CHAPTER 1
PAVEMENTS OF ROADS
a
FLUSH KERB
b
ASPHALTIC BASE COURSE ASPHALTIC WEARING
COURSE
CARRIAGEWAY ASPHALTIC BASE
c
COURSE
BASE COURSE
RAISED KERB
BASE COURSE
200
d
SUB-BASE
ASPHALTIC WEARING
COURSE SEE NOTE 2
SUB-BASE
ASPHALTIC BASE
SUBGRADE
COURSE
EXPRESSWAY SUBGRADE
TYPE 1 SEMI-EXPRESSWAY 50 120 250 300
ARTERIAL ROAD
ROAD IN INDUSTRIAL AREA
PAVEMENT STRUCTURE WITH RAISED KERB PAVEMENT STRUCTURE WITH FLUSH KERB
TYPE 2 PRIMARY ACCESS 40 90 200 300
70
225 200
BASE COURSE
SUB-BASE
REGULATING COURSE
SUB-BASE CAST-IN-SITU CONCRETE (C28/35)
EXISTING ROAD SURFACE REINFORCED WITH TWO LAYERS OF WSFR B8
WIDENING OF CARRIAGEWAY WIDENING OF CARRIAGEWAY (CONCRETE COVER 40)
(FOR WIDTH MORE THAN 3m) (FOR WIDTH EQUAL OR LESS THAN 3m)
SCALE 1:25
SCALE 1:25
NOTES: 3. Roads in industrial area and roads leading in / out of industrial areas, STANDARD DETAIL
1. Asphaltic wearing course - W3B or OGW as required in project specification. as shown in Urban Redevelopment Authority (URA) conceptual land
2. Gradation for 20mm graded stones. use plan (refer to URA's website) shall be categorised as industrial
roads.
SIEVE % PASSING SIEVE % PASSING FLEXIBLE PAVEMENT,
4. Various layers of pavement shall be constructed in compliance with DRAWING NO. REV.
20.0mm 100 3.35mm 40-50 RECAMBERING &
M&W Specification. LTA/SDRE14/1/PAV1 B
WIDENING OF
13.2mm 85-95 2.36mm 21-31 B SEP 2017
CARRIAGEWAY
A OCT 2015 DATE OF ISSUE SCALE SHEET NO.
6.3mm 58-68
REV. DATE 1st APR 2014 1:20 1 OF 1
1-1
CHAPTER 1-MAIN PAGE PREVIOUS NEXT
B
SDRE14/1/PAV3
ON
CONCRETE
TI
TRANSI
SLAB
D PAVEM ENT
EXPANSION JOINT
L
(REF DWG NO:
GI
CONCRETE SDRE14/1/PAV3)
RI
TRANSITION
SLAB
L
3m
RIGID PAVEMENT
3m
EXPANSION JOINT
STOP LINE
EXPANSION JOINT
STOP LINE
LENGTH OF
ROAD TYPE RIGID PAVEMENT
3m (L)
L OTHER ROADS 40m
RIGID PAVEMENT
3m
ROAD IN INDUSTRIAL AREA 50m
CONCRETE
TRANSITION
D PAVEM ENT
SLAB
L
GI
NT
ON
ON JOI
CONCRETE
TI
TRANSI
EXPANSI
SCALE 1:1000
-
200
SUBGRADE
SECTION A-A
SCALE 1:50
1-2
CHAPTER 1-MAIN PAGE PREVIOUS NEXT
225
225
200
3
1:
BASE COURSE
SUB-BASE SUB-GRADE
BASE COURSE 1000 300
15
APPROVED SEALER
SECTION B-B
DETAIL OF CONNECTION BETWEEN FLEXIBLE AND RIGID PAVEMENT
3
REF DWG NO: SDRE14/1/PAV2
50
SCALE 1:25
DETAIL 1
SCALE 1:5
3
60mm+ 20mm FROM CENTRE LINE 60mm+ 20mm FROM CENTRE LINE
50
VARIES VARIES
225
c
L 30 DIA CAP
50
STANDARD DETAIL
(SHEET 2 OF 2) LTA/SDRE14/1/PAV3 B
B SEP 2017
1-3
CHAPTER 1-MAIN PAGE PREVIOUS NEXT
SIDETABLE CARRIAGEWAY MEDIAN / SIDETABLE CARRIAGEWAY
1000 1000
VEHICULAR
IMPACT
GUARDRAIL
LAMP POST
STREET
FURNITURE
ROAD SURFACE
1:15
1000
1000
1000
PVC CABLE WARNING
MARKER
250
250
100 DIA UPVC PIPE
