30-Juni-18: Daily Report
30-Juni-18: Daily Report
Siang -
1 1-Jun-17
Malam 0.0
Siang -
2 2-Jun-17
Malam -
Siang -
3 3-Jun-17
Malam -
Siang -
4 4-Jun-17
Malam -
Siang -
5 5-Jun-17
Malam -
Siang -
6 6-Jun-17
Malam -
Siang -
7 7-Jun-17
Malam -
Siang -
8 8-Jun-17
Malam -
Siang -
9 9-Jun-17
Malam -
Siang -
10 10-Jun-17
Malam -
Siang -
11 11-Jun-17
Malam -
Siang -
12 12-Jun-17
Malam -
Siang -
13 13-Jun-17
Malam -
Siang -
14 14-Jun-17
Malam -
Siang -
15 15-Jun-17
Malam -
Siang -
16 16-Jun-17
Malam -
Siang -
17 17-Jun-17
Malam -
Siang -
18 18-Jun-17
Malam -
Siang -
19 19-Jun-17
Malam -
Siang -
20 20-Jun-17
Malam -
Siang -
21 21-Jun-17
Malam -
Siang -
22 22-Jun-17
Malam -
Siang -
23 23-Jun-17
Malam -
Siang -
24 24-Jun-17
Malam -
Siang -
25 25-Jun-17
Malam -
Siang -
26 26-Jun-17
Malam -
Siang -
27 27-Jun-17
Malam -
Siang -
28 28-Jun-17
Malam -
Siang -
29 29-Jun-17
Malam -
Siang -
30 30-Jun-17
Malam -
Siang -
31 1-Jul-17
Malam -
jumlah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! #DIV/0! #DIV/0!
MONITORING EXCA 05
SITE Arutmin Asam-asam - Kalsel
PERIODE : Juli-Agustus 2018
HM engine Standby WH
Alokasi Total Break
No date SHIFT Operator Jam Kerja Pekerjaan Standby (jam kerja down PA UA REMARK
Start Finish ∑ HM engine shif 1 & 2 Rest No. Oprat Lain-lain Hujan efektif)
Siang KARNO 16,913.0 16,921.0 8.00 10.00 1.00 1.00 2.00 8.00 100% 80%
1 8-Jul-18
Malam KARNO 16,921.0 16,929.0 8.00 10.00 1.00 1.00 2.00 8.00 100% 80%
Siang RUDIANTO 16,929.0 16,938.0 9.00 10.00 1.00 1.00 9.00 100% 90%
2 9-Jul-18
Malam KARNO 16,938.0 16,948.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
Siang RUDIANTO 16,948.0 16,957.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
3 10-Jul-18
Malam KARNO 16,957.0 16,967.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
Siang RUDIANTO 16,967.0 16,974.0 7.00 10.00 Loading Top Soil 1.00 2.00 3.00 7.00 100% 70%
4 11-Jul-18
Malam KARNO 16,974.0 16,984.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
Siang RUDIANTO 16,984.0 16,993.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
5 12-Jul-18
Malam RUDIANTO 16,993.0 16,996.0 3.00 3.00 Ob Soil Stok - 3.00 100% 100% Cange shift Mingguan
Siang KARNO 16,996.0 17,005.0 9.00 10.00 Maintenance jln OB Soil 1.00 1.00 9.00 100% 90%
6 13-Jul-18
Malam RUDIANTO 17,005.0 17,010.0 5.00 10.00 Loading Top Soil 5.00 5.00 5.00 100% 50% Unit support dozer No operator(sakit)
Siang KARNO 17,010.0 17,021.0 11.00 10.00 Loading Top Soil - 11.00 100% 110%
7 14-Jul-18
Malam RUDIANTO 17,021.0 17,026.0 5.00 10.00 Loading Top Soil 5.00 5.00 5.00 100% 50% Hujan Lebat
Siang KARNO 17,026.0 17,033.0 7.00 10.00 Loading Top Soil 1.00 2.00 3.00 7.00 100% 70% Hujan Lebat
8 15-Jul-18
Malam RUDIANTO 17,033.0 17,039.0 6.00 10.00 Loading Top Soil 1.00 3.00 4.00 6.00 100% 60% Hujan Lebat
Siang KARNO 17,039.0 17,047.0 8.00 10.00 Loading Top Soil 1.00 1.00 2.00 8.00 100% 80%
9 16-Jul-18
Malam RUDIANTO 17,047.0 17,056.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang KARNO 17,056.0 17,063.0 7.00 10.00 Loading Top Soil 1.00 2.00 3.00 7.00 100% 70%
10 17-Jul-18
Malam RUDIANTO 17,063.0 17,072.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang KARNO 17,072.0 17,081.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
11 18-Jul-18
Malam RUDIANTO 17,081.0 17,090.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang KARNO 17,090.0 17,100.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
12 19-Jul-18
Malam KARNO 17,100.0 17,103.0 3.00 3.00 Loading Top Soil - 3.00 100% 100% Over Shift Mingguan
Siang RUDIANTO 17,103.0 17,111.0 8.00 10.00 Loading Top Soil 1.00 1.00 2.00 8.00 100% 80%
13 20-Jul-18
Malam KARNO 17,111.0 17,120.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang RUDIANTO 17,120.0 17,129.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
14 21-Jul-18
Malam KARNO 17,129.0 17,137.0 8.00 10.00 Loading Top Soil 1.00 1.00 2.00 8.00 100% 80%
Siang RUDIANTO 17,137.0 17,141.0 4.00 10.00 Loading Top Soil 1.00 5.00 6.00 4.00 100% 40% Buang Air di jalan
15 22-Jul-18
Malam KARNO 17,141.0 17,143.0 2.00 10.00 Loading Top Soil 1.00 7.00 8.00 2.00 100% 20% Hujan Lebat
Siang RUDIANTO 17,143.0 17,151.0 8.00 10.00 Loading Top Soil 1.00 1.00 2.00 8.00 100% 80% Nunggu penyekrapan jln
16 23-Jul-18
Malam KARNO 17,151.0 17,161.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
Siang RUDIANTO 17,161.0 17,170.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
17 24-Jul-18
Malam KARNO 17,170.0 17,179.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang RUDIANTO 17,179.0 17,188.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
18 25-Jul-18
Malam KARNO 17,188.0 17,197.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang RUDIANTO 17,197.0 17,207.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
19 26-Jul-18
Malam RUDIANTO 17,207.0 17,210.0 3.00 3.00 Loading Top Soil - 3.00 100% 100% Over Shift Mingguan
Siang KARNO 17,210.0 17,218.0 8.00 10.00 Loading Top Soil 1.00 1.00 2.00 8.00 100% 80%
20 27-Jul-18
20 27-Jul-18
Malam RUDIANTO 17,218.0 17,227.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang KARNO 17,227.0 17,236.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
21 28-Jul-18
Malam RUDIANTO 17,236.0 17,245.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang KARNO 17,245.0 17,255.0 10.00 10.00 Loading Top Soil - 10.00 100% 100%
22 29-Jul-18
Malam RUDIANTO 17,255.0 17,264.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang KARNO 17,264.0 17,273.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
23 30-Jul-18
Malam RUDIANTO 17,273.0 17,282.0 9.00 10.00 Loading Top Soil 1.00 1.00 9.00 100% 90%
Siang 17,282.0 17,288.0 6.00 10.00 1.00 3 4.00 6.00 100% 60% habis solar
24 31-Jul-18
Malam RUDIANTO 17,288.0 17,297.0 9.00 10.00 Loading Top Soil 1 1.00 9.00 100% 90%
Siang Karno 17,297.0 17306.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
25 1-Aug-18
Malam Rudianto 17,306.0 17315.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Karno 17,315.0 17322.0 7.00 10.00 Ob Top Soil 1.00 2.00 3.00 7.00 100% 70% Ganti Safety Ling
26 2-Aug-18
Malam Karno 17,322.0 17325.0 3.00 3.00 Ob Top Soil - 3.00 100% 100% Over Shift
Siang Rudianto 17,325.0 17334.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
27 3-Aug-18
Malam Karno 17,334.0 17343.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Rudianto 17,343.0 17352.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
28 4-Aug-18
Malam Karno 17,352.0 17361.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Rudianto 17,361.0 17,370.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
29 5-Aug-18
Malam Karno 17,370.0 17,373.0 3.00 10.00 Ob Top Soil 7.00 7.00 3.00 100% 30% Hujan
Siang Rudianto 17,373.0 17,382.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
30 6-Aug-18
Malam Karno 17,382.0 17,391.0 9.00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Rudianto 17,391.0 17,401.0 10.00 10.00 Ob Top Soil - 10.00 100% 100%
31 7-Aug-18
Malam 17,401.0 17,401.0 0.00 10.00 10.00 10.00 - 100% 0% No Job
jumlah 488.00 592.00 5.00 24.00 105.00 488.00 0.00 100% 82%
Siang Supardi 8:00 18:00 10:00 10.00 10.00 10.00 - 100% 0% NO OPERATOR (Izin)
1 8-Jul-18
Malam Herman 19:00 6:00 11:00 10.00 Ob top soil - 10.00 100% 100%
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
2 9-Jul-18
Malam Herman 19:00 6:00 11:00 10.00 Ob top soil - 10.00 100% 100%
Siang Supardi 15:00 18:00 3:00 10.00 Ob top soil - 3.00 7.00 30% 30% B/D Monting
3 10-Jul-18
Malam Herman 19:00 6:00 11:00 10.00 Ob top soil - 10.00 100% 100%
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 2.00 8.00 100% 80% Nunggu Fuel
4 11-Jul-18
Malam Herman 19:00 6:00 11:00 10.00 Ob top soil - 10.00 100% 100%
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
5 12-Jul-18
Malam Supardi 7:00 10:00 3:00 3.00 Ob top soil - 3.00 100% 100% Change Shift Mingguan
Siang Herman 9:00 16:00 7:00 10.00 Ob top soil 1.00 1.00 6.00 3.00 70% 60% B/D bering roda blkg pecah
6 13-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D bering roda blkg pecah
Siang Herman 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D bering roda blkg pecah
7 14-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D bering pecah + baut 1 lepas
Siang Herman 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D bering pecah + baut 1 lepas
8 15-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D bering pecah + baut 1 lepas
Siang Herman 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D bering pecah + baut 1 lepas
9 16-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D bering pecah + baut 1 lepas
Siang Herman 16:00 18:00 2:00 10.00 Ob top soil 1.00 1.00 2.00 7.00 30% 20% B/D bering pecah + baut 1 lepas
10 17-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 Pekerjaan 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
11 18-Jul-18
Malam Supardi 7:00 17:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
12 19-Jul-18
Malam Supardi 19:00 22:00 3:00 3.00 Ob top soil - 3.00 100% 100% Over Shift Mingguan
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 0.50 1.50 8.50 100% 85%
13 20-Jul-18
Malam Supardi 19:00 22:00 3:00 3.00 Ob top soil - 3.00 100% 100% Long Shift
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
14 21-Jul-18
Malam Herman 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% Pengurangan DT
Siang Supardi 8:00 9:00 1:00 10.00 Ob top soil 9.00 9.00 1.00 100% 10% HUJAN LEBAT
15 22-Jul-18
Malam Herman 20:00 21:00 1:00 10.00 Ob top soil 9.00 9.00 1.00 100% 10% HUJAN LEBAT
Siang Supardi 9:00 18:00 9:00 10.00 Ob top soil 1.00 1.00 2.00 8.00 100% 80% Nunggu penyekrapan jln
16 23-Jul-18
Malam Herman 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
17 24-Jul-18
Malam Herman 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Supardi 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
18 25-Jul-18
Malam Herman 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% Pengurangan DT
Siang Supardi 7:30 18:00 10:30 10.00 Ob top soil 0.50 0.50 9.50 100% 95%
19 26-Jul-18
Malam Supardi 19:00 22:00 3:00 3.00 Ob top soil - 3.00 100% 100% Over Shift Mingguan
Siang Herman 7:30 18:00 10:30 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
20 27-Jul-18
20 27-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
21 28-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
22 29-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
23 30-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob top soil 1.00 2.00 3.00 7.00 100% 70% nunggu fuel
24 31-Jul-18
Malam Supardi 19:00 5:00 10:00 10.00 Ob top soil 1.00 1.00 9.00 100% 90%
Siang Herman 8:00 18:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
25 1-Aug-18
Malam Supardi 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 8:00 16:30 8:30 10.00 Ob Top Soil 1.00 0.50 1.50 8.50 100% 85%
26 2-Aug-18
