water and aggregate depending upon the amount of surface moisture present.
3 It will be advisable to check the silt content of crushed sand at frequent intervals during the supply, if the silt conte
permissible limil, the crushed sand may require washing.
Remarks:
Signature : Signature :
Name : Name :
Designation : Designation :
Date : Date :
8 of 19
&T CONSORTIUM
RUCTION OF CIVIL,BUILDING AND TRACK WORKS,ELECTRICAL AND
CTP-14) FROM REWARI TO DADRI-WDFC-PHASE 2
DESIGN SHEET
5
Trial Mix No:- 7
DATE: 29.08.2019
9 of 19
As per letter no. L/OCGC/DFCC/CMT/CTP-
14/1801/9199
10 of 19
% of Spec. Limits as per
Passing C.A - Table 7.1
100.00 100
95.46 95-100
44.21 25-55
5.38 0-10
KHERIBATTAR
11 of 19
Specification Limits IS: 383
Zone-III
100
90-100
85-100
75-100
60-79
12-40
0-20
12 of 19
Specified
Limits as
per
IS:383
100
95-100
30-50
10-35
0-6
%
%
%
%
%
Kg.
Kg. or Ltr.
Ltr.
mm
Ltr.
Ltr.
Ltr.
Ltr.
Ltr.
13 of 19
14 of 19
X 1000
X 1000
X 1000
Sand (Kg)
Crushed Sand
786
2.12
1.91 Kg
2.04 Kg
21.14 Kg
0.00 Kg
0.00 Kg
0.00 Kg
175 Kg
613 Kg
496 Kg
765 Kg
Actual
Qty per
Cum
15 of 19
site is less than required workability due to temprature variation the dose of
onducted to check the workability and strength. If the workability achieved is more
d fine aggregate. If dry aggregate are used, the amount of mixing water should by
the aggregates. If wet aggregates are used, necessary adjustment should be made on
moisture present.
intervals during the supply, if the silt content in crushed sand is higher than
Signature :
Name :
Designation :
Date :
16 of 19
SOJITZ - L&T CONSORTIUM
INTIGRATED CONTRACT PACKAGE OF DESIGN AND CONSTRUCTION OF CIVIL,BUILDING AND
TRACK WORKS,ELECTRICAL AND MECHANICAL WORKS AND S&T WORKS (CTP-14) FROM REWARI
TO DADRI-WDFC-PHASE 2
Project :Civil, Building, Track work, Electric & Mechanical work and S&T work for Double Railway line (Rewari-Dadri)
Employer :DFCCIL
Microsilica 0 Kg _ _ _ 0 0.00
Nominal aggregate
Design slump Cementious Content Maximum free water / cementitious ratio
maximum size
20 MM 150 +-25 MM 500 KG 0.405
RESULTS
Time (minutes) INITIAL 30 MIN. 60 MIN. 90 MIN. 120 MIN. 150 MIN. Remarks
ConcreteTemperature in .
C
Ambient Temperature in .
C
Workability in mm (slump)
TM. No.- 22
S-1 Temperature of Water in.C
Mix Satisfactory :
Remark:-
Signature: Signature:
Name: Name:
Designation: Designation:
Date: Date:
SOJITZ - L&T CONSORTIUM
INTIGRATED CONTRACT PACKAGE OF DESIGN AND CONSTRUCTION OF CIVIL,BUILDING AND
TRACK WORKS,ELECTRICAL AND MECHANICAL WORKS AND S&T WORKS (CTP-14) FROM REWARI
TO DADRI-WDFC-PHASE 2
Project :Civil, Building, Track work, Electric & Mechanical work and S&T work for Double Railway line (Rewari-Dadri)
Employer :DFCCIL
Microsilica 0 Kg _ _ _ 0 0.00
Nominal aggregate
Design slump Cementious Content Maximum free water / cementitious ratio
maximum size
20 MM 150 +-25 MM 500 KG 0.266
RESULTS
Time (minutes) INITIAL 30 MIN. 60 MIN. 90 MIN. 120 MIN. 150 MIN. Remarks
ConcreteTemperature in .
C 33.8 33.9 34.2 34.5 34.6 34.9
Ambient Temperature in .
C 33.7 33.9 34.2 34.4 34.3 34.1
Mix Satisfactory :
Remark:-
Signature: Signature:
Name: Name:
Designation: Designation:
Date: Date:
SOJITZ - L&T CONSORTIUM
INTIGRATED CONTRACT PACKAGE OF DESIGN AND CONSTRUCTION OF CIVIL,BUILDING AND
TRACK WORKS,ELECTRICAL AND MECHANICAL WORKS AND S&T WORKS (CTP-14) FROM REWARI
TO DADRI-WDFC-PHASE 2
Project :Civil, Building, Track work, Electric & Mechanical work and S&T work for Double Railway line (Rewari-Dadri)
Employer :DFCCIL
Microsilica 0 Kg _ _ _ 0 0.00
Nominal aggregate
Design slump Cementious Content Maximum free water / cementitious ratio
maximum size
20 MM 150 +-25 MM 500 KG 0.266
RESULTS
Time (minutes) INITIAL 30 MIN. 60 MIN. 90 MIN. 120 MIN. 150 MIN. Remarks
ConcreteTemperature in .
C 34 34.1 34.4 34.6 34.9 35.2
Ambient Temperature in .
C 33.9 33.5 33.4 33.1 32.9 32.5
Mix Satisfactory :
Remark:-
Signature: Signature:
Name: Name:
Designation: Designation:
Date: Date: