Areas of Concern With Action Plan: Name of LSTK Contract
Areas of Concern With Action Plan: Name of LSTK Contract
Areas of Concern With Action Plan: Name of LSTK Contract
CONTRACTOR
PROJECT
IMPACT ON
SR. NO. AREAS OF CONCERN CONSTRAINTS SCHEDULE
(IN DAYS)
THIS SHALL CONTAIN ONLY CRITICAL ITEMS/ISSUES WHICH ARE DIRECTLY AFFECTING THE PROJECT SCHEDULE
OTHER ITEMS CAN BE PLACED IN PROBLEMS & HOLD UPS CHAPTER.
TARGET DATES SHALL BE FURNISHED WITH ACTION PLAN.
MONTH & YEAR
CLIENT
PMC : EIL
CONTRACTOR
PROJECT
V - PROGRESS STATISTICS
A OVERALL PROJECT PROGRESS
DESCRIPTION WTD % AGDURING THE MONTH
COMPLEX SCHEDULE
RESIDUAL BASIC ENGINEERING
DETAILED ENGINEERING
ORDERING
MANUFACTURING/DELIVERY
SUB-CONTRACTING
CONSTRUCTION
COMMISSIONING
OVERALL PROGRESS - PHYS A=100%
B. PROCESS UNIT (UNITWISE)
B.1 UNIT NAME
DESCRIPTION WTD % AGDURING THE MONTH
COMPLEX UNIT SCHEDULE
RESIDUAL BASIC ENGINEERING
DETAILED ENGINEERING
ORDERING
MANUFACTURING/DELIVERY
SUB-CONTRACTING
CONSTRUCTION
COMMISSIONING
PHYSICAL PROGRESS UNIT- A1 A1 % 100
B.2 UNIT NAME
B.3 UNIT NAME
B.4 UTILITIES /OFFSITES
DESCRIPTION WTD % AGDURING THE MONTH
COMPLEX UNIT SCHEDULE
RESIDUAL BASIC ENGINEERING
DETAILED ENGINEERING
ORDERING
MANUFACTURING/DELIVERY
SUB-CONTRACTING
CONSTRUCTION #
COMMISSIONING
PHYSICAL PROGRESS
A4 % 100
UTILITIES /OFFSITES
MONTH & YEAR
CLIENT
PMC : EIL
PAGE 7 OF 37
CONTRACTOR
PROJECT
X1 100
5 % , EXPLANATION
FURNISHED IN THIS SHEET.
IN LSTK CONTRACTOR'S SCOPE AS PER THE CONTRACT, SHOULD BE REPORTED IN
ACTUAL
MONTH & YEAR
NAME OF LSTK CONTRACT CLIENT
CONTRACTOR: PRIMOVE ENG. PVT. LTD. LOCATION
PROJECT REPORT NO.
DATE:
MILESTONE STATUS
(CURRENT + 2 MONTHS)
STATUS AS ON
LATEST
SCHEDULE
SR. NO. MILESTONE DESCRIPTION ALLOWABLE ACTUAL DATE
DATE
DATE
1 GENERAL
2 UNIT
2.3 PROCUREMENT
a) ORDERING
2.4 SUB-CONTRACTING
2.5 CONSTRUCTION
2.6 PRECOMMISSIONING
2.7 COMMISSIONING
NOTE: ALL MILESTONES (UNIT WISE AND FUNCTION WISE) AS AGREED DURING KICK OFF MEETING ARE TO BE LIST
PIAGIO
BARAMATI
FORECAST
STATUS/REMARKS
DATE
EETING ARE TO BE LISTED.
NAME OF LSTK CONTRACT MONTH & YEAR
CONTRACTOR CLIENT
PROJECT PMC : EIL
PAGE 10 OF 37
VII - PROBLEMS / HOLD-UPS
(UNIT WISE / DISCIPLINE WISE)
SR.
PROBLEM / HOLD-UPS ACTION P ACTION BY TARGET DATE
NO.
1
2
3
4
5
NOTE : ONLY POINTS WHICH AFFECT THE PROGRESS BUT MAY NOT
HAVE THE IMPACT ON THE PROJECT SCHEDULE SHALL BE LISTED HERE.
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
NOTE :
TK CONTRACT
PROJECT
100
90
CUMULATIVE % PROGRESS 80
70
60
50
40
30
20
10
0
D'00
SCH DURING THE MONTH 0
ACT. DURING THE MONTH 0
CUMM. SCH 5
CUMM. ACT 3
1. UNIT WISE SEPARATE CURVE FOR EACH FUNCTION AND CURVE FOR PHYSICAL PROGRESS
2. OVERALL (AT CONTRACT LEVEL) SEPARATELY FOR EACH FUNCTION AND ONE CURVE FOR PHYSICAL PROGRESS
MONTH & YEAR
CLIENT
P P M: EIL
PAGE 11 0F 37
ANNEXURE - I (A)
30
25
20
15
10 MONTHLY % PROGRESS
5
0
J'0F'01 M'01 A'0M'0J'0J'01 A'01
### 42.5 15
### 24 19
### 57.5 72 80 85### 95 100
### 42 61
PHYSICAL PROGRESS
HLY % PROGRESS
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
CHRONOLOGICAL ACHIEVEMENTS
S. NO. DESCRIPTION OF KEY MILESTON
1 GENERAL
2 UNITWISE (AS APPLICABLE)
2.1 RESIDUAL BASIC ENGINEERING
2.2 DETAILED ENGINEERING
2.3 ORDERING
2.4 MANUFACTURIN& DELIVERY
2.5 SUB-CONTRACTING
2.6 CONSTRUCTION
2.7 SUB-CONTRACTPACKAGES
2.8 PRECOMMISSIONING
2.9 COMMISSIONING
NOTE : MECHANICAL COMPLETION &
ALSO BE RECORDED.
MONTH & YEAR
CLIENT
PMC : EIL
PAGE 12 OF###
ANNEXU- II (A)
COMMISSIONDATES SHALL
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT PMC
TOTAL
DISCIPLINE DRAWING
NOS.
ARCHITECTURAL
GENERAL CIVIL
STRUCTURAL
PIPING
GAD's
ISO's
ELECTRICAL
INSTRUMENTATION
TOTAL
SUMMARY STATUS OFENGINEERINGDRAWINGS
(SUMMARY LEVEL & UNIT WISE SEPARATELY)
DRAWINGS RELEASED (NOS.) REVIEW STATUS (NOS.) SUBMISSION PROGM.
DURING THE MONTH CUMULATIVE TOTAL DRGS. COD
### CODE 2
SCH. ACT. SCH ACFOR REVIEW FRESH CODE 3
MONTH & YEAR
CLIENT
: EIL
PAGE ### OF 37
ANNEXU:II (B.1)
PROJECT
PROJECT NAME
REV
DRG. NO. .
NO.
DISCIPLINE : PROCESS
LEGEND
CATEGORY (CAT.):-I: INFORMATION
USE CODE :-
R: REVIEW A