Malam Alkafi 19:00 22:00 3:00 3.00 - - 3.00 70% 0% B/D Monting tranmisi
Siang Supardi 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi
27 3-Aug-18
Malam Herman 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Supardi 9:00 18:00 9:00 10.00 Ob Top Soil 1.00 1.00 2.00 8.00 100% 80%
28 4-Aug-18
Malam Herman 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Supardi 9:30 18:00 8:30 10.00 Ob Top Soil 1.00 1.50 2.50 7.50 100% 75%
29 5-Aug-18
Malam Herman 19:00 21:30 2:30 10.00 Ob Top Soil 7.50 7.50 2.50 100% 25% Hujan
Siang Supardi 9:30 18:00 8:30 10.00 Ob Top Soil 1.00 1.50 2.50 7.50 100% 75%
30 6-Aug-18
Malam Herman 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Supardi 8:00 18:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
31 7-Aug-18
Malam Herman 19:00 1:00 6:00 10.00 10.00 10.00 - 100% 0% No Driver (izin)
jumlah 585.00 35.50 10.50 39.50 25.50 111.00 374.00 100.00 83% 64%
Siang Arifin 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D GARDAN DEPAN
1 8-Jul-18
Malam Alkafi 19:00 6:00 11:00 10.00 - - 10.00 0% 0% B/D GARDAN DEPAN
Siang Arifin 9:00 18:00 9:00 10.00 ob top soil 1.00 1.00 2.00 8.00 100% 80%
2 9-Jul-18
Malam Alkafi 19:00 6:00 11:00 10.00 ob top soil - 10.00 100% 100%
Siang iqbal 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
3 10-Jul-18
Malam Alkafi 19:00 6:00 11:00 10.00 ob top soil - 10.00 100% 100%
Siang Arifin 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 2.00 8.00 100% 80% Nunggu Fuel
4 11-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 ob top soil - - 10.00 0% 0% B/D kabel dinamo
Siang Arifin 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
5 12-Jul-18
Malam Arifin 19:00 22:00 3:00 3.00 ob top soil - 3.00 100% 100% Change SHIFT Mingguan
Siang Alkafi 9:00 12:00 3:00 10.00 ob top soil - 3.00 7.00 30% 30% B/D Ban kempes
6 13-Jul-18
Malam Arifin 19:00 3:00 8:00 10.00 ob top soil 1.00 2.00 3.00 7.00 100% 70%
Siang Alkafi 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Ban No. 9
7 14-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Ban No.9
Siang Alkafi 8:00 16:30 8:30 10.00 ob top soil 1.00 1.50 2.50 7.50 100% 75% HUJAN LEBAT
8 15-Jul-18
Malam Arifin 21:00 4:00 7:00 10.00 ob top soil 1.00 3.00 4.00 6.00 100% 60% HUJAN LEBAT
Siang Alkafi 8:10 18:00 9:50 10.00 ob top soil 1.00 1.00 9.00 100% 90%
9 16-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 10:30 18:00 7:30 10.00 ob top soil 1.00 1.50 2.50 7.50 100% 75%
10 17-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 10.00 0% 0% B/D Baut brackel monting
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
11 18-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
12 19-Jul-18
Malam Alkafi 19:00 22:00 3:00 3.00 ob top soil - 3.00 100% 100% Over Shift Mingguan
Siang Arifin 8:00 18:00 10:00 10.00 ob top soil 1.00 0.50 1.50 8.50 100% 85%
13 20-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Arifin 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
14 21-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 ob top soil 10.00 10.00 - 100% 0% Pengurangan DT
Siang Arifin 8:00 10:00 2:00 10.00 ob top soil - 2.00 8.00 20% 20% B/D + hujan
15 22-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% HUJAN LEBAT
Siang Arifin 9:00 18:00 9:00 10.00 ob top soil 1.00 1.00 2.00 8.00 100% 80% Nunggu penyekrapan jln
16 23-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Arifin 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
17 24-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Arifin 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
18 25-Jul-18
