This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
– Roof-Greening Guideline –
with
Methods to be employed when investigating vegetation substrates and
aggregate-type drainage materials used at roof-greening sites
1995 edition
with supplements dated January 2002
and
1999 edition
with editorial changes dated January 2002
Published by:
Forschungsgesellschaft Landschaftsentwicklung Landschaftsbau e. V. – FLL
Colmantstr. 32, 53115 Bonn
Editorial team:
The Roof-Greening Working Group
Lösken, G., Prof., Hannover (Chairman)
Adam, H.-J., Hannover
Appl, R., Nürtingen
Bohlen, R., Ladbergen
Fischer, P., Prof. Dr., Freising-Weihenstephan
Hämmerle, F., Ditzingen
Henneberg, M., Krauchenwies
Henseleit, R., Dr., Frankfurt
Hofmann, H.-U., Stuttgart
Kist, R., Stuttgart
König, P., Kretz
Krupka, B., Bad Pyrmont
Liesecke, H.-J., Prof. Dr., Hannover
Marrett-Foßen, M., Dr., Tornesch
Michels, K., Köln
Neumann, K., Prof. Dr., Berlin
Nott, D., Düsseldorf, Münster
Raisch, W., Ostfildern
Roth-Kleyer, S., Prof. Dr., Geisenheim
Ruttensperger, S., Stuttgart
Schade, C., Groß Ippener
Schenk, D., Unterensingen
Schuhmann, V., Bad Honnef
Siegert, P., Tornesch
Tebart, W., München
Wittke, K., München
ISBN 3-934484-81-6
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Upon its first publication the “Guidelines for the Planning, Execution and Upkeep of Green-Roof
Sites – Roof Greening Guidelines” issued by FLL have found wide distribution and acceptance
even beyond the borders of the Federal Republic of Germany. Their significance is mirrored also
by the fact that reference is made to them repeatedly in the DIN standards.
As a continuation of the 1995 edition the present 2002 edition includes new developments and
findings especially in the complex field of roof drainage. Beside statements related to drainage
systems using pressurized drainage this revised edition also comes to conclusions based on new
findings in regard to the working mechanism of corrosion affecting drainage systems: the carbon-
ate content of materials is no longer listed among valid evaluation criteria.
In regard to the coefficient of discharge a differentiation is made between the run-off reference
value for drainage according to DIN EN 12056 and DIN 1986 and the annual total retention of rain
water seen from an ecological perspective. In addition, criteria for acceptance processes have
been specified, recommendations relating to the duration of warranty periods made, and care and
maintenance activities revised and enlarged.
In the context of changes concerning granulometric distribution for single-course substrates and
drainage course materials as well as nutrients and the proportion of organic substances in sub-
strates it seems appropriate to take note of the close relationship between RAL quality assurance
and the FLL Roof-Greening Guidelines. The RAL quality assurance, issued by RAL in 1999, takes
up criteria of the guidelines and includes regular monitoring of substrates and aggregate-type
drainage materials in relation to their compliance with the defined parameters. In this context, the
revised version of the FLL Roof-Greening Guidelines will also imply an adjustment of the quality
and testing regulations by the RAL quality assurance.
No revision has been effected in regard to investigation methods and the procedure for investigat-
ing resistance to root penetration which are part of the appendix of these guidelines. As far as in-
vestigation methods are concerned a procedure to determine the coefficient of discharge was
added. In respect of resistance to root penetration only editorial changes were made.
The present edition replaces the 1995 edition. It is in line with state-of-the-art technology and sci-
entific research and takes account of practical experience so that it can be seen as a set of “recog-
nised rules of technique” in the sense of the Standard Building Contract Terms.
We would like to express our thanks and gratitude to all members of the FLL Working Party “Roof-
Greening” as well as to all experts who have contributed to the revision of these guidelines for their
work and commitment in the development of roof-greening.
3
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Contents
1 Area of Validity, Purpose.................................................................................................. 8
1.1 Area of validity .................................................................................................................. 8
1.2 Purpose.............................................................................................................................. 8
1.3 Other Standards, Guidelines and Codes of Practice..................................................... 8
2 Types of Greening and Forms of Cultivation ............................................................... 12
2.1 Types of greening ........................................................................................................... 12
2.1.1 General information........................................................................................................... 12
2.1.2 Intensive greening............................................................................................................. 12
2.1.3 Simple intensive greening ................................................................................................. 12
2.1.4 Extensive greening ........................................................................................................... 12
2.2 Different forms of cultivation ......................................................................................... 13
2.2.1 General information........................................................................................................... 13
2.2.2 Different forms of cultivation - intensive greening ............................................................. 13
2.2.3 Different forms of cultivation - simple intensive greening.................................................. 13
2.2.4 Different forms of cultivation - extensive greening ............................................................ 13
2.3 Identifying site conditions for vegetation..................................................................... 14
2.3.1 General information........................................................................................................... 14
2.3.2 Climate- and weather-dependant factors .......................................................................... 14
2.3.3 Structure-dependant factors.............................................................................................. 14
2.3.4 Plant-dependant factors .................................................................................................... 14
3 Functions and Effects..................................................................................................... 15
3.1 General information ........................................................Fehler! Textmarke nicht definiert.
3.2 Functions and effects of town planning and planning for open-air amenities ......... 15
3.3 Ecological functions and effects ................................................................................... 15
3.4 Protective and economic functions and effects .......................................................... 16
4 Requirements related to Construction and Materials.................................................. 17
4.1 Planning requirements ................................................................................................... 17
4.2 Form of use / suitability for use..................................................................................... 17
4.3 Roof slope........................................................................................................................ 17
4.4 Roof designs and suitability for greening .................................................................... 18
4.4.1 Roofs with damp-proof linings........................................................................................... 18
4.4.2 Roofs made from non water-permeable concrete............................................................. 19
4.4.3 Roofs with coverings ......................................................................................................... 19
4.5 Diffusion of moisture ...................................................................................................... 19
4.6 Design loads.................................................................................................................... 19
4.7 Protection against falls................................................................................................... 20
4.8 Draining ...........................................................................Fehler! Textmarke nicht definiert.
4.9 Watering........................................................................................................................... 20
4.10 Compatibility of materials .............................................................................................. 21
4.11 Environmental compatibility ..........................................Fehler! Textmarke nicht definiert.
4.12 Plant compatibility / absence of any risk of phytotoxicity .......................................... 21
5 Technical Requirements (Construction)....................................................................... 22
5.1 General information ........................................................................................................ 22
5.2 Protection against root penetration .............................................................................. 22
5.2.1 Materials ........................................................................................................................... 22
5.2.2 Requirements.................................................................................................................... 22
5.2.3 Execution .......................................................................................................................... 23
4
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
5
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
6
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
7
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
1.2 Purpose
Over the past few years, increasing prominence has been given to greening in connection with
building projects, as a means of enhancing the environment in the places where we live and work
and of improving the way they work and look. A great deal of development work has been under-
taken, involving both ‘intensive’ and, in particular, ‘simple intensive’ and ‘extensive’ greening, whilst
at the same time embracing construction methods and materials, also the use of plants.
The area covered by these guidelines extends to the greening of roofs, terraces and façades at a
variety of levels in buildings as well as to other structures where greening is not necessarily carried
out at ground level.
For the evaluation of green-roof sites cf. “Evaluation of green-roof sites; recommendation related to
evaluating construction planning, approval procedures and acceptance”, FLL 1998.
The purpose of the guidelines is to set out the basic principles and requirements which apply in
general terms to the planning, execution and maintenance of such schemes, taking full account of
current knowledge and the most advanced technology. They deal with additional basic principles
relating to the planning and construction of properties, and the emphasis is on technical require-
ments in respect of construction and vegetation. These guidelines are intended for the use of pro-
fessionals and craftsmen working in all relevant sectors and trades.
Since, for the most part, existing Standards and Guidelines do not apply directly to roof-greening, a
check needs to be made in each instance to see how applicable they are generally, whether or not
they can be used in a modified form. Particular attention needs to be paid to the individual Stan-
dards and Guidelines listed below, each of which will be valid in its most recent version.
Reference needs to be made at this point to the validity and statutory significance of the specific
handling instructions issued by manufacturers and processors in respect of various materials, also
to the comprehensive associated set of materials standards.
8
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Standards
DIN 1055 Structural design loads.
–1: Bedding materials, construction materials and structural components,
intrinsic loads and friction angles
–3: Live loads
–4: Live loads: wind loads in structures which are not susceptible to vibration
–5: Live loads: snow and ice loads
DIN 1986 Drainage facilities for buildings and properties
–1: Technical conditions (construction)
–2: Establishment of nominal widths for drainage and ventilation facilities
(Note: DIN 1986–1 and –2 have been partly replaced by DIN EN 12056, edition
01/2001 and were both in force up until June 30, 2001. After this date the standards
DIN EN 12056–1 to –3 jointly with DIN 1986–100 have been in force)
–30: Maintenance
–100: Drainage Installations for Buildings and Plots of Land
(Note: Additional regulations in connection with DIN EN 12056, draft version 01/2001,
upon its adoption this version shall replace DIN 1986-1+2 in combination with DIN
EN 12056–1 to –3)
DIN 1988 Technical Rules governing Drinking Water Installations
DIN 4045 Sewage Technology – Basic Principles
DIN 4095 Building Sites; Drainage for the protection of the construction plant: Planning,
Determination of Requirements and Execution
DIN 4102 Behaviour of construction materials and components under fire
–1: Construction materials: terminology, requirements and tests
–4: Composition and use of classified construction materials and structural
components, also of special structural components
–7: Roofing; terminology, requirements and tests
(Note: in conjunction with decrees adopted by the various federal States on the basis
of the ARGEBAU (ed.): specimen decree “Behaviour of green-roof sites under fire:
adopted by the Fachkommission Bauaufsicht [Building Inspectorate Commission]”
dated 22./23.06.1989)
DIN 4108 Thermal insulation in buildings
DIN 4109 Sound insulation in buildings
DIN 18035 –4: Playing fields; grassed areas
DIN 18195 Damp-proofing of buildings
–1: Principles, definitions, allocation of different types of damp-proofing
–2: Materials
–3: Requirements related to the use of materials
–5: Damp-proofing – moisture protection
–6: Protection against external groundwater
–8: Damp-proofing over settlement joints
–10: Protective layers and protective action
DIN 18531 Damp-proofing of roofs. Terminology, requirements, planning principles
DIN 18915 Vegetation technology in landscaping: groundwork
DIN 18916 Vegetation technology in landscaping; plants and working with plants
DIN 19917 Vegetation technology in landscaping; lawns and seeding
DIN 18919 Vegetation technology in landscaping; care of green areas during maturation
and subsequent maintenance.
DIN EN 12056 Gravity force drainage installations within buildings
– 1: General requirements related to execution
– 3: Roof drainage, planning and calculation
(Note: in conjunction with DIN 1986–100, at present: draft version 01/2001)
9
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
THE FEDERAL MINISTER FOR THE ENVIRONMENT, PROTECTION OF NATUR AND SECURITY OF POWER
STATIONS:
– Regulation governing Sewage Sludge AbfKlärV
THE GERMAN INSTITUTE FOR QUALITY ASSURANCE AND CODING E.V. RAL (ED.):
Federal Agency for Compost e.V.:
– Compost, quality certificate RAL-GZ 251
Agency for Plastic, Roof and Damp-proofing Sheeting Contractors e.V.:
– Laying of plastic sheeting for roofs and plastic damp-proofing lining,
quality certificate RAL-RG 718
Agency for Substrates for Planting e.V.:
– Quality and testing regulations bark for planting, quality certificate RAL-GZ 250
– Quality and testing regulations roof substrates, quality certificate RAL-GZ 253
– Quality and testing regulations basic materials for substrates,
quality certificate RAL-GZ 254
THE LANDSCAPING AND LANDSCAPE DEVELOPMENT RESEARCH SOCIETY E.V. – FLL (ED.):
– Recommendation related to percolation and water retention
– Descriptive list of fertilizers for landscaping and the construction of playing fields
– Evaluation of green-roof sites; recommendation related to evaluating construction planning,
approval procedures and acceptance
– Quality assessment in tree nursery plants
– Quality assessment in shrubs
– Quality requirements for organic mulch materials and composts for landscaping purposes
and recommendations regarding the use of same
– Standard seed mixtures lawn – RSM
– Guideline for the planning, execution and care related to façade greening with climbers
– Procedure for investigating resistance to root penetration at green-roof sites
10
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
ZDB THE GERMAN CENTRAL BUILDING TRADE ASSOCIATION E.V. (ZDB), ASSOCIATION OF GERMAN
TILING EXPERTS (ED.):
– Code of Practice governing the laying of floor tiles and slabs outside buildings
THE GERMAN CENTRAL ROOFING TRADE ASSOCIATION – ASSOCIATION OF ROOFING, WALLING AND
DAMP-PROOFING EXPERTS E.V. AND CHIEF GERMAN CONSTRUCTION INDUSTRY ASSOCIATION E.V.
FEDERAL DEPARTMENT FOR STRUCTURAL DAMP-PROOFING (ED.):
– Guidelines for roofs with damp-proofing – flat roof guidelines
Also any further guidelines, codes of practice and official rulings such as may affect green-roof
sites.
Contractual obligations
DIN GERMAN STANDARDISATION INSTITUTE (ED.):
– StLB – Standard contractual terms for the construction industry
– STLB – Subsidiary contractual terms for open-air amenities
– StLB – Temporary work contracts
THE LANDSCAPING AND LANDSCAPE DEVELOPMENT RESEARCH SOCIETY E.V. – FLL (ED.):
– Special terms, additional terms and industrial customs and practices in conjunction with
landscaping standards DIN 18915–18920
– MLV–open-air amenities – specimen list of contractual terms governing open-air amenities
– MLV–roof and façade greening sites – specimen contractual terms governing roof- and fa-
çade-greening
11
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Each of these types covers a variety of forms of cultivation, with seamless transition and site-
specific differentiation. Having due regard for all the information which has been derived from the
use of plants and vegetation science, the following criteria may be used to differentiate between
the three types of greening.
Regular attention is needed to maintain sites of this type in good order, in particular regular water-
ing and feeding is required.
An simple intensive greening site is less costly to construct than is an intensive greening site.
The plants which are used will be particularly well suited to coping with the full range of conditions
which they are likely to encounter at the locations in which they will be planted, and they will be
capable of self-propagation. These plants should be of Central European flora stock, but local flora
should be considered.
Vegetation stocks, the bulk of which will be enclosed and flat, will consist of mosses, succulents,
herbaceous plants and grasses. The vegetation stock will undergo a natural process of change,
including new types of plants which enlarge the flora stock in the course of time.
12
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
As a rule, extensive greening is the least costly to implement and maintain. Depending on the
greening objective, any regional climatic conditions and the type of construction certain selected
care activities, such as nutrient supply, may be required.
The distinction between different vegetation forms can only be exemplary given the wide range of
option and is based on stock-forming groups of plants. In individual cases on part-surfaces differ-
ent vegetation aspects may form due to varying site conditions.
13
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
The factors which determine the quality of any given site may be listed under the following head-
ings:
– climate- and weather-dependant factors
– structure-dependant factors and
– plant-dependant factors
14
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
The way in which these functions and effects are classified under the above headings and the
weighting which they carry will vary from one situation to the next. This being the case, a measure
of overlap is inevitable in any classification based on the most essential features and any example
is, at best, illustrative and the sequence in which they are listed has no implications in terms of
their respective values.
Functions and effects are used to evaluate construction work in the context of testing for environ-
mental compatibility and environmental impact regulations, a process in which the procedures fol-
lowed and the weighting accorded to different factors will vary from one local or regional authority
to the next. In order to ensure that the required functions and effects are achieved it is recom-
mended that, with appropriate targets, minimum standards be laid down in terms of the composi-
tion and density of construction, depth and the form of vegetation (see also “Evaluation of roof-
greening”).
3.2 Functions and effects of town planning and planning for open-air amenities
– More green and open-air amenities are provided on a given property, without additional land
acquisition costs
– Green areas and open-air amenities are maintained or reclaimed as compensatory action at
sites which have been placed under a strain or over-utilised by buildings or some other form of
surface cover
– The appearance of urban and rural areas is improved by bringing in additional plants, greenery
and green spaces, all of which are planning features with a natural look, designed to empha-
sise the creation of a sense of structure and spaciousness
– By allocating both private and open spaces which people can experience and use in the im-
mediate vicinity of the places where they live and work, planners can create a better environ-
ment for these activities
– Plants, greenery and green spaces give overlooked flat rooftops in the vicinity a more natural
look than that created by weathered or gravel-covered roofs
15
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
16
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In particular in case of larger course depths checks need to made as to what extent principles re-
lated to earthwork have to be applied.
Basically, the use by people of roofs which have been subjected to greening is restricted to paved
walkways and terraces intended specifically to act as rest areas and surfaced accordingly. Full
access to a roof which has been subjected to greening is only possible where turf has been laid for
just that purpose. Note has to be taken of guidelines related to construction requirements for build-
ings which have to be adapted to the needs of disabled persons.
Planted areas at intensive greening sites, along with areas of vegetation at extensive greening
sites laid out with a ‘virtual Nature’ look, are not meant to be used, and access is normally re-
stricted to people who care for and maintain the site.
Roofs with a slope of less than 2 % are special structures and they will, therefore, require special
measures. This also applies to individual roof areas, such as valleys.
Where a green-roof site of the intensive type is to be watered from an integral reservoir, the roofing
will either have to be constructed without any gradient or reservoir boards will have to be provided.
For extensive and simple intensive greening, roofs with a gradient of at least 2 % should be con-
sidered the norm, in accordance with the “Flat-roof Guidelines”. In extensive greening, controlled
drainage will meet the basic needs of the vegetation.
Where extensive greening is being applied to roofs in which the gradient is less than 2 %, a drain-
age course of suitable dimensions will be needed to cope with water run-off and avoid waterlog-
ging in the vegetation support course. Single-course structures will need to be free from waterlog-
ging in the standard structure depth. The total depth of the structure has to be increased
accordingly, if necessary.
17
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Tab.1: Examples for comparing the values of percent in roof slope and degree in gradient
As the gradient increases, so does the rate at which water runs off the roof. A layered superstruc-
ture with a fairly high water-storage capacity and poor drainage, or vegetation which does not re-
quire a great deal of water, will compensate for gradients of 5 % or more.
As the angle at which the roof slope increases, special action is required to protect the structure
against shear and slide (see 5.10). In view of the structural and vegetation problems which roofs
with a gradient in excess of 45° pose, greening should not be considered in such cases.
18
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
U-shaped roofs
Where greening is carried out on U-shaped roofs, or other roofs with special shapes, fitted with
thermal insulation above the damp-proof lining, attention needs to be paid to moisture diffusion.
Each site will have to be assessed to see whether or not a levelling or intermediate course is
needed. Attention will have to be paid to the special conditions which apply where redevelopment
work is involved.
Roof made from non water-permeable concrete with thermal insulation overlay
Greening is possible as for U-shaped roofs.
When deciding into which category the superstructure fits, all the courses must be considered, at
maximum water capacity and including the surface load generated by the vegetation, as a compo-
nent in the surface load. The load generated by any water stored in an integral reservoir will also
need to be added into the figures. Spot loadings generated by large-scale bushes, trees and struc-
tural components, such as pergolas, water pools and peripheral items, will need to be calculated
separately (see also paragraph 13).
Where greening is being carried out and spot loads are being positioned, it is particularly important
to ensure that the thermal insulation and the damp-proof lining on the roof have adequate com-
pressive strength.
Where a layered superstructure is being constructed, care must be taken to ensure that any sub-
stances used as intermediate layers do not push the load above the design limit.
If the course of the vegetation is to serve as a protection against negative pressure effects created
by wind affecting the underlying roof structure, paragraph 5.8 needs to be taken into account.
19
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
4.8 Draining
Arrangements for water drainage shall comply with the requirements laid down in DIN EN 12056–3
and DIN 1986–100 (for the time being available only as a draft version). Care must be taken right
at the beginning of planning for roof-greening sites to ensure that there are proper facilities avail-
able for draining water from all areas, whether or not they have been subjected to greening. Sepa-
rate account needs to be taken of water draining off façades.
Drainage must be available through the layered superstructure and off the surface of same. There
are three different arrangements which may be used to drain excess water off the roof quickly:
– drainage within the vegetation area
– drainage outside the vegetation area
– separate drainage facilities for areas which have undergone greening and those which have
no vegetation
Regardless of the size of the roof surface, roofs with drainage facilities located within the vegeta-
tion area have to have at least one run-off facility and at least one emergency overflow. Run-off
facility and emergency overflow are to be designed in accordance with DIN EN 12056–3.
When designing the size of drainage facilities in accordance with DIN EN 12056–3 and 1986–100
the run-off reference values / coefficients of discharge listed in paragraph 6.3.4 shall be used.
In addition, for roof drainage facilities with pressurized drainage VDI guideline 3806 has to be
taken into account. In connection with roof greening the following aspects are important:
– at small-scale green-roof sites it is to be checked whether the rain water volume is sufficient to
ensure the self-cleaning power of the pressure discharge system (see also VDI 3806, para-
graph 3.2)
– in any pressure discharge system a combination of roof surfaces with different discharge de-
lay, such as e.g. intensive greening, extensive greening, gravel and non-gravel roofs, is to be
avoided
– greening with a large surface water reservoir in the drainage course should be drained by
means of a separate open channel system, since the run-off behaviour is difficult to foresee
and currently no clear statements can be made in regard to the effects on roof drainage with
pressure systems
– ensure regular maintenance of the drainage system in accordance with DIN 1986–30
4.9 Watering
The number of mains pipes and junction points required for watering, along with the sizes used,
will depend upon local conditions and on the structure involved. These factors will also be deter-
mined by the size and layout of the property. During the planning stage, mains demand will need to
be established having regard to local conditions and to the form of cultivation to be used for the
vegetation, close attention being paid to the provisions laid down in DIN 1988.
20
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
If any material is found to be incompatible, either the selection must be revised or an additional
barrier layer will have to be provided.
Damp-proof linings and root-penetration barriers must be checked to ensure that they are resistant
to hydrolysis. The materials will also have to be checked to ensure that they are suited to constant
exposure to water as a result of greening applied over the top of them. Where necessary, evidence
may be needed to show that this is the case.
There must be no risk that these functions may be compromised by changes brought about due to
the biological action of micro-organisms or by substances dissolved in water.
21
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Due to their construction floors made of non water-permeable concrete and welded metal vats are
resistant to root penetration. Settlement joints in floors made of non water-permeable concrete
have to be equipped with a special treatment against root penetration.
An additional course may be laid on the roof on top of the damp-proof lining to prevent root pene-
tration, although the latter can, itself, take on this function if an appropriate combination of materi-
als is used, provided that the requirements laid down in 5.2.2 are met.
5.2.2 Requirements
Modern engineering requires that both intensive and extensive green-roof sites have to be pro-
vided with constant suitable and lasting protection against root ingress or penetration which would
damage the damp-proof lining.
Where grasses with strong rhizome growth are used, such as bamboo and varieties of Chinese
reeds, the structure will need more protection than just a root-penetration barrier. Special arrange-
ments will also have to be made for upkeep.
Resistance to root penetration will need to be proven in the manner prescribed in the “Procedure
for investigating resistance to root penetration at green-roof sites, FLL 1999”.
22
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
5.2.3 Execution
From a damp-proofing and protection perspective the sealing of a roof surface which is divided into
various sub-areas should be effected in its totality. Protection measures against root penetration
should not be limited to those areas where vegetation has been planted.
Any joints, borders, places where there are features which pass through the roof and structural
joints will need to be treated to prevent penetration by roots.
Where sheeting is used to prevent root penetration, it will only be effective if appropriate sealant
materials are used on seams. The properties of some materials are such that additional treatment
is needed along seams, as specified by the manufacturer, to seal off any capillaries which may be
present, as is the case, for instance, where woven fabric-reinforced sheeting is concerned.
Where additional sheeting is being laid on top of a damp-proof lining with a rough surface to pre-
vent root penetration, a barrier layer will need to be incorporated in order to prevent mechanical
damage to it. Any damp-proof lining / root-penetration barrier which is not UV-resistant will need to
be treated. Where there is a break in construction work, temporary protection will be required, as
prescribed in DIN 18195, Part 10.
Work on joints and borders shall be carried out in accordance with the “Flat-roof guidelines” and
DIN 18195. This also applies to additional root-penetration barrier sheeting or courses laid as a
damp-proof lining. Any root-penetration barrier sheeting or courses laid in separate confined areas
must be affixed firmly and permanently, by mechanical means, along the top border of the sealed
area and protection must be provided.
Greening must not be applied to expansion joints, to which unrestricted access must be available
at all times.
In cases of large surface water reservoirs (see 6.4) and a roof damp-proof lining which is not resis-
tant to root penetration the protection against root penetration to be applied may at the same time
form the vat for water retention. In case of roof damp-proof lining which is resistant to root penetra-
tion a water retention reservoir should be planned and provided as a separate unit.
The method used to protect the site against mechanical damage will depend on subsequent levels
of stress in the damp-proof lining/root-penetration barrier used on the roof. In some cases, courses
of concrete or screed may be needed to provide protection against mechanical damage (see 5.4).
23
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
5.3.2 Requirements
DIN 18195 part 1 states that a distinction needs to be made between protective courses, protective
linings and protective action.
According to DIN 18195, part 10, “Protective courses must provide damp-proof linings in structures
with permanent protection against the harmful effects of static, dynamic and thermal stress. In
some cases, they may act as wearing surfaces in the structure.” This requirement also applies to
the root-penetration barrier. Where a green-roof site is classified as a wearing surface, it can also
act as a protective course.
According to DIN 18195, part 1, “A protective lining provides additional protection for damp-proof
linings made up of sheet-type materials, but is not a substitute for a protective course....”
Depending on the materials used, a protective lining may be needed on top of the damp-proof lin-
ing/root-penetration barrier on a roof, forming part of the layered superstructure at the green-roof
site (see 6.1.1 and 6.1.2.4).
According to DIN 18195, Part 1, “Protective action consists of measures taken by contractors dur-
ing construction to provide temporary protection for damp-proofing.” At green-roof sites, the damp-
proof lining/root-penetration barrier will need to be protected against mechanical damage during
construction. As a rule, where a protective layer or course of appropriate dimensions is applied
immediately upon completion of the damp-proof lining/root-penetration barrier, there will be no
need for additional protection.