100 DIA UPVC PIPE WITH PILOT PVC CABLE WARNING MARKER
WITH PILOT WIRE
WIRE FOR PUBLIC LIGHTING 100 DIA UPVC PIPE WITH PILOT FOR PUBLIC LIGHTING
50
WIRE FOR PUBLIC LIGHTING
709
(SEE DETAILS, FOR PIPE CROSSING
AT ENTRANCES & JUNCTIONS)
LAMP POST
50
172m m OR 272m m
122
17
DANGER LTA LT CABLE 400 x 400 OPENING
3
250
494
494 x 494 x 3mm THK
SS316 COVER PLATE
47
122
WITH HAIRLINE FINISH
17
17
PLAN OF PVC CABLE WARNING MARKER SECTION A-A ELEVATION DETAIL 1 SECTION B-B
SCALE 1:100 SCALE 1:30 SCALE 1:2
1-4
CHAPTER 1-MAIN PAGE PREVIOUS
1300
150 150
(MINIMUM) (MINIMUM) GROUND LEVEL
200 TO 300
ASPHALT CONCRETE /
BACKFILL MATERIAL
PE
ASPHALTIC WEARING BASE COURSE
. PI
M UM 1000
PE
350
I
. PI
ABOVE G.
M UM 1000
BASE COURSE
I
ABOVE G.
NI
SAND BAGS
CEMENT DUST (1:10)
MI
OVER G.I. PIPES
NI
MI
RED PLASTIC CABLE SLAB
SHALL BE PLACED 200mm
200
ABOVE G.I. PIPES G.I. PIPE G.I. PIPE
G.I. PIPE
BACKFILL
MATERIAL
BACKFILL MATERIAL
300 GAP
CROSS SECTION OF TRENCH (1m DEPTH) CROSS SECTION OF DRAW PIT (1m DEPTH)
SCALE 1:30 SCALE 1:30
TO BE ENGRAVED
SCALE 1 : 1000
LIGHT
CABLE
LEGEND
8 NOS. 100mm DIA G.I. PIPE WITH 'TRAFFIC LIGHT CABLE' SLAB
TO BE LAID 1m BELOW FINISHED LEVEL
(FOR SLIP ROAD THAT LEADS TO TRAFFIC CONTROLLER)
NOTES: 6. The plastic cable slabs shall be 300mm x 1000mm and marked with the
1. Cable slab to be mounted on concrete pavement with industrial glue to indicate wordings: 'TRAFFIC LIGHT CABLE -1800 CALL LTA - 1800 2255 582'.
STANDARD DETAIL
the location of G.I. pipe crossing. 7. G.I. pipes shall be laid between the stop line and the 2nd pedestrian
2. Traffic light cable slab with concrete haunching to be used to cover the cables at crossing line and laid through the centre divider.
intersections of G.I. pipes. 8. G.I. pipes shall be break at the draw pits (i.e intersection of G.I. pipes)
3. G.I. pipe socket shall be used for connecting of 2 straight G.I. pipes. on centre divider or sidetable with a gap of about 300mm. Sand bags
shall be provided over all the cable draw pits to enable contractor DRAWING NO. REV.
4. Cables shall be laid in 3.6mm thick (Class A), 100mm diameter galvanised iron
TRAFFIC LIGHT CABLE LTA/SDRE14/1/PAV5 B
pipes, complying with BS EN 10255:2004 under roads, footpaths and sidetable. to lay cable from controller to each individual traffic light pole.
B SEP 2017
5. Durable red plastic cable slabs shall be placed 200mm above the pipes for all 9. Capping / stoppers shall be provided for the pipes when not in use. DATE OF ISSUE SCALE SHEET NO.
A OCT 2015
trenches dug regardless of the depth to mark their positions. 1st APR 2014 AS SHOWN 1 OF 1
REV. DATE
1-5