Malam Alkafi 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% Pengurangan DT
Siang Alkafi 7:30 18:00 10:30 10.00 ob top soil 1.00 1.00 9.00 100% 90%
19 26-Jul-18
Malam Alkafi 19:00 22:00 3:00 3.00 ob top soil - 3.00 100% 100% Over Shift Mingguan
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
20 27-Jul-18
20 27-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
21 28-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
22 29-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
23 30-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 ob top soil 1.00 1.00 9.00 100% 90%
Siang Alkafi 8:00 18:00 10:00 10.00 ob top soil 1.00 2.00 3.00 7.00 100% 70% nunngu fuel
24 31-Jul-18
Malam Arifin 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% No Job
Siang Arifin 8:00 18:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
25 1-Aug-18
Malam Arifin 19:00 22:00 3:00 3.00 Ob Top Soil - 3.00 100% 100% Long Shift
Siang Arifin 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Knalpot lepas + monting depan
26 2-Aug-18
Malam Alkafi 19:00 22:00 3:00 3.00 - - 3.00 70% 0% B/D Knalpot lepas + monting depan
Siang Arifin 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Knalpot lepas + monting depan
27 3-Aug-18
Malam Alkafi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Knalpot lepas + monting depan
Siang Arifin 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi putus
28 4-Aug-18
Malam Alkafi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi putus
Siang Arifin 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi putus
29 5-Aug-18
Malam Alkafi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi putus
Siang Arifin 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi putus
30 6-Aug-18
Malam Alkafi 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Monting tranmisi putus
Siang Arifin 16:00 18:00 2:00 10.00 Ob Top Soil - 2.00 8.00 20% 20% B/D Perbaikan Mounting
31 7-Aug-18
Malam Alkafi 19:00 3:15 8:15 10.00 Ob Top Soil 1.00 1.00 8.25 0.75 93% 83% B/D Ban bocor
jumlah 585.00 32.00 1.00 40.50 13.00 86.50 321.75 176.75 70% 55%
Siang iqbal 14:00 18:00 4:00 10.00 OB SOIL 6.00 6.00 4.00 100% 40% Nunggu jalan di Skraf
1 8-Jul-18
Malam Mujiono 19:00 2:00 7:00 10.00 OB SOIL 1.00 1.00 2.00 6.00 2.00 80% 60% B/D Oil Power Steering bocor
Siang iqbal 9:00 18:00 9:00 10.00 OB SOIL 1.00 1.00 2.00 8.00 100% 80% B/D Oil Power Steering bocor
2 9-Jul-18
Malam Mujiono 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Oil Power Steering bocor
Siang iqbal 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Oil Power Steering bocor
3 10-Jul-18
Malam Mujiono 19:00 4:00 9:00 10.00 1.00 1.00 8.00 1.00 90% 80% B/D Oil Power Steering bocor
Siang iqbal 17:00 18:00 1:00 10.00 OB SOIL - 1.00 9.00 10% 10% B/D Power stering
4 11-Jul-18
Malam iqbal 19:00 22:00 3:00 3.00 OB SOIL - 3.00 100% 100% Long Shift ( Mujiono Sakit )
Siang iqbal 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
5 12-Jul-18
Malam iqbal 19:00 22:00 3:00 3.00 OB SOIL - 3.00 100% 100% Change Shift mingguan
Siang Mujiono 9:00 18:00 9:00 10.00 OB SOIL 1.00 1.00 2.00 8.00 100% 80%
6 13-Jul-18
Malam iqbal 19:00 0:00 5:00 10.00 OB SOIL 5.00 5.00 5.00 100% 50% Kondisi jalan krg aman
Siang Mujiono 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Engin monting
7 14-Jul-18
Malam iqbal 19:00 0:00 5:00 10.00 5.00 5.00 5.00 100% 50% B/D Ban bocor
Siang Mujiono 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Ban bocor
8 15-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Ban bocor
Siang Mujiono 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D Ban bocor