Protective linings and courses must not be susceptible to functional impairment due to the action of
any extraneous materials which cause mechanical damage.
5.3.3 Execution
Where stress levels are moderate, as is the case where there is a thin superstructure, a suitable
protective nonwoven fabric weighing at least 300g/m² may be used (see also “Guidelines for flat
roofs”).
Where stress levels are fairly high, provision must be made for the installation of protective sheet-
ing, panels or matting, each of which needs to be fitted in the appropriate manner. The dimensions
used will need to be tailored to the level of stress.
When using protective layers made from concrete and screed at green-roof sites the additional
loads which are imposed need to be taken into account. If the materials are not installed in a pro-
fessional way there is the risk of carbonate release and of corrosion in the drainage facilities (see
5.4). Where mastic asphalt is used to create protective courses, attention needs to be paid to
thermal tolerance and the compatibility of materials, as well as to additional loads. Protective
courses of this type can become necessary at green-roof sites where vehicular access is required.
They will need to be formed in the manner prescribed in DIN 18195, Part 10.
Drainage courses laid immediately after the damp-proof lining/root-penetration barrier has been
applied to the roof must be protected against mechanical damage.
24
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In the meantime, these findings have been proven by testing and have been supplemented by the
following aspect: even the use of highly calcareous vegetation support courses, e.g. consisting of
substrates containing a certain proportion of recycled brick clay with mortar, travertine, dolomite or
limy composts has not led to any incident of corrosion affecting drainage facilities. Based on these
test results carbonates are no longer taken into account as evaluation criteria for drainage and
vegetation support courses.
Where concrete or screed protective courses are laid, the surface must be formed or treated in
such a manner as to ensure that it is sufficiently compact to prevent the release of any carbonates.
In the cases of surrounds (see 5.11), paved walkways (see 5.12) and furnishings (see 5.13) set in
mortar or fine chippings, care must be taken to treat the surface of the mortar in a way to ensure
that no carbonates in larger quantities can be dissolved.
If, in individual cases, the standard installation of concrete, cement floor or mortar is not possible
the surface has to be protected against dissolution of carbonates through water ingress by means
of a top coating and/or covering or inclusion with plastic sheeting.
5.5.2 Requirements
Drainage facilities must be capable of collecting both overflow from the drainage course and sur-
face water from the vegetation support course and of conveying it away. Water from adjoining fa-
çades has to be drained off in such a manner that the functions of the vegetation course and struc-
ture are not impeded.
Where pressurised drainage is used, checks must be made on a site-by-site basis to see how ef-
fective it is when operating under the conditions found at a green-roof site (see 4.8).
As a matter of basic principle, roof outlets at green-roof sites must not be allowed to become cov-
ered with greenery or loose gravel and they must be constructed in such a manner as to render
them permanently accessible. Plants must not be allowed to grow into guttering, thereby prevent-
ing them from working properly.
25
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
5.5.3 Execution
5.5.3.1 Roof outlets in areas with vegetation
Where roof outlets are located within vegetation areas, an inspection shaft will need to be installed,
to allow inspections to be carried out, to prevent contamination and to stop plants from growing
over the outlet.
Where a reservoir is created in the drainage course, inspection shafts must be installed with valves
to protect the roof outlet. Inspection shafts must not be on obstacle to drainage.
Where the roof slopes at a fairly steep angle, it must be assumed that greater volumes of rainwater
will run off at the eaves and allowance must be made for this factor when decisions are being
taken concerning dimensions for the drainage system and the construction of the eaves. The use
of over-hanging vegetation which grows vigorously should be avoided in the area surrounding the
eaves.
Very careful attention needs to be paid to the setting of dimensions where rainwater runs off the
roof via valley guttering, since the valley will need to cope with water running off two roof surfaces.
5.6.2 Requirements
In any building project, joints and borders can always be tailored to suit the property, detailed con-
ditions at individual sites and the characteristics specific to the materials used. Detailed recom-
mendations for dealing with this problem will be found in the “Flat-roof guidelines” and in other
regulatory documents dealing with damp-proofing.
At joints and borders, damp-proof linings/root-penetration barriers must be brought up to the top,
as prescribed in the “Flat-roof guidelines”, DIN 18195, Part 9, and in DIN 18531. They must then
be kept permanently in this position and must be protected against damage.
Since these requirements are so important in the context of roof-greening at sites where elevations
vary, it is worth reproducing them here:
26
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
As a rule, a strip made up of slabs or gravel must be provided to separate vegetation areas from
the structural component in question. If carried out as required this strip will provide protection
against negative pressures generated by the wind (see 5.8) and, in case of extensive greening,
assume the function of a preventive fire break (see 5.9).
5.6.3 Execution
5.6.3.1 Joints with façades
At joints with façades, the gravel strip acts as a safety margin and splash lap, and it must offer
open access for inspection, maintenance and upkeep. The safety margin prevents plant develop-
ment from being hindered by water running off the façade or by drops of water. If the strip has to
be used to clean a façade, it will have to be constructed with a correspondingly greater width.
It must be noted that, in accordance with the requirements laid down in 5.5.2, damp-proof lin-
ings/root-penetration barriers on roofs are to brought above the surface of gravel strips, vegetation
areas and paved areas with open access. This applies, similarly, to other vertical structural com-
ponents and to items which penetrate the roof, such as ventilation inlets and air vents, aerial ducts
and domelights. Where the layered superstructure incorporates a filter layer, the nonwoven fabric
used for this purpose must be brought up flush with the top of the vegetation course.
Where vegetation areas are to be created which are separated from the façade, there are different
options available:
– continuous drainage course beneath the vegetation area and the gravel strips
– separation of the vegetation support layer and gravel strips by means of a surround or of a
strip on nonwoven fabric
– separation of the vegetation support layer and gravel strips, with separate arrangements for
water removal
– installation of drainage guttering in place of the strip of gravel
Where parapets are high enough, the junction between the greening superstructure and the edge
of the roof should be executed in the manner used for façade joints.
27
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Where the parapets are on the small side and where the layered superstructure for the green-roof
site is fairly deep, a surround will have to be constructed to enclose the vegetation area.
DIN 1055, Part 4, breaks roof spaces down into three areas, each of which is subject to different
levels of stress and requires appropriate action to protect it:
– corners, where stress levels are very high
– edges, where stress levels are high, and
– the central area, where stress levels are low.
Where damp-proof linings/root-penetration barriers are not affixed rigidly, the layered superstruc-
ture at the green-roof site must be used to prevent them from being lifted up by the wind. At edges
and corners, gravel fill needs to be laid, slabs being used where stress levels are on the high side.
Temporary safety measures will be needed whilst construction work is in hand.
At green-roof sites, every effort is usually made to ensure that loads and the depth of the layered
superstructure are kept to an absolute minimum, but there are situations in which this depth needs
to be increased or heavier materials have to be used in order to secure borders and corner areas
which are particularly at risk. The critical factor here is the load generated by the layered super-
structure when it is dry. In certain cases, gravel fill and slabs may have to be used together to se-
cure the roof borders and corners.
The vertical load required for securing purposes needs to be established in the manner prescribed
in DIN 1055, Part 4, which prescribes a figure 1.5 times the positive or negative wind pressure.
This requirement in respect of gravel or concrete slabs, which relates solely to the vertical load,
takes no account of the fact that the following factors also apply at green-roof sites:
– coarseness of the vegetation stock
– the load generated by residual moisture in the soil superstructure
– the load generated by the vegetation stock, which has to be taken into account even though it
is low
– compared with the way in which chips settle individually in a gravel bed, roots spread through-
out the topsoil and bond an entire area together
– wind permeability in the vegetation support layer, which evens out the pressure differential
between the top and the underside of the vegetation layer, thereby reducing the load.
28
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
The listed criteria will reduce the load and will need to be taken into account when providing evi-
dence of the transfer of wind load.
Full particulars will be found in the appropriate regional buildings inspectorate order for the Federal
Land in question.
5.10.2 Requirements
Where vegetation on a roof which slopes at an angle of 20° or less (36 % gradient) is planted in
such a manner as to create stable conditions, there is usually no need for any costly measures to
prevent the structure from shearing, provided that the properties of the materials which make up
the underlying layers remain unaffected.
Where a roof slopes at an angle in excess of 20° (36 % gradient), structural anti-shear protection
will normally be needed. Once the angle exceeds 30° (58 % gradient), the problems associated
with the vegetation increase and a separate set of statics calculations will be needed. Care must
be taken to ensure that the action taken to prevent shearing does not create tension at the point of
contact with the damp-proof lining and the root-penetration barrier.
5.10.3 Execution
Special woven matting, anti-shear plates and profiles, studded anti-shear plates and anti-shear
fabrics, lined on the underside with geotextiles designed to deal with static loads, may be built into
the design of the structure to prevent slipping.
Where geotextiles or geotextile compound materials are used, they must have sufficient tensile
strength to cope with the anticipated static loads. In the case of roofs which slope on one side only,
they will need to be affixed along the upper edge in a permanent and satisfactory manner.
In order enable the vegetation to protect against sliding, the vegetation support course will have to
be cultivated in such a way as to ensure that structural soundness is not affected by water. This
29
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
may be achieved through the use of fine- to medium-sized gravel chippings with shapes which
mesh together when laid. It can also be achieved by limiting the amount of material which can be
washed out, so as to avoid changes in consistency, and by encouraging root penetration at the
fastest possible rate, thereby promoting bonding.
When determining the dimensions for the drainage system, allowance will have to be made for the
increased volumes of excess water which accumulate at the lower levels and need to be removed.
5.11 Surrounds
5.11.1 Types
Surrounds may consist of:
– vertical components arising from the main structure
– structural components made on site from materials such as concrete, clinker or timber, or
– prefabricated units, manufactured from materials such as fibre cement, stoneware, timber,
concrete or lightweight concrete.
5.11.2 Requirements
Surrounds must be sturdy and they must not generate pressure at the edges on damp-proof lin-
ings/root-penetration barriers. Where there are spot loads, attention must be paid to distribution,
also to the compressive strength of the material used for thermal insulation.
5.11.3 Execution
Structural components made on site or assembled from prefabricated parts may be laid either on a
protective/anti-bonding layer placed directly onto the damp-proof lining/root- penetration barrier, or
onto the filter course over the top of a continuous drainage course. In the event of chemical incom-
patibility, there may even be a need for a separate spacer layer if the protective/anti-bonding layer
does not already cater for this function.
In order to prevent scour, prefabricated structural units must be laid in mortar containing polymer
modifiers or in fine chippings (see 5.4). Depending on the outlet layout on the roof and where there
is combined drainage serving the vegetation and paved areas, drainage outlets must be provided
at the foot of the surrounds unless there are separate arrangements for drainage in the individual
areas on the roof.
30
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
5.12.2 Requirements
Paving must be sturdy and laid in such a manner as to avoid generating stresses. If the edges do
apply pressure, this must not be allowed to interfere with the workings of the damp-proof lin-
ing/root-penetration barrier. Spot loads will need to be adjusted to suit the base where raised pav-
ing is used.
Where paving is laid in mortar, it must, as a matter of principle, be laid with an adequate slope at
the surface. Due to the risk of blistering, cracking, frost damages and corrosion trafficable surface
paving laid in mortar should be an exception.
5.12.3 Execution
Paving in fine chippings must be laid on the filter course over the top of a continuous drainage
course or directly into materials which are capable of draining.
Depending upon the arrangement used for the elevated bearings, an additional course will be re-
quired to distribute pressure. Water from drainage courses in vegetation areas may run off into the
space under the elevated bearings or through it.
An anti-bonding level will be required underneath paving laid in mortar on top of damp-proof lin-
ings/root-penetration barriers. In order to prevent stress levels from building up in the paving, ex-
pansion joints appropriate to the materials concerned will need to be provided.
Where the vegetation area is watered from an integral reservoir in the superstructure and where
there are large paved areas, separation will be needed. Any drainage course made out of aggre-
gates and used to support loose paving must be no less than 6 cm thick.
5.13 Furnishings
5.13.1 Types
Furnishings include items such as:
– trellises
– pergolas
– lighting
– ponds, etc.
The layout for such items and the way in which they are installed are matters which need to be
tailored to individual sites, where they will need to be considered separately, both structurally and
in terms of static loading.
5.13.2 Requirements
Furnishings must be sturdy and they need to be set up and secured in such a manner as to spread
their weight. It is particularly important to ensure that no stress is generated when such items are
laid on their base. Allowance must be made, in accordance with DIN 1055, for spot and/or surface
loads and for wind loads.
5.13.3 Installation
Furnishings may be installed by means of:
– a system which anchors them to the roof and distributes the load, using mountings incorpo-
rated into the design of the roof, or
– flat or truss-type foundation (see also 5.4)
31
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Provision for furnishings can be incorporated into the structural design by means of mountings
which protrude above the damp-proof lining. Here, attention must be paid not only to the require-
ments in respect of static loadings, but also to the instructions relating to the creation of breaks in
the continuity of the roof surface (see 5.6).
Installation of furnishings which do not form part of the original roof design should only be under-
taken in exceptional circumstances. Where this does happen, care must be taken to ensure that
the continuity of the damp-proof lining/root- penetration barrier, also of the thermal insulation layer
and vapour seal, is not disturbed.
