ICTProjectScedule1 Classic Schedule Layout 20-Apr-19 14:38

Project: ICTPRM-1 ICTProjectScedule1


WBS: ICTPRM-1.1 Arcitectural

P1000 P1010 P1020 P1030 P1040 P1050 P1060 P1090 P1100 P1110
Start of Proje ct 0.00 Creating Col laborative 0.10 Ground Floor 3.00 First Floor 2.00 Sec ond Floor 2.00 Roof 2.00 Design Elem ents 5.00 Pergola/ External Work 5.00 Exterior Finishes 4.00 BOQ 2.00
0.00 Environm ent 0.00 0.00 0.00 0.00 0.00 0.00 Including Landscaping 0.00 0.00 0.00
11-M ar-19 A 11-M ar-19 A 11-M ar-19 A 11-Mar-19 A 14-Mar-19 A 14-M ar-19 A 16-M ar-19 A 16-M ar-19 A 19-M ar-19 A 19-M ar-19 A 21-M ar-19 A 21-M ar-19 A 25-M ar-19 A 26-M ar-19 A 28-Mar-19 A 01-Apr-19 A 04-Apr-19 A 05-Apr-19 A 06-Apr-19 A

P1070
Furniture/ Kitchens/ 5.00
Toile ts/S tairs 0.00
26-M ar-19 A 28-Mar-19 A

WBS: ICTPRM-1.2 Structural

P1120 P1130 P1140 P1150 P1160 P117 0 P1180 P1190 0.00 P1200 0.00 P1210 0.00 P1230 0.00 P1240 P1250
Im porting Collaborative 0.00 R.C .C. Foundation Grid 3.00 R.C .C. Coulmns to Top 4.00 R.C.C. Beam s Fra ming 8.00 R.C.C. Slabs Level 2.00 Rebaring fi rst plac ed in 1.00 Rebaring in Foundations 2.00 Rebaring in Colum ns Grid 10. 00 Rebaring in Beam s Grid 12. 00 Rebaring in Slabs Levels 3.00 Rebaring Additional 5.00 BOQ Elem ents re lated to 2.00 BOQ Schedules 2.00
Data 0.00 Designat ed 0.00 Level Grid Designated 0.00 Grid Designated 0.00 Designated 0.00 Pipe pierced Beam s Freely 0.00 Gri d Designated 0.00 Designat ed 0.00 Designat ed 12. 00 Designat ed 3.00 Eleem ents 5.00 non structural nee ds 0.00 0.00
11-Mar-19 A 11-Mar-19 A 11-Mar-19 A 12-M ar-19 A 13-M ar-19 A 14-M ar-19 A 15-M ar-19 A 19-M ar-19 A 20-M ar-19 A 21-M ar-19 A 22-M ar-19 A 22-Mar-19 A 26-Mar-19 A 27-Mar-19 A 28-Mar-19 A 06-Apr-19 06-Apr-19 19-Apr-19 20-Apr-19 23-Apr-19 24-Apr-19 29-Apr-19 02-Apr-1 9 A 03-Apr-1 9 A 04-Apr-19 A 05-Apr-19 A

P1220
R.C .C. A ddit ional 4.00
Elements(Tan ks 0.00
22-M ar-19 A 25-Mar-19 A

WBS: ICTPRM-1.3 Electrical

P1260 P1270 P1310 P1320 P1330 3.00 P1340 P1350


BIM Environment Creat ion 0.00 Fam iliesArranged 2.00 Electrical Fixt ures Power 5.00 Wiring P ower Plan 2.00 Conduiting Power Plan 6.00 BOQ Elem ents related to 2.00 BOQ Schedules 2.00
0.00 0.00 Plan 0.00 0.00 6.00 non el ectric al work 2.00 0.00
15-Mar-19 A 15-Mar-19 A 15-M ar-19 A 20-M ar-19 A 11-Apr-19 A 12-Apr-19 A 13-Apr-19 A 13-Apr-19 A 13-Apr-19 A 19-Apr-1 9 20-Apr-19* 22-Apr-19 13-Apr-19 A 13-Apr-19 A

P1280 P1290 P1300


Electrical Fixt ures Li gting 5.00 Wiring Ligting Plan 2.00 Conduiting Lighting Plan 6.00
Plan 0.00 0.00 0.00
21-M ar-19 A 25-M ar-19 A 09-Apr-19 A 10-Apr-19 A 26-M ar-19 A 08-Apr-1 9 A

WBS: ICTPRM-1.4 Plumbing

P1360 P1370 P1380 P1390 P1410


BIM Environment Creat ion 0.00 Fam ilyA rranged 4.00 Fixtures + Manholes + 8.00 Piping + Joining 8.00 BOQ Schedules 4.00
0.00 0.00 Sinks + T oilets 0.00 0.00 0.00
11-Mar-19 A 11-Mar-19 A 11-Mar-19 A 14-M ar-19 A 18-M ar-19 A 22-M ar-19 A 28-Mar-19 A 01-Apr-19 A 03-Apr-19 A 06-Apr-19 A

WBS: ICTPRM-1.5 Firefighting

P1420 P1430 P1440 P1450 P1460


BIM Environm ent Creation 0.00 Fam ilyA rranged 3.00 Fixtures 4.00 Pipiing and Joining 6.00 BOQ Schedules 2.00
0.00 0.00 0.00 0.00 0.00
15-M ar-19 A 15-M ar-19 A 15-M ar-19 A 16-M ar-19 A 23-M ar-19 A 27-M ar-19 A 03-Apr-19 A 06-Apr-1 9 A 08-Apr-19 A 08-Apr-19 A

WBS: ICTPRM-1.6 ICT

P1470 P1480 P1490 P1500 P1510


BIM Environm ent Creation 0.00 Fam ilyA rranged 1.00 Fixtures 1.00 Conduiting 1.00 BOQ 0.50
0.00 0.00 0.00 0.00 0.00
18-M ar-19 A 18-M ar-19 A 18-M ar-19 A 18-M ar-19 A 19-M ar-19 A 19-M ar-19 A 20-M ar-19 A 20-M ar-19 A 21-M ar-19 A 21-Mar-19 A

WBS: ICTPRM-1.7 Final Checks

P1520 0.00 P1530 0.00 P1540 0.00 P1550 0.00


Checking Drawing, BOQ 5.00 Drafting Qual ity Checks 5.00 Print Drawings 5.00 Finish of Projects 0.00
Schedules and 5.00 and Guidance 5.00 5.00 0.00
30-Apr-19 04-May-19 06-M ay-19 10-M ay-19 11-M ay-19 16-M ay-19 16-M ay-19

Activity ID Total
Activity Name Original Page 1 of 2 © Oracle Corporation
Remaining
Start Finish

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
ICTProjectScedule1 Classic Schedule Layout 20-Apr-19 14:38
Project: ICTPRM-1 ICTProjectScedule1
WBS: ICTPRM-1.1 Arcitectural

WBS: ICTPRM-1.2 Structural

WBS: ICTPRM-1.3 Electrical

WBS: ICTPRM-1.4 Plumbing

WBS: ICTPRM-1.5 Firefighting

WBS: ICTPRM-1.6 ICT

WBS: ICTPRM-1.7 Final Checks

Activity ID Total
Activity Name Original Page 2 of 2 © Oracle Corporation
Remaining
Start Finish

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)