9 16-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang Mujiono 10:30 18:00 7:30 10.00 OB SOIL 1.00 2.50 3.50 6.50 100% 65%
10 17-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang Mujiono 8:00 18:00 10:00 10.00 OB SOIL 1.00 2.00 3.00 7.00 100% 70%
11 18-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang Mujiono 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
12 19-Jul-18
Malam Mujiono 19:00 22:00 3:00 3.00 OB SOIL - 3.00 100% 100% Over Shift Mingguan
Siang iqbal 8:00 18:00 10:00 10.00 OB SOIL 1.00 0.50 1.50 8.50 100% 85%
13 20-Jul-18
Malam Mujiono 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang iqbal 8:00 12:00 4:00 10.00 OB SOIL 6.00 6.00 4.00 100% 40%
14 21-Jul-18
Malam Mujiono 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang iqbal 8:00 18:00 10:00 10.00 10.00 10.00 - 100% 0% Hujan
15 22-Jul-18
Malam Mujiono 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% Hujan
Siang iqbal 9:00 18:00 9:00 10.00 OB SOIL 1.00 1.00 2.00 8.00 100% 80% Nunggu penyekrapan jln
16 23-Jul-18
Malam Mujiono 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang iqbal 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
17 24-Jul-18
Malam iqbal 19:00 22:00 3:00 10.00 OB SOIL 1.00 6.00 7.00 3.00 100% 30% Pengurangan DT
Siang iqbal 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
18 25-Jul-18
Malam Mujiono 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang iqbal 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
19 26-Jul-18
Malam iqbal 19:00 22:00 3:00 3.00 OB SOIL - 3.00 100% 100% Over Shift Mingguan
Siang iqbal 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
20 27-Jul-18
20 27-Jul-18
Malam Mujiono 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% Pengurangan DT
Siang Mujiono 8:00 18:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
21 28-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 10.00 10.00 - 100% 0% Pengurangan DT
Siang Mujiono 8:00 17:00 9:00 10.00 OB SOIL 1.00 1.00 8.00 1.00 90% 80% B/D Ban bocor
22 29-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 - - 10.00 0% 0% B/D Ban bocor
Siang Mujiono 8:00 18:00 10:00 10.00 OB SOIL - 5.00 5.00 50% 50% B/D Ban bocor
23 30-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang Mujiono 8:00 18:00 10:00 10.00 OB SOIL 1.00 2.00 3.00 7.00 100% 70% Nunggu Fuel
24 31-Jul-18
Malam iqbal 19:00 5:00 10:00 10.00 OB SOIL 1.00 1.00 9.00 100% 90%
Siang Mujiono 8:00 18:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
25 1-Aug-18
Malam Iqbal 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Mujiono 8:00 18:00 10:00 10.00 - - 10.00 0% 0% B/D AC Monting + Bracket
26 2-Aug-18
Malam 19:00 22:00 3:00 3.00 - - 3.00 70% 0% B/D AC Monting + Bracket
Siang Iqbal 8:00 16:00 8:00 10.00 Ob Top Soil 1.00 2.00 3.00 7.00 100% 70%
27 3-Aug-18
Malam Mujiono 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Iqbal 10:00 18:00 8:00 10.00 Ob Top Soil 1.00 1.00 2.00 8.00 100% 80%
28 4-Aug-18
Malam Mujiono 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Iqbal 9:30 18:00 8:30 10.00 Ob Top Soil 1.00 4.00 5.00 5.00 100% 50% Hujan
29 5-Aug-18
Malam Mujiono 19:00 0:30 5:30 10.00 Ob Top Soil 7.50 7.50 2.50 100% 25% Hujan
Siang Iqbal 9:30 18:00 8:30 10.00 Ob Top Soil 1.00 1.50 2.50 7.50 100% 75%
30 6-Aug-18
Malam Mujiono 19:00 5:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
Siang Iqbal 8:00 18:00 10:00 10.00 Ob Top Soil 1.00 1.00 9.00 100% 90%
31 7-Aug-18
Malam Mujiono 19:00 0:00 5:00 10.00 Ob Top Soil - 5.00 5.00 50% 50% B/D Baut Braket patah
jumlah 585.00 37.00 0.00 63.50 31.50 132.00 347.00 106.00 82% 59%