Where flat or truss-type foundations are used, anti-bonding and protective courses will have to be
installed over the top of the underlying courses in the roof superstructure. The dimensions which
are used here will depend directly upon the types of furnishings to be installed and upon the effect
which they have.
32
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
6.1.2 Definitions
6.1.2.1 Vegetation support course
The vegetation support course is capable of accommodating a dense root stock, having all the
requisite basic physical, chemical and biological properties needed for plant growth. It needs to be
stable, to be able to absorb water seepage for the benefit of plants and to allow only excess water
to percolate through to the drainage course. It must be capable of containing an adequate volume
of air for the type of vegetation planted in it, even when it has reached the maximum water content.
33
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In dependence of their material form individual courses may take over several functions.
For all types of construction a root penetration barrier and a sufficient protection course are re-
quired.
Tab. 2 lists the various courses depths of different greening types. Regional climatic conditions and
site-specific aspects, sometimes differing largely, require a lower or higher calculation of the
course depths to be installed within the range of options presented.
The following factors need to be taken into account when determining the sizes of the vegetation
support and drainage courses:
– the needs of the vegetation
– the properties of the materials used
– the angle at which the roof slopes
– exposure of the roof surface
– regional climatic conditions
– local conditions on site
– specific surface loadings for the materials used
– water retention which shall be achieved
In addition, when planning the functional courses the following aspects have to be taken into ac-
count:
– with increasing depth of the vegetation support course a differentiation has to be made in re-
gard to the organic content (see 9.1)
– single-course constructions consisting of aggregate-type materials should have a minimum
depth of 6 cm
– in case of larger course depths, beside drainage demands, the planning of the drainage
course should be calculated on the basis of the desired effect, in terms of vegetation growth,
to enlarge the volume of the course where roots can grow and to achieve a high air manage-
ment volume
– when planning the drainage course, even unfavourable drainage conditions, such as e.g. a
roof slope which is insufficient, counter-slope, uneven spots on the roof surface and too large
distances between the roof outlets, have to be taken into account
– special types of construction have to meet structural and vegetation-dependant requirements
34
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Moss-sedum
Sedum-moss-herbaceous plants
Sedum-herbaceous-grass plants
Grass-herbaceous plants
Types of greening and vegetation forms
Grass-herbaceous plants
Simple intesive
Coppices
Lawn
Medium-size trees
Large trees
The following reference values are used to identify the desired effects:
– maximum water capacity
– water permeability
– coefficient of discharge
– slowing down of water run-off
– annual coefficient of discharge
35
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
When calculating drainage needs for roof-greening the coefficient of discharge is based on the
ratio between rain drainage volume and rain fall during a block rain (see 4.8).
For roof-greening the following run-off reference values/coefficients of discharge C (ψ) depending
on the depth of the course and the roof gradient are applicable:
These run-off reference values are valid for the layered superstructure with a reference rain of r(15)
= 300 l/(s x ha) upon previous saturation with water and a 24-hour dropping off period.
By testing (see “Investigation methods” – appendix section 5) on a site-to-site basis location- and
product-specific values may be obtained. Depending on local rain fall higher or lower coefficients of
discharge may be resulting from the test outcome.
A coefficient of discharge for gravel areas of 0,5 was listed in DIN 1986–2 and turned out to be too
low. In the draft version of DIN 1986–100 the value is at 1,0, and is too high. Based on recent
studies it can be recommended to use a coefficient of 0,8 for gravel areas.
36
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Tab. 3 sets out reference values for percentage water retention. In regard to differentiated sew-
age/rain water drainage regulations also the annual coefficient of discharge/sealing coefficient is
shown.
Tab. 3: Reference values showing percentage annual water retention on green-roof sites in de-
pendence on course depth
Type of green- Course depth Form of vegetation Water reten- Annual coeffi-
ing tion - annual cient of dis-
in cm average in charge ψa /
in % sealing coeffi-
cient
All figures relate to locations with annual precipitation values of 650 – 800 mm where monitoring has been performed
over a period of several years. In regions with lower annual precipitation values water retention is higher, in regions with
higher annual precipitation it is lower.
37
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Water can be stored in various courses and in a number of different ways and forms which, de-
pending on the way in which the individual courses are constructed and the order in which they are
laid, may be divided up under the headings set out below:
– storage in the vegetation support course through the use of substances which retain water for
vegetation substrates or prefabricated substrate boards
– storage in the vegetation support course and, additionally, in the drainage course, through the
use either of open-pore type aggregate materials in graded granular sizes or of prefabricated
draining substrate boards
– storage in the vegetation support course and, additionally, in the drainage course, by allowing
a water supply to build up in the aggregate over the entire area or by using pre-formed drain-
age boards with partial retention characteristics.
Water may be stored simultaneously in the vegetation support and drainage courses, whatever
type of greening is used. There is scope for intensive root development throughout the layered
superstructure, all of which is available for water storage.
Current knowledge indicates that in the context of intensive greening schemes, the form of water
storage which offers the most reliable long-term performance and which caters most even-
handedly for all economic and ecological needs is a combined system in which water is stored in
the vegetation support course and held in a reservoir formed in the drainage course.
In the case of thin-course simple intensive greening, it only makes sense to form a reservoir in the
drainage course if additional watering is carried out during periods of low precipitation.
In contrast, reservoir-type watering arrangements at extensive greening sites are associated with
various drawbacks linked to plant physiology.
Where sprinklers, spray-type watering via a hose or drip-type watering is used, the system can
either be operated manually or controlled by means of a timer. A hand-held hose will have to be
used to water any areas which are tucked away in corners or which lie along edges which do not
receive adequate watering, due to their being roofed over or to deflection of the water jet by the
wind or for some other reason.
38
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Overhead irrigation systems, installed above or beneath the ground, may be operated manually or
by a timer, or they may be completely automatic. The piping must be corrosion-proof, and there
must be a facility for ensuring that the pipe system can be drained completely, so as to eliminate
the risk of frost damage.
A reservoir-based watering system may be fitted with an automatic or semi-automatic water feed.
Here, the drainage course acts as a reservoir which stores precipitation, the capacity of which will
depend on the type and depth of the drainage course involved. A minimum clearance needs to be
maintained between the peak level in the reservoir and the filter course, in order to prevent the
vegetation support course from becoming waterlogged. During the autumn and winter season,
when plant life is dormant, the artificial water table needs to be lowered by adjusting the valves in
the roof outlets. Alternatively, the water may be drained off completely.
39
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
7 Drainage Course
Aggregate-type materials
– gravel and fine chippings
– lava and pumice
– expanded clay and slate, unbroken
– expanded clay and slate, broken
Drainage matting
– textured nonwoven matting
– studded plastic matting
– fibre-type woven matting
– flock-type foam matting
Drainage boards
– boards made from foam pellets
– studded rubber boards
– shaped rigid plastic boards
– shaped plastic foam boards
Course materials and dimensions will depend upon construction requirements and objectives for
vegetation. If certain products, such as e.g. drainage boards, show a characteristic value for ther-
mal strength, due to a general approval scheme by the Construction Inspectorate, green-roof sites
may be constructed with countable heat insulation effect.
40
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
7.2 Requirements
Where drainage courses are concerned, some or all of the following properties will need to be
taken into account, depending on the group of materials in use:
– compatibility of materials (see 4.10)
– environmental compatibility (see 4.11)
– plant compatibility / absence of any risk of phytotoxicity (see 4.12)
– behaviour under fire (see 5.9)
– granulometric composition (see 7.2.1)
– frost-resistance (see 7.2.2)
– structural and bedding stability (see 7.2.3)
– behaviour under compressive loads (see 7.2.4)
– water-permeability (see 7.2.5)
– water-storage capacity / maximum water capacity (see 7.2.6)
– pH–value (see 7.2.7)
– salt content (see 7.2.9)
Details of the type and scope of standard suitability and inspection tests are set out in Section 12.
The different properties associated with the materials need to be assessed against the conditions
which apply in the position and at the site where they are to be used, in order to ensure that they
are suitable.
In aggregate-type materials, granular shape plays a critical role in the stability of the material once
it has been laid. In drainage courses, the use of broken grit is, therefore, to be prescribed for
depths of 4-10 cm and strongly recommended for depths of over 10 cm.
41
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
For drainage courses, the target for vertical water run-off, which is found by calculating the water
infiltration rate, using the method prescribed under “Investigation methods”, is mod. Kf ≥ 0.3 cm/s
Λ 180 mm/min.
As a rule, the drainage matting, boards and mineral aggregates currently in use are adequate for
areas of up to 400 m² or thereabouts per roof outlet and ca. 15 m outlet length where the water
runs off a roof at a gradient of no less than 2 %.
In the case of green-roof sites with a shallow layered superstructure, it needs to be borne in mind
that some of the precipitation which falls during rare periods of heavy rainfall is drained off the sur-
face.
If, for a given site, the amount of surface drainage is to be minimised, the volume per metre of
width which has to be handled by the drainage course [q’ in l/(s x m)] may be found in the follow-
ing manner:
A x C x q in l/(s x m)
q´ =
b
where
q´ = the volume in l/(s x m) cleared via the drainage course
A = the surface area to be drained, in m2
C = the run-off reference value/coefficient of discharge (see 6.3.4)
q = maximum rainfall, as defined in DIN EN 12056–3, DIN 1986–100 in l/(s x m2), or local re-
quirement
b = arithmetical run-off width in m; here b = 1 m
The efficiency of the materials used in the drainage course, as a function of the gradient and
course depth, is to be proven by the manufacturer in the form of a run-off rate in l/(s x m).
In the case of ductile drainage courses, evidence of the amount of water which runs off shall be
based upon the depth and the coefficient of permeability found for a 50-year load-bearing life, hav-
ing regard to the long-term performance of the material under stress. These figures are to be
quoted as a function of applied pressure. In the case of mineral aggregate materials, allowance
must be made for the fact that there will be a reduction in granular sizes due to the action of me-
chanical, physical or chemical factors.
42
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
prevent the vegetation support course from becoming waterlogged and to ensure that excess wa-
ter can be drained away without any difficulty, sufficient dry space must be left above the ceiling
level for said artificial water table.
7.2.7 pH-value
Where drainage courses are constructed using aggregate materials, account needs to be taken of
the pH, in conjunction with the needs of the vegetation and of the properties of the support course.
Therefore, the objective should be to achieve a similar ph-value for the drainage course as for the
vegetation support course (see 9.2.9).
As a rule the ph-values for the drainage course should be set as follows:
– Intensive greening pH 5,5 – 8,0
– Extensive greening
– multiple-course structure pH 6,5 – 8,0
Special forms of vegetation, such as special humus rooting plants, may need a low pH value.
In the event that the soluble salt content in extracted water exceeds the prescribed limit, an addi-
tional test shall be carried out to determine the salt content in the extract with saturated gypsum
solution, the result of which shall then be used to make an assessment.
With reference to the potential risk of environmental pollution due to the leaching of salts, the aim
should be to achieve a content of 1,0 g per litre, regardless of the type of greening which is being
carried out.
7.3 Construction
Materials are to be laid with an even surface, having regard to the roof gradient, any irregularity
which may be present on the roof, also any specific structural requirements with regard to the sur-
face layer. A tolerance of ± 1 cm from level is permitted over a measured length of 4 m. The mini-
mum course depth must be respected throughout. Addition of further courses shall not be allowed
to interfere with the drainage function.
Where drainage matting and boards are used, the evenness of the surface will match that of the
roof in both type and extent. Where the roof gradient is < 2 %, appropriate action shall be taken to
smooth out any unevenness.
Where aggregate-type materials with sharp edges or pointed shapes are used, or where the use of
rigid plastic drainage components is involved, resulting in the generation of pressure at the edges,
there is the risk that fairly high levels of mechanical stress will be applied to the damp-proof lin-
ing/root-penetration barrier and a protective lining may be required (see 5.3).
43
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
8 Filter Course
Nonwoven fabrics consist of aligned or randomly laid fibres of any length. These fibres may be
bonded using a mechanical, chemical or thermal process, or a combination of the three.
Where nonwoven fabrics are affixed mechanically with pins, they must be detector-proofed.
8.2 Requirements
In accordance with the “Code of Practice governing the use of geotextiles in earthworks” (TL Geo-
tex E–StB 95), note must be taken of the following characteristics:
– Environmental compatibility (see 4.11)
– Plant compatibility / absence of any risk of phytotoxicity (see 4.12)
– Behaviour under fire (see 5.9)
– Weight per unit of surface area (see 8.2.1)
– Cut-through resistance (see 8.2.2)
– Effectiveness of mechanical filtration / aperture width (see 8.2.3)
– Susceptibility to root penetration (see 8.2.4)
– Resistance to weathering (see 8.2.5)
– Resistance to soil-borne solutions and micro-organisms (see 8.2.6)
– Tensile strength, flexibility, coefficient of friction (see 8.2.7)
For roof-greening purposes, the depth and composition of the vegetation support course (see
9.2.1) dictate that filter courses with an effective aperture width O90,w < 0,2 mm are adequate.
44
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
8.3 Construction
Sheets of nonwoven fabrics laid as filter courses must overlap by a minimum of 10 cm and they
must be brought up at the edges to beneath the surface of the vegetation support course.
Nonwoven fabrics must be covered over within one week of installation. Until this has been done,
they must be protected against wind-generated negative pressures.
