HAZOP Worksheet

Node : 11
Type :
Drawing :
Design conditions/Parameters

Risk matrix
Guidewords Causes Consequences Safeguards Recommendations Responsibilities
L S R
No flow FCV is fail to open Level falling 4 1 4 Install manual valve Plant builder
(HCV) and level should check this
switch segment.

Pipe is blocked Level falling 3 1 3 Install additional pipe Plant builder


line and level switch should check this
segment.

Less flow Pipe is leaked Level falling 3 1 3 Install additional pipe Plant builder
line and level switch should check this
segment.

More flow FCV is fail to close Separator 4 2 8 Pressure control valve Plant builder
overpressurized, level and liquid control valve should check this
incleasing are already installed segment.

Reverse flow PCV is fail to open and Separator damaged 4 4 16 Install additional pipe Plant builder
separator line and flow control should install
overpressurized valve additional pipe
line and pressure
control valve.
Less temperature Refrigerant is C5+-rich stream increase 3 1 3 Liquid control valve is Install temperature Plant builder and
overworking already installed indicator operator should
check on the
refrigerator.

More temperature Refrigerant is fail NG-rich gas stream 3 1 3 Pressure control valve Install temperature Plant builder and
increase, efficiency is already installed indicator operator should
decrease check on the
refrigerator.

Less pressure PCV is fail to close Level falling 4 1 4 Install flow back pipe Plant builder
line and additional should check this
pressure control valve segment.

LCV is fail to close and Two phase flow 4 2 8 Pressure control valve Install additional pipe Plant builder
level falling is already installed line and flow control should check this
valve segment.

More pressure PCV is fail to open Separator 4 3 12 Install additional pipe Plant builder
overpressurized and line and flow control should install
reverse flow occurs valve additional flow
control valve and
additional pipe
line.

Pipe line is blocked Separator 3 3 9 Install additional pipe Plant builder


overpressurized and line and flow control should install
reverse flow occurs valve additional flow
control valve and
additional pipe
line.
Start-up Feed gas is not cooled Efficiency deacrese 3 1 3

Plant builder
Reverse flow occurs at Flow control valve is should check this
Shut down reverse flow 4 2 8
the separator already installed segment.

Maintenance Refrigerator maintenance Total system failure 3 1 3