Drainage matting lined with nonwoven fabrics which are brought upwards at roof edges or which
abut onto vertical structures must be provided with permanent weather-proofing.
Where a reservoir-type watering system is to be installed, care must be taken to ensure that con-
struction work does not result in a reduction at any point in the volume of the dry space. The filter
course must not be permitted to come into contact with the surface of the water when the artificial
water table is at the maximum height.
45
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In regard to requirement relating to the proportions of organic content the following differentiation is
made:
– substrates with an apparent density of ≤ 0,8, and
– substrates with an apparent density of > 0,8
both in dry condition.
The materials and dimensions chosen for this course will be determined by local construction re-
quirements and by objectives for the vegetation.
In a layered superstructure where the depth of the vegetation support course is 35 cm, or there-
abouts, or greater, a distinction needs to be made during cultivation between an upper substrate
and an entirely non-organic lower substrate.
Where extremely thin courses are used, vegetation matting can also act as the vegetation support
course. When laid on a substrate course, this arrangement is classified as a type of greening (see
11.1).
Substrates for vegetation matting shall be consistent with the group of mineral aggregate mixtures
with a low organic content. In terms of composition and granulometric distribution, they differ from
the mixtures installed as a course.
46
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
9.2 Requirements
Attention shall be paid to the following properties, depending upon the type of greening which is
being undertaken, in respect of vegetation support courses:
– Environmental compatibility (see 4.11)
– Plant compatibility (see 4.12)
– Behaviour under fire (see 5.9)
– Granulometric distribution (see 9.2.1)
– Mineral content by volume (see 9.2.2)
– Frost-resistance (see 9.2.3)
– Structural and bedding stability of aggregate-type materials (see 9.2.4)
– Behaviour of matting under compression (see 9.2.5)
– Water permeability (see 9.2.6)
– Maximum water capacity (see 9.2.7)
– Air content (see 9.2.8)
– pH value (see 9.2.9)
– Salt content (see 9.2.11)
– Nutrient content (see 9.2.12)
– Adsorptive capacity (see 9.2.13)
– Seeds capable of germination / plant parts (see 9.2.14)
– Proportion of foreign substances (see 9.2.15)
Total pore volume is not one of the reference values, but it is used to determine the air content at
maximum water capacity and at pF 1.8.
An approximate idea as to the volume of water available to the plants may be derived from the
maximum water capacity minus a quantity of approximately 10 - 15 % to cater for the water held in
the fine pores at pF > 4.2.
As a rule, requirements in respect of vegetation substrates relate to the condition after it has been
compacted to the defined laboratory standard.
Details of the type and scope of standard suitability and inspection tests are set out in Section 12.
In vegetation substrates for intensive greening the clay and silt content should not exceed the fol-
lowing figures:
– clay (d < 0,002 mm) 3 – 10 % by mass
– silt (d = 0,002 up to < 0,063 mm) 10 – 17 % by mass
The largest grain size at flat green-roof sites should show the following figures depending on the
depth of the vegetation support course:
– up to 10 cm d = 10 – 12 mm
– more than 10 cm d = up to 16 mm
47
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Fig. 1: Granulometric distribution range for vegetation substrates used at intensive greening
sites
90 10
80 20
70 30
60 40
50 50
40 60
30 70
20 80
10 90
0 | | | | | | | | | | | | | | | | | | | | 100
0,001 0,002 0,006 0,01 0,02 0,06 0,1 0,2 0,6 2 6 20 60 100
Grain diameter d in mm
90 10
80 20
70 30
60 40
50 50
40 60
30 70
20 80
10 90
0 | | | | | | | | | | | | | | | | | | | | 100
0,001 0,002 0,006 0,01 0,02 0,06 0,1 0,2 0,6 2 6 20 60 100
Grain diameter d in mm
48
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
90 10
80 20
70 30
60 40
50 50
40 60
30 70
20 80
10 90
0 | | | | | | | | | | | | | | | | | | | | 100
0,001 0,002 0,006 0,01 0,02 0,06 0,1 0,2 0,6 2 6 20 60 100
Grain diameter d in mm
A greater proportion of organic matter may be required where special forms of vegetation, such as
humus rooting plants, are used.
Amounts of settlement permitted once construction work has been completed, as a result of the
weight of the superstructure, effects of water, transformation processes or loads applied during
upkeep of the site, should be as shown below:
– where the depth of the course is 50 cm or less, no more than 10% of the nominal depth, and
– where the mean depth of the course is over 50 cm, no more than 5 cm.
49
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
It is found as the water filtration rate mod. Kf and the figures should be as shown below for aggre-
gate mixtures and aggregate-type materials once they have been compacted and for substrate
boards once they have been installed
– at intensive greening sites ≥ 0,0005 cm/s or ≥ 0,3 mm/min
– at extensive greening sites
– multiple-course construction ≥ 0,001 cm/s or ≥ 0,6 mm/min
– single-course construction ≥ 0,1 cm/s or ≥ 60 mm/min
The maximum water capacity should not exceed 65% by volume in order to avoid waterlogging.
If the figure which is found is lower than that shown, the air content at pF 1.8 shall also be used in
making an assessment.
9.2.9 pH value
In the vegetation support course the pH value has to be adjusted to the needs of the vegetation. In
vegetation substrates the following pH values should be kept:
– at intensive greening sites pH 5,5 – 8,0
– at extensive greening sites
– multiple-course construction pH 6,5 – 8,0
– single-course construction pH 6,5 – 9,5
50
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Having regard to the demands of the vegetation any drop of the pH value in the substrate below
the admissible range after the installation is to be avoided.
Special forms of vegetation, such as special humus rooting plants, may need a fairly low pH value
of ca. 5,5.
In the event that the soluble salt content in a water extract exceeds the prescribed limit, an addi-
tional test shall be carried out to determine the salt content in the extract with saturated gypsum
solution, the result of which shall then be used to make an assessment.
With reference to the potential risk of environmental pollution due to the leaching of salts, the aim
should be to achieve a salt content which is as low as possible.
Where plants, such as special humus rooting species, which are sensitive to salt are used at inten-
sive greening sites, the salt content shall not exceed 1.0 g per litre.
Any possibly necessary additional nutrient supply by means of fertilizing should only be carried out
after greening or during final care with suitable fertilizing agents (see 11.5). In the context of matu-
ration and follow-up care further nutrients may be added, if required.
51
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
9.2.14 Content in respect of seeds capable of germination and of plant parts capable of
regeneration
The materials used initially to assemble the vegetation substrate should contain no living plants,
nor any plant parts which are capable of regeneration, particularly rooting weeds. Where soils are
used in vegetation substrates, it makes sense to use under-soil rather than topsoil in order to
avoid, as far as possible, the risk of importing seeds which are capable of germinating.
The basic materials which go into the preparation of vegetation substrates need to be protected
against the inclusion of seeds right from the time when they are collected and prepared. In addi-
tion, vegetation substrates need similar protection whilst they are being manufactured or in stor-
age.
9.3 Construction
Unless soil modelling is planned, the vegetation support course will, as a rule, be installed parallel
to the underlying courses. The prescribed minimum depth must be respected throughout.
Vegetation support courses made from soil mixtures, aggregate mixtures and aggregate-type ma-
terials shall be moistened to ground humidity levels.
Where soil or aggregate mixtures are used, the specific required depth for the material in question
after laying shall be achieved by compacting. Allowance needs to be made for the possibility of
slumping when setting the dimensions for the course. Hereby ATV DIN 18320 must be respected
which stipulates that vegetation support courses have to be determined in settled condition at the
time of the acceptance and on all contract locations.
Substrate boards shall be protected against wetting through and laying shall be performed in dry
condition.
A permanent watering arrangement may be used, if necessary, to keep the vegetation support
course damp, so as to stop the surface from drying out and to prevent wind erosion. If there is a
lengthy interval between installation and greening, additional preventive measures may be needed
to prevent erosion. Areas planted with shrubs and coppices may be mulched with suitable materi-
als after planting to protect them.
All values defined for granulometric distribution (see 9.2.1) do not only apply in terms of substrate
suitability tests but also in installed condition. If substrates are blown onto the roof by means of a
silo vehicle, changes in the granulometric distribution may occur depending on the source material.
To a limited extent this effect can be counteracted by adding higher proportions of larger grain
sizes already in the substrate manufacturing process.
52
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
10.2 Requirements
10.2.1 Sowing seed
Sowing seed must comply with DIN 18917. Depending on the type of greening which is being car-
ried out and upon the form of vegetation used, certified, standard, commercial or standby sowing
seed may be used.
At intensive greening sites, the most suitable standard seed mixture (SSM), in the most up-to-date
form, must be used for grassing. In the case of simple intensive greening sites, it may be neces-
sary to use seed mixtures which fall outside these norms. The “Descriptive Catalogue for Lawn
Grasses” issued by the German Federal Plant-Breeds Agency will have to be consulted when se-
lecting special breeds.
For extensive greening sites involving the use of grass and herbaceous plants, the standard seed
mixture RSM 6.1 may be used. Where different forms of cultivation are to be used for the vegeta-
tion, blends tailored to the planting location and the site will have to be prescribed for sowing or
topping up plant density.
10.2.3 Shrubs
Shrubs are subject to DIN 18916 and must therefore comply with the “Quality Specifications in re-
spect of Shrubs”.
At roof-greening sites, care must also be taken to ensure that the clump height is in keeping with
the depth of the vegetation support course. Shrubs grown on cohesive soils are not suitable for use
at green-roof sites.
Plants grown for extensive greening sites need to be brought on robustly, being fertilised with only
moderate amounts of nitrogen, and they must be hardened off adequately. They must not come
straight from a nursery greenhouse.
Before wild varieties are used at extensive greening sites, evidence must be provided to show that
they have come from a nursery and not from the wild.
53
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Where bulbous plants are used at extensive greening sites, evidence will be required to show that
they have come from a nursery and not from the wild.
In the case of bulbous plants for extensive greening sites which have been grown as merchandise,
varieties with small or flat clumps are preferable. The plants themselves should be grown in sub-
strates consisting mainly of mineral substances.
10.2.5 Coppices
Coppices must comply with DIN 18916 and thus with the “Quality Conditions governing Tree Nurs-
ery Plants”.
Clumps must be free of any alien vegetation, particularly of those species which generate rhizomes
and runners.
At green-roof sites, it is recommended that nursery contracts be used, specifying substrate types,
clump heights and cultivation arrangements.
Where simple intensive greening is being carried out at a site where there is a risk of drought con-
ditions or where extensive greening is being carried out with an adequate course depth, landscap-
ing turf types of an appropriate SSM quality may be used. Additional herbaceous plant seed may
be added, to SSM standards, provided that this does not include any leguminous varieties. No clo-
ver species may be used in lawn turf.
Lawn turf for roof-greening must be laid on a sandy soil containing light to moderate amounts of
humus.
Vegetation matting must be of a uniform depth and must be of a design which ensures that no
cavities are left when it is laid.
Action must be taken during cultivation to harden vegetation off. Vegetation matting must not be
brought straight from a nursery greenhouse. The presence or absence of shoot parts which have
54
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
developed in an appropriate manner for the variety of plant concerned, also of short spaces be-
tween leaf nodes, will indicate whether or not plants have been hardened off.
The stock of varieties to be used for a given form of vegetation (see 2.2.4) will need to be speci-
fied, with details of the quantities of mosses, succulents, grasses, herbs and bulbous plants re-
quired.
Plans for the site should allow for no less than 75 % total ground cover, with no more than 20 % of
the total available space being left for some other form of cover.
The amount of substrate filling material lost during collection, transport and laying must not exceed
3 % of the total surface area. In addition, the size of any area without substrate filling material must
not exceed 30 cm² and there must be no more than 10 such areas for every m² of vegetation mat-
ting. A greater number of spaces may be left, provided that they are of fairly small proportions, but
the combined area of these spaces must not exceed 3 % of the total covered area.
55
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
11.1 Greening
Greening procedures must be appropriate to the biological characteristics of
– individual plant varieties
– the different forms of vegetation, and
– the objective, in terms of greening quality.
11.2 Execution
Depending on the type of greening procedure execution has to be in compliance with DIN 18916,
DIN 18917 or DIN 18918.
56
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Bracing and anchoring give coppices temporary stability, assuming that the courses have at least
the minimum prescribed depths and that there is an adequate volume of soil in which the roots can
take hold.
Whilst anchoring and bracing is in use, it needs to be checked at regular intervals for signs of con-
traction, compression or shearing.
11.3.2 Bracing
The best means of bracing is a corrosion-proof wire or cable brace attached directly to the building
by means of a detachable screw-type fastening which fits onto threaded anchors made from high-
grade corrosion-proof steel, these being fitted above the damp-proof lining. The individual wire and
cable braces will need to be fitted with tensioning devices. Where conditions are suitable in terms
of the construction and of static loads, braces may be attached to structural components such as
border surrounds, walls and large paving slabs. Alternatively, they may be attached to isolated
anchor points, such as paving slabs set into the layered superstructure, but care must be exercised
in such cases to ensure that, in doing so, the limits for load-bearing structural components and/or
the thermal insulation and damp-proof lining on the roof are not exceeded. The angle between
braces attached to isolated anchor points and the surface of the roof ought not to exceed 60°.
Until such time as the roots from the vegetation stock have worked their way into the layered su-
perstructure, the vegetation support course, plants and sowing seeds are at risk from the effects of
water and wind. The following preventive measures need to be put in place to counteract the risk of
damage
– appropriate specifications in respect of the layered superstructure
– temporary measures, and
– special measures for places subject to extreme conditions.
The specifications mentioned above in respect of the layered superstructure relate to:
– the use of stable vegetation substrates capable of withstanding high loads, even when dry
– application of additional hard stone chippings, acting as a mulch course, on top of finely-
structured vegetation substrates, and
– ensuring that plant varieties and forms of vegetation and plant-breeding are selected appropri-
ately for the positions which they occupy, offering fast and lasting ground cover.
57
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Special action is required at sites which are particularly exposed to the wind and on roofs which
slope at a steep angle:
– use wet seed, or
– cover the area to be treated with ready-grown vegetation matting.
The degree of risk of substrate erosion by the wind should not be assessed on the basis of wind
speeds but on specific drift rates for individual materials.
Where substrates are at risk from erosion, greening at roof edges and in places which are particu-
larly susceptible to drifting needs to be carried out with vegetation mats or honeycomb reinforce-
ment blocks.
58
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Additional fertilisation should be carried out on the basis of the amount of nutrient in the substrate
and of the greening objectives. During initial and subsequent fertilisation, it is recommended that
nutrients be administered by means of coated NPK slow-release fertiliser capsules, at the rates
shown below
– Intensive greening sites 8 g N/m2 (pure nitrogen)
– Extensive greening sites 5 g N/m2 (pure nitrogen)
Where alien vegetation is present in excessive amounts and/or where it poses a threat, deep cut-
ting and removal of the material which is cut out can keep the problem in check.
If the client abstains from placing a final care order to the contractor, acceptance is performed im-
mediately after planting and/or seeding or spreading of the shoot parts.
59
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
– upon termination of all damp-proofing works, as far as the order contains both roof damp-
proofing and roof greening
– upon termination of the construction of the vegetation course, if planting and sowing activities
cannot be carried out immediately afterwards
In addition to and/or opposed to what is laid down in ATV 18320 gaps of less than 2,5 m² individual
surface are not deducted from the total surface of sowing or spreading of shoot parts.
Where extensive greening is being carried out, the care objectives and the individual tasks which
will need to be performed will be tailored on a site-by-site basis to the process used for greening
and to the form of vegetation used. This also applies, to some extent, to simple intensive greening
sites. The foregoing does not, in any way, affect damp-proofing checks which have to be carried
out.
For both intensive and extensive greening sites, it is strongly recommended that contractual ar-
rangements, stretching beyond the guarantee period, be made by the garden and landscape archi-
tects who plan and supervise the work, and/or by the contractor. These will cover maintenance
under expert supervision and will set out long-term aims and objectives.
During all works on roofs with a fall height of more than 3 m protection against falling is required
and the corresponding regulations governing the accident prevention have to be respected (see
4.7).
Where façade cleaning is required, the vegetation and layered superstructure will need to be pro-
tected against harmful substances before work starts.
11.7.2 Care during maturation and subsequent upkeep for extensive greening sites
Upon termination of the final care and acceptance a natural development dynamics in the forma-
tion of vegetation sets in on extensive greening sites. This process may be influenced only to a
limited extent by care measures, e.g. cutting of plants or eliminating of individual plants. Immigrat-
ing, high-growing species which risk to replace the desired varieties, e.g. some leguminoses (fa-
baceae) should be removed at an early stage.
Care of the scheme during maturation, after handover upon completion of the preparation period,
will continue for a limited time, until roughly 90 % ground cover has been achieved. At extensive
greening sites, this period may last for up to two years, depending on the process used for green-
ing and on how far development of the site has advanced. Feeding will form part of the work car-
ried out during this period, particularly in the case of vegetation substrates at single-course sites.
As a rule, maintenance at extensive greening sites consists of nothing more than one or two in-
spections per annum.
The list of individual tasks to be carried out as part of care during and after maturation at extensive
greening sites includes:
– feeding with nutrients
– removal of alien coppice material and other unwanted vegetation
– pruning / thinning
– infill seeding to deal with sizeable bare patches
60
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In the case of extensive greening, additional feeding should only be carried out during the fixed-
term period of cultivation during maturation, for which purpose it is recommended that a slow-
release fertiliser capsule be used to give an annual dose of 5 g N/m².
In case of construction forms which are poor in nutrition, e.g. single-course and thin-layered con-
structions, it may be necessary to carry out follow-up feeding in intervals of several years in order
to achieve the desired vegetation and blooming aspect.
Any deposits which form in gravel strips at joints and borders, also in gravel chippings laid on
equipment, interfering with the way in which they work will have to be removed at intervals which
can run to several years.
If after this period of limitation for contractual warranty any defects are identified (e.g. loss of
plants) the client is entitled to claim warranty only if the defects are due to faulty services provided
by the contractor.
61
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
12 Testing
As a rule, materials are checked to ensure that they have the requisite properties and this involves
the suitability and inspection tests listed in the following tables:
– Tab. 5 for drainage courses, and
– Tab. 6 for vegetation support courses.
This has no bearing whatsoever on the need for in-house supervision by manufacturers.
Test and investigation reports on the outcome of suitability and inspection tests carried out on ag-
gregate materials for drainage courses and on vegetation substrates shall compare actual figures
with reference values, in the form shown in Tables 7, 8. 9 and 10 and shall include an assessment.
In doing so, allowance needs to be made for pre-determined site-specific departures from standard
values. All reports have to include the materials composition.
Tab. 5: Evidence related to the properties of materials used in drainage courses in the context of
suitability and inspection testing
Granulometric distribution N N – –
Frost resistance Z – – –
Structural and bedding stability Z – – –
Behaviour under compression – – N –
Water permeability N – N –
Capacity to store water/
N – N –
Maximum capacity
pH value N N – –
Salt content N N N*) –
Plant compatibility/
Z/N*) – Z/N*) –
Absence of any risk of phytotoxicity
*) *)
Environmental compatibility Z/N – Z/N –
Behaviour under fire – – N*) –
Compatibility of materials – – N*) –
N = Proof required
Z = Assurance required on the basis of several years’ experience and/or of in-house supervision
*) = May need to be verified by means of testing in accordance with standards and guidelines currently in force
62
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Tab. 6: Evidence related to the properties of vegetation substrates in the context of suitability and
inspection testing
63
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Requirements Finding
Properties
Unit Reference value
Granulometric distribution
– proportion of slurry-forming components mass % ≤ 7
(d < 0,063mm)
Apparent density (volume weight) 1)
– when dry g/cm3 –
– at maximum water capacity g/cm3 –
Water and air management
– total pore volume 2) Vol.–% –
– maximum water capacity Vol.–% –
– water permeability mod. Kf cm/s > 0,3
mm/min > 180
– maximum run-off 2) l/(s x m) –
pH value, salt content
– pH value (in CaCl2)
– at intensive greening sites 5,5 – 8,0
– at extensive greening sites, multi-course 6,5 – 8,0
– salt content (gypsum extract) 3)
– at extensive greening sites g/l < 3,5
– at intensive greening sites g/l < 2,5
– salt content (gypsum extract) 4)
– at extensive greening sites g/l < 2,5
– at intensive greening sites g/l < 1,5
1) No requirement
2) Separate evidence where necessary
3) The value should be as low as possible
4) Where needed
64
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
65
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
66
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
67
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Mineral aggregates
Gravel 4/8 – 8/16 16 – 18 0,16 – 0,18
Lava 2/8 – 8/16 11 – 14 0,11 – 0,14
Pumice 2/8 – 4/12 11 – 12 0,11 – 0,12
Expanded clay, uncrushed 4/8 – 8/16 5– 6 0,05 – 0,06
Expanded slate, uncrushed 4/8 – 8/16 6– 7 0,06 – 0,07
Expanded clay, crushed 2/8 – 4/ 8 6– 8 0,06 – 0,08
Expanded slate, crushed 2/8 – 4/11 6– 8 0,06 – 0,08
Recycling aggregates
Brick hardcore 4/8 – 8/16 10 – 13 0,10 – 0,13
Slag n. b. n. b. n. b.
Foamed glass 10/25 2,5 – 3 0,025 – 0,03
Drainage matting
Textured nonwoven fabrics 1,0 5,6 – 7,5 0,056 – 0,075
Studded plastic matting 1,2 2,1 – 2,3 0,021 – 0,023
Fibre-type woven matting 1,0 2,2 – 2,3 0,022 – 0,023
Fibre-type woven matting 2,2 2,2 – 2,3 0,022 – 0,023
Flock-type foam matting 3,5 5,6 – 5,9 0,056 – 0,059
Drainage boards
Studded rubber boards 2,0 11,0 – 13,0 0,110 – 0,130
Foam-type drainage boards (NR) 5,0 1,8 – 2,5 0,018 – 0,025
Foam-type drainage boards (NR) 6,5 2,0 – 2,8 0,020 – 0,028
Shaped hard plastic boards (R)1) 4,0 19,0 – 21,0 0,190 – 0,210
Shaped hard plastic boards (R)1) 6,0 24,0 – 26,0 0,240 – 0,260
Shaped foam-type drainage boards 6,0 16,0 – 18,0 0,160 – 0,180
(R)1)
Shaped foam-type drainage boards 8,0 24,0 – 27,0 0,240 – 0,270
(R).1)
Shaped foam-type drainage boards 10,0 33,0 – 36,0 0,330 – 0,360
(R).1)
Shaped foam-type drainage boards 12,0 44,0 – 46,0 0,440 – 0,460
(R)1)
68
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Tab. 12: Design load at maximum water capacity for vegetation substrates, substrate boards
and vegetation matting
69
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
13.3 Vegetation
Tab. 13: Surface loads generated by various forms of vegetation
70
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
It is recommended that the following layout be adopted when preparing investigation reports:
1. Execution
Give details of: the client and/or the contractor who carried out the work; the type of sample
taken and the quantity of material involved; delivery and inspection dates, along with manufac-
turer’s material specifications for the materials used and as identified by visual or manual in-
spection.
2. Methods
Give brief details of the methods used during the inspection.
3. Findings
Set out mean figures in tabular format.
4. Evaluation
Give a verbal opinion, using the requirements set out in tables 7-10 as a framework and using
the granulometric distribution ranges shown in Figs. 1-3 in the “Roof-greening guidelines, edi-
tion 2002”.
Except where shown in the appendix, method descriptions are to be taken from the following
publications:
– VDLUFA Methodenbuch [The VDLUFA Methods Handbook], Vol. 1. Soil investigations. 4th
edition (1991) with appropriate addenda.
– DIN Standards (latest version).
– ÖNORM Standards (latest version).
– HARTGE, K.H. u. R. HORN: die physikalische Untersuchung von Böden [Physical exami-
nation of soils]. 2nd edition (1989).
1
FLL “Roof-greening“ Working Party, “Investigation methods“ working group: Prof. H.-J. Liesecke, Hano-
ver (Chairman); Prof. Dr. P. Fischer, Freising; Prof. Dipl.-Ing. G. Lösken, Hanover; Dr. L. Nätscher, Freis-
ing; Dipl.-Ing. P. Siegert, Tornesch.
71
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
DIN 19683
A procedure for carrying out soil in-
vestigations for water engineering pur-
poses in agriculture. Part 4: Physics
laboratory investigations: Determina-
tion of the water content in soil
Total pore volume VDLUFA Bulletin 6/1970 This procedure cannot be used for
GPV Pages 126–128, with correction substrates which contain organic-
6/1971, synthetic foam type materials.
Page149
Simplified determination of pore
[Vol. %] volume using the FEIGE method
72
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Water binding HARTGE, K.H. u. R. HORN (1989) Used to determine the volume of air in
at pf 1,8 – 10.2 Vacuum method, substrates for multiple layer sites.
pp. 86 – 93
– 10.3 Pressurised method,
[Vol. %] pp. 94 – 98
Air volume
– at WKmax – Difference between total pore
volume and water content at
maximum water capacity
DIN 19684
A procedure for carrying out soil in-
vestigations for water engineering
purposes in agriculture. Part 1:
Chemistry laboratory investigations:
Determination of the pH value in soil.
73
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
74
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
C/N ratio VDLUFA A 2.2.1 The C/N ratio is the quotient of organic
Determination of total nitrogen using C [% TS] and total nitrogen
the Kjedahl method (N) [% TS].
75
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Kilner jar test (using VDLUFA A 10.2.2 Where there is any doubt, this is to be
the Dr. Scholl method) Evidence of the presence of gas- carried out in addition to the germina-
forming phytotoxic substances in the ting plant test.
ground and in cultivation media for
horticultural use
Supplement 2002
76
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Appendix
2.2 Apparatus
– cylindrical plastic containers with an inside diameter of 150 mm and a height of 165 mm,
with a base perforated in the manner defined below:
Radius interval 15°
Perforation perimeter spacing 10 mm
Perforation diameter 5 mm
Number of perforations: centre 1 x 1 = 1
90° intervals 4 x 7 = 28
30°/60° intervals 8 x 6 = 48
15°/45°/75° intervals 12 x 4 = 48
125
– screening: 0,6 mm mesh wire, diameter 148 mm
– 7 mm steel plate, diameter 148 mm (proctor compaction test as per DIN 18127)
– proctor hammer, 4,5 kg drop weight, 450 mm drop height (proctor compaction test as per
DIN 18127)
– plastic dry dishes heat-resistant to 150° C, with a diameter of app. 30 cm
– drying cabinet
– scales, accurate to within 0,1 g
2.3 Determination
Estimate visually/manually how cool/moist the test material is (it must not be wet), determine the
water content and identify this as the test water content. Where water is added, the sample
must be left for at least 3 hours under air-tight conditions before any further work is done with it,
in order to ensure even moistening throughout the sample.
Weigh the cylindrical container with the wire mesh inserted in it, then, with the perforated base
covered over with the wire mesh, fill to a depth of between 120 mm and 140 mm with a quantity
of the material under examination, which must be cool / moist. The container is filled to a level
which will ultimately leave a depth of 100 mm or thereabouts after compaction. Place the steel
plate over the top of the material with which the container is filled and then strike 6 times with
the Proctor hammer to compact it. Find the depth of the sample in its compacted state by mak-
ing four cross-wise measurements from the upper rim of the cylinder to the surface of the sam-
ple and then subtracting the result from the internal height the cylinder. The sample volume may
then be calculated using the formula π x r² x h . Find the weight of the container plus the sam-
77
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
ple, from which the weight of the container plus the fitted wire mesh is then subtracted to give
the weight of the sample.
Apparent density at maximum water capacity is to be determined immediately after said maxi-
mum water capacity has been found (see 3.). Check the height of the sample so as to take ac-
count of any swelling which may take place. Find the volume and weight of the sample, as de-
scribed above. In order to determine apparent density in a dry condition, once apparent density
at maximum water capacity has been determined, along with water permeability, place the
sample in dry dishes of known weight and dry at 105°C. Find the weight of the sample plus the
dish, then subtract the weight of the dish from the resulting figure to give the dry weight for the
sample.
2.4 Calculation
Calculate apparent density under moist conditions (Sf) using:
mvf [g/cm3]
Sf =
V
mvf = mass (weight) in g in moist condition
Calculate apparent density at maximum water capacity (Swk) using the formula:
mwk [g/cm3]
Swk=
V or Vwk
Calculate apparent density under dry conditions (St) using the formula:
mf [g/cm3]
St =
V
Testing is to be carried out in three parallel tests on the same samples and in the sequence
shown above. The result is to be expressed as a mean figure in each instance.
3.2 Apparatus
– see 2.2
– plastic channels with a depth of at least 200 mm for immersion
– spacers, roughly 10 mm deep, to allow water ingress through a perforated base
– 148 mm diameter nonwoven fabric filters to cover the top of the sample
– 0,6 mm gauge 148 mm diameter wire mesh to cover the top of the sample
– 100 x 100 mm concrete sett as a weight to rest of top of the sample
– plastic bowls to allow the water to drip away, with drainage channels on top of them, made
from spherical pieces of bonded foam and measuring at least 50 mm in depth.
78
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
3.3 Determination
Place the fabric filter and wire mesh on top of the materials inside the cylindrical vessels (see
2.3) and then weight these down with pieces of sett so as to prevent the contents from rising.
Place the vessels in plastic bowls and fill slowly with water until the level reaches approximately
10mm below the top of the test sample. Dampen the surface of the test sample thoroughly and
then add more water until the level is 10 mm above the top of the test sample. Add more water,
if necessary, in order to maintain the latter level. After the test sample has been totally im-
mersed for 24 hours, remove the vessels and place them on top of the draining boards posi-
tioned over the plastic basins, where they are to be left for two hours whilst the water drips out.
At the end of this period, dry the vessels thoroughly, remove the cover from the top of the test
sample and find the combined weight of the vessel plus the test sample, subtracting the known
weight of the cylinder (see 2.3) to work out the weight of the test sample. Check the volume of
the test sample (see 2.3), then, having determined water permeability (see 4.) in the manner
described in 2.3, dry the test sample at 105°C and find the weight.
The water content in g / cm³ of the compacted test sample will be found from the difference
between the mass (weight) at maximum water capacity and the corresponding figure with the
test sample in a dry condition.
3.4 Calculation
4.2 Apparatus
– see 2.2 and 3.2
– annular test prods: wire ring, diameter approximately 40 mm, with tow test prods attached
vertically to it, these being 45 mm and 35 mm in length.
4.3 Determination
As soon as the maximum water capacity has been determined, cover the surface of the test
sample with wire mesh, place the annular test prod on top and then fill the cylinder carefully
from the top until the surface of the water is between 10 and 20 mm above the top of the test
sample. Add water continuously as the water level drops, in such a manner as to maintain the
total immersion depth. Measurement actually commences as soon as water begins to flow
evenly out of the perforated base. Fill with water until the surface is above the tip of the upper
test prod. Observe the water as the level drops and note the time taken for it to drop from tip of
the upper test prod to that of the lower one, in other words, from 45 mm to 35 mm.
Determination can be carried out in 3 parallel tests, as described in section 2 above; the
measurement is to be repeated 3 times in each case.
79
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
4.4 Calculation
1 h [cm/s]
mod. Kf = x
t h + 4,0
Supplement 20022
5 Determination of the run-off reference value/coefficient of discharge C (ψ)
5.1 Principle
Determination of the run-off reference value/coefficient of discharge by means of determination
of the water run-off from a course construction of a roof-greening with 2 % drainage gradient
during a 15-minutes block rain of
r = 300 l / (s x ha) ^ 27 l/m² after previous irrigation which saturates the course and which is
then left to drip away over a 24-hour period.
5.2 Apparatus
– wind and rain protected testing hall to mount the test equipment
– testing table of 1 m width, with side barriers according to the construction depth of the roof-
greening system to be tested, screening grids with a ca. 3 mm wire mesh at the end of the
run-off, variable gradients, water-permeable sealing, drip channel or outlet funnel at the end
of the gradient with outlet connection piece
Optional flow lengths of:
– 10 m with correction factor 1,0
– 5 m with correction factor 0,72
– 2,50 m with correction factor 0,65
– irrigation facility consisting of a nozzle tube with constant and uniform distribution of the
block rain, if possible, to be mounted 60 – 80 cm above the layered superstructure to be exam-
ined, all-side foil protection in order to prevent drop drift, pressure reducer inside the supply
tube for the fine-tuning of the rain volume, water-meter precision instrument to monitor the rain
volume in dependence on time by means of a stopwatch or electronically
– measuring device to measure the run-off water volume in dependence on time:
– visually
– via collecting receptacle with water exchange indicator, or
– via a calibrated collecting receptacle, or
– via water-meter precision instruments
and monitoring of time by means of a stopwatch
– electronically
– by means of weighing, or
– via a water-meter precision instrument
and monitoring of volume and time by means of a data logger
2
Working Party “Determination of coefficient of discharge”: Prof. Dr. H.–J. Liesecke, Hanover (Chairman);
Dr. W. Kolb, Veitshöchheim; Prof. Dipl.–Ing. G. Lösken, Hanover; Dr. M. Marrett–Foßen, Tornesch; Prof.
Dr. St. Roth–Kleyer, Geisenheim; Dipl.–Ing. Chr. Schade, Groß–Ippener
80
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
5.3 Determination
Set a gradient of 2 % at the testing equipment. Installation of the roof-greening course construc-
tion to be tested in damp condition. Apply irrigation to saturate the course until a constant outlet
water flow is kept over a period of 10 minutes. Check that there is no drift of the irrigation. Leave
to drip away over a period of 24 hours in order to reach an approximate condition of maximum
water capacity. Apply block rain of 27 l/m² in 15 minutes, as constant as possible regarding its
intensity. Monitor the outlet water flow during the irrigation period in dependence on time.
5.4 Calculation
Calculate the run-off reference value/coefficient of discharge C (ψ) using the following formula:
The result is to be expressed as the mean from the three repeated measurements.
81
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Introduction
In order to exclude vegetation-dependant structural damage due to roof-greening, in 1984 a
“Procedure for investigating resistance to root penetration” was elaborated by a working group
team of The Landscaping and Landscape Development Research Society e.V. (FLL) which fo-
cused on the stress exerted on root protection barriers due to plant roots. The procedure is
mainly based on experience and findings gathered in tests carried out over a period of several
years with different damp-proof sheets and various plant varieties. All tests were executed be-
tween 1975 and 1980 at the Institute for Pedology and Plant Nutrition, Technical College (FH).
The FLL procedure was revised in 1992 and, for the last time so far, in 1995.
The procedure is highly acknowledged among manufacturer, planners and executing contrac-
tors which is also documented by the large number of already completed and still ongoing in-
vestigations.
In 1993 the FLL decided to re-examine the existing procedure with a test period of 4 years with
the aim to reduce the test period to 2 years without watering down the desired particularly strict
standards of the current tests.
After a series of tests at the Institute for Pedology and Plant Nutrition, Technical College Wei-
henstephan agreement was reached regarding the following requirements: the 2-year-test takes
place in a climate-controlled greenhouse in which the plant varieties put to the test will find a
test climate with temperature and light conditions which allow them to grow over the entire year.
Thus, an effective growth period of 24 months can be achieved, a similar duration as for the 4-
year test, when taking the yearly, several-months lasting dormant phase of vegetation in out-
door conditions into account. Both tests are considered to be equal and have been described in
the present new edition of the procedure.
In the course of changes regarding its content this edition has also been subject to editorial
changes in format in order to facilitate comprehension and to make it easier for the testing insti-
tutions to evaluate the test results obtained.
3
FLL Work Party “Roof-Greening“, team “Root-penetration barrier“: Prof. Dr. P. Fischer, Freising–
Weihenstephan (Chairman); Dipl.–Ing. R. Bohlen, Ladbergen; R. Klein, Wächtersbach–Neudorf; Prof. Dr.
H.–J. Liesecke, Hanover; Prof. G. Lösken, Hannover; Dipl.–Ing. P. Siegert, Tornesch; Dipl.–Ing. W. Te-
bart, München; Dipl.–Ing. R. Walter, Stuttgart
82
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
1 Area of validity
This procedure covers investigations into resistance to root penetration of roots and rhizomes of
different test plants in
– root protection barrier sheeting
– roof and damp-proof lining sheets, and
– liquid surface treatment materials
for all types of roof-greening (intensive greening, simple intensive greening, extensive green-
ing).
This procedure includes testing of products including all jointing techniques linked to them.
Therefore, it is admissible only for testing purposes related to individual sheeting and/or surface
coating. No examination of an entire roof protection system, i.e. of a protection course consist-
ing of several layers for roof protection purposes, can be effected.
For reasons related to the testing procedure it may be necessary to apply a separate course
underneath the surface treatment in order to test coating products using liquid surface treatment
materials. This method is admissible as long as the manufacturer clearly guarantees that resis-
tance to root penetration is effected only by means of the top coating applied to the construc-
tion.
Any lamination, i.e. a separate layer on top of a sheeting and/or coating to be tested, has to be
excluded.
The findings for any sheeting and/or coating which has been tested cannot be transferred to
resistance to root penetration in relation to plants with strong rhizome growth (e.g. bamboo or
Chinese reeds varieties). When using these types of plants on top of a regular root penetration
barrier additional structural measures have to be taken and special care activities to be pro-
vided.
This procedure does not extend to investigations into environmental compatibility of any product
tested.
2 Definitions
For the application of this procedure the following definitions shall be applied:
83
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
The spreading of the couch grass at the substrate surface will be evaluated visually (in a valu-
ated way, see 2.7). Hereby, the plants in the trial containers have to show at least a medium
stock density (see 7.2).
In contrast to this combinations of bonding-free joints and joints with bonding glue or joints using
2 different types of glues are not considered to be equivalent.
84
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
If the testing institute has difficulties to clearly differentiate between rhizomes and roots, expert
consulting is required.
1
3
2
Fig. 1: Schematic representation of the couch grass rhizome (left) with knots (1),
roots (2) and leaves (3) as opposed to an ‘Orange Charmer’ root (right)
85
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
If during the test phase more than 25 % of the coppices are lost, the investigation has to be
started anew, i.e. new planting needs to be carried out. At the same time, the vegetation sup-
port course needs to be replaced by a new aggregate mixture. A new date has to be assigned
to the beginning of the test phase.
The same procedure shall be applied if during the test phase no sufficient root growth of the test
plants can be achieved (see 2.6).
During a 4-year test the examination is carried out in outdoor conditions where alders and
couch grasses are used as test plants. The 2-year test is carried out in a climate-controlled
greenhouse by testing ‘Orange Charmer’ and couch grass.
The sheeting and/or coating which needs to show several seams/joints and/or one work inter-
ruption joint is installed in 8 trial containers. 3 more receptacles without any sheeting or coating
are included into the test. They serve as control receptacles for plant growth.
A thin vegetation support course is laid into the pre-treated containers. With dense planting,
moderate fertilizing and modest watering the desired high root pressure will be obtained.
Towards the end of the investigation the vegetation support course is taken out of the recepta-
cle and an examination of the sheeting and/or coating is effected focussed on the detection of
any root and/or rhizome ingress or penetration.
Control samples of any sheeting and/or coating tested are stored at the test institute.
86
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Admissible as locations are also non-heated greenhouses as far as they provide sufficient
ventilation facilities and frost can take effect.
The natural light conditions in central-European regions ensure a favourable growth of the test
plants at the set temperatures throughout the entire year. Any shading of the plants in summer
or artificial lighting in winter is not required.
The space demand per receptacle (800 x 800 mm), respecting the required minimum distance
according to paragraph 6.1, amounts to ca. 1,5 to 2 m², depending on the arrangement of the
containers.
Trial containers are to be fitted with transparent bases (e.g. acrylic glass) so that root penetra-
tion can be detected even during the test phase without interfering with the vegetation support
course. The base of the container shall be darkened (e.g. by means of a foil which is impervious
to light), in order to avoid the growth of algae in the moisture course. Ideally, the transparent
container base will be a tray with a 20 mm raised rim to maintain a constant supply of water in
the moisture course. The water supply into the moisture course is effected by means of a filling
pipe. This pipes shall have a diameter of 35 mm and is mounted on the outside of the container,
pointing upwards and abutting onto the raised rim of the base tray (see Fig. 2).
800
250
35
*1
70
Fig. 2: Construction design of the trial containers (minimum dimensions, all figures in mm, *1
= transparent base with raised rim)
For each sheeting and/or coating to be tested 8 trial containers are required. In addition, per
experimental run – regardless of the number of sheets/coating to be tested – 3 control contain-
ers (without any sheeting/coating) shall be provided.
87
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
For the required course depth of (50±5) mm (see 6.1) the material demand comes to 32 l per
trial container (800 x 800 mm).
Add calcium carbonate to bring the pH value to figures between 5,5 and 6,5 (see 4.7).
The basic fertilization defined in paragraph 4.8 is mixed with the vegetation support course in a
homogenous way before filling the container.
In a 4-year investigation the substrate need comes to about 96 l per trial container (800 x 800
mm) with a required course depth of (150±10) mm, for the 2-year investigation to about 88 l per
receptacle (taking into account a substrate supply via plant earth-clumps).
Tab. 1: Required quality of expanded clay/slate. Determination with water extracted from the
ground material with demineralised water in a 1:10 (weight/vol.) ratio
4.7 pH settings
For the vegetation support course different quantities of calcium carbonate may be necessary in
order to set the desired pH value to 5,5 – 6,5.
– put the samples into a plastic bag, close them and label them
– store the samples in the bag for about 3 days at room temperature
– send the samples to a laboratory which works on the basis of the regulations of the
VDLUFA Association and ask them for a pH analysis in CaCl2
– extrapolate the quantity of calcium carbonate which has led to the desired pH value in the 1
l-sample to the entire volume of the vegetation support course
4.8 Fertilizer
As a basic fertilization a multiple-nutrient fertilizer with ca. 15% N, 10% P2O5, 15% K2O, 2 %
MgO and less than 0,5 % Cl as well as a fertilizer containing nutrient trace elements with Fe,
Cu, Mo, Mn, B and Zn shall be provided. Per container (800 x 800 mm) 30 g of a multiple-
nutrient fertilizer are applied. The fertilizer containing nutrient trace elements is used in the
quantity recommended for substrates by the manufacturer.
Use slow-release fertilizer capsules with ca. 15 % N, 10 % P2O5, 15 % K2O and a duration of
action of 6 – 8 months for the repeat fertilizing. The demand in fertilizers comes to 30
g/container (800 x 800 mm) per fertilization unit.
4.9 Tensiometer
In order to monitor watering of the vegetation support course per container a tensiometer with a
measuring range of 0 – 600 hPa has to be used.
For the 2-year investigation the following 2 plant varieties meeting the defined quality require-
ments shall to be used:
– Pyracantha coccinea ‘Orange Charmer’ – in a 2-litre container, height 60 – 80 cm
– Agropyron repens – couch grass, seeds
Per trial container with dimensions of 800 x 800 mm 4 coppices (alder, ‘Orange Charmer’) as
well as 2 g of couch grass seeds have to be set/applied. This leads to a calculated plant density
of 6,25 coppices/m² and 3,13 g seeds/m². If larger trial containers are in use, plant density has
to reach at least the figures indicated above by increasing the number of plants and the quantity
of seeds.
When buying test plants make sure that plant quality does not vary.
4.11 Watering
The water used for watering shall meet the minimum quality requirements listed in Tab. 2.
Please enquire details about the local water quality at the waterworks responsible for the supply
of the facility. If any of the values laid down in Tab. 2 is exceeded the water for watering needs
to be blended with fully desalinated water or with rain water.
Tab. 2: Minimum quality requirements for water used for watering purposes
89
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In order to ensure a clear identification of the tested product the following information needs to
be provided by the manufacturer before the test is started: product name, area of application,
material description, material standards, thickness (without lamination), finish/structure, form of
delivery, manufacturing technique, test certificates, year of manufacture, mounting/laying tech-
nique at the location of the investigation (overlapping, jointing techniques, jointing agents, type
of seam sealing, covering strips over seams, special corner and angle joints), admixture of bio-
cides (e.g. root inhibitors) with details regarding the concentration of the substance.
In addition, a product data sheet of the sheeting/coating to be tested has to be handed in for
retention at the test institute.
Moreover, for products consisting of several layers (e.g. bituminous sheeting with copper band
inlays or PVC sheeting with polyester nonwoven fabric inlays) the manufacturer has to define in
an unambiguous way before the start of the investigation which layer is meant to take over the
function of an ingress and penetration barrier.
6 Testing conditions
6.1 Preparation and installation of the 8 trial containers
The trial containers shall be prepared with the following layered superstructure (from bottom to
top): moisture course, protective lining, sheet and/or coating to be tested, vegetation support
course, planting.
Directly above the transparent base of the receptacle as bottom layer the moisture course is laid
with a depth of (50±5) mm.
The protective lining is cut to size based on the base area of the container and laid directly onto
the moisture course. On top of the protective lining the sheet/coating is applied as described in
paragraphs 6.1.1 and 6.1.2.
After the installation of the sheets/coating to be tested the vegetation substrate is filled in in a
compacted form and a course depth of (150±10) mm. This corresponds to a substrate volume of
96 l (4–year test) respectively 88 l (2–year test) (see 4.6) for a receptacle of 800 x 800 mm.
Per trial container of 800 x 800 mm and for a 4-year investigation 4 pieces of Alnus incana (grey
alder), for a 2-year test 4 pieces of Pyracantha coccinea shall be planted equally spread over
the entire surface (see Fig. 3). Furthermore, for both investigation types and per receptacle 2 g
of seeds of Agropyron repens (couch grass) are equally sawn onto the vegetation support
course.
If larger trial containers are necessary, the number of plants and the quantity of seeds needs to
be increased so that at least the same plant density is reached (see 4.10).
Place the ceramic cell of the tensiometers into the vegetation support course directly on top of
the sheet/coating. Thus measurements can be carried out in the lowest part of the root area.
The tensiometer shall be placed in a symmetrical distance with the plants (see Fig. 3).
90
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
It is advisable to place the receptacles on stands to facilitate root penetration checks in regular
intervals. Keep a minimum distance of 0,4 m between and around the different receptacles. Re-
ceptacles shall be allocated at a random basis.
200
200
*1
*2
Fig. 3: Arrangement of coppices (*1) and tensiometer (*2) in the vegetation support course in a
receptacle of 800 x 800 mm (dimensions in mm)
800
*1
*2
800
*3
Fig. 4: Layout of the seams (*1 = wall-corner seam, *2 = base-corner seam, *3 = T–seam) in the
sheeting to be tested (dimensions in mm)
91
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
In order to ensure a good germination of the seeds and/or good taking roots of the coppices in
the first 8 weeks after the greening process irrigation is carried out as soon as the soil moisture
tension drops below a value of –100 hPa. In the further course of the investigation watering is
applied only if the soil moisture tension falls below values between –300 and –400 hPa. The
irrigation volumes shall be dimensioned for achieving a soil moisture tension in the substrate of
nearly 0 hPa. Make sure that the entire vegetation support course (including peripheral areas) is
equally humidified. Avoid any lasting water excess (waterlogging) in the lower areas of the
vegetation support course. In order not to damage the tensiometers the devices need to be
taken out of the containers at the beginning of the first frost season (for the 4-year investiga-
tion). Irrigation during the dormant phase of the vegetation shall be adapted to the low water
demands of the plants. After the last frosts in spring the tensiometer devices shall be placed
back at the same position. Irrigation is continued as described above.
The moisture course shall be kept constantly humid by watering via the infeed pipe which is
mounted to the receptacle.
Any repeat fertilization for a 2-year investigation shall be carried out in semi-annual intervals
with a fertilizing agent and in the quantities listed in paragraph 4.8. The first unit shall be applied
3 months after planting. In the 4-year investigation repeat fertilization is given once a year in
March or April.
Any alien growth and any plant parts which have died back and fallen onto the surface of the
vegetation support course are to be removed.
Any coppices which have died (‘Orange Charmer’ and/or alder) shall be replaced. In order not
to interfere with root growth of the remaining plants replacement planting is admissible only dur-
ing the first 3 months in the 2-year investigation and during the first 6 months in the 4-year in-
vestigation. If during the course of the investigation the losses in terms of coppices account for
more than 25 % of the total plant number the test shall be repeated (see 2.15).
If the coppice plants (‘Orange Charmer’ and/or alder) need to be pruned, a growth height of at
least (150±10) cm shall be kept. Any pruning shall be effected on the same day on plants in
both trial and control containers.
In the area of walkways between the containers side shoots may be pruned if they are an ob-
stacle to using the walkways.
92
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
Any insufficient couch grass stock (< 40 % of the surface is covered) shall be improved by up to
2 units of repeat seeding in the first 3 (2-year investigation) or 6 months (4-year investigation) of
the test.
To avoid a storage of couch grass all blades of grass shall be cut back to a height of 5 cm once
they have reached a growth height of ca. 20 cm.
In case of strong pest attacks and/or any plant diseases threatening the survival of the plants
under testing appropriate plant protection measures shall be carried out.
7 Evaluations
7.1 Evaluations during the testing
In the 2-year investigation as well as in the 4-year investigation the transparent base of all 8 trial
containers shall be examined in intervals of 6 months in order to detect visible roots and rhi-
zomes (i.e. successful root penetration).
If visible root penetration is discovered in the trial containers the client who has commissioned
the investigation shall be informed. The trial may be discontinued (see 2.15).
Apart from this notification no interim results in writing shall be disseminated during the duration
of the trial.
Any plant damages, such as e.g. deformations of the leaves or changes of leave colour, shall
be noted separately.
The evaluation commences with a final monitoring of the growth performance of the plants as
described in paragraph 7.1.
At the end of the trial the vegetation support course is taken out of all trial containers in order to
examine the sheeting/surface coating on root and rhizome ingress and/or penetration. Accord-
ing to paragraphs 2.9, 2.10 and 2.12 roots and/or rhizome ingress and penetration into the
sheeting/coating shall be recorded in absolute figures.
If more than 50 roots and/or rhizomes per container are found which have penetrated the sheet-
ing/coating, the evaluation on ingress/penetration – as opposed to the above described – shall
93
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
be performed only on a section of the tested material. In that case, the evaluation has to cover
at least 0,2 m2 (about 20 % of the sheeting/coating covered with the substrate) and shall be
performed in the area indicated in Fig. 5.
In case of penetration of roots/rhizomes into the overlap area of seams the maximum penetra-
tion depth shall be recorded.
Photographic evidence shall be provided of some evidence of root ingress or penetration (as an
example).
Samples of the sheeting/coating for retention purposes shall be taken to mirror the result of the
investigation. The samples shall be stored in compliance with the stipulations laid down in para-
graph 5.
1100 200
Fig. 5: Evaluation section of penetrations into the surface of a sheeting/coating under testing
in case of > 50 penetrations/receptacle (dimensions in mm)
8 Test report
No interim results shall be disseminated during the trial.
Upon termination of the trial a complete test report about the given test situation shall be set up
in two copies (1 copy each for both the test institute and the client), but only if the sheet-
ing/coating has proven to be “root-resistant” in accordance with paragraph 2.11. Companies
and products which have participated in the investigation without success shall not receive any
test report but only a notification in writing with the statement and related explanations that the
sheeting/coating has not successfully passed the root-resistance test based on FLL standards.
The report is to be used only in non-abbreviated form and shall contain the following data:
– details provided by the manufacturer in relation to the sheeting under testing in accordance
with paragraph 5
– detailed information as regards the preparation of the trial containers according to para-
graph 6 (or a note that trial execution has been carried out in compliance with the FLL
guidelines, the guidelines used for the investigation shall be enclosed as appendix)
– all evaluation results in accordance with paragraph 7, and
– a summary version of the evaluation regarding the tested sheeting according to paragraphs
2.11 und 2.13
94
This download edition is your personal version of the FLL-guidelines.
Dissemination only by the publisher. All rights reserved. Unauthorized
forwarding of this data to other persons will be pursued with all legal means
of regress.
9 Competence
The client who commissions the investigation is competent for:
– procurement and installation of the protective lining (see 2.3 and 6.1) and the sheeting
and/or coating to be tested (see 6.1)
– provision of a material sample (see 5), and
– details in relation to the tested sheeting and/or coating (see 5)
The trial containers (see 4.2) may be provided by either the client or the test institute. All com-
petences are subject to contractual agreements between the client who commissions the inves-
tigation and the test institute. These contractual agreements also determine the expenses in-
curred for the investigation which shall be borne by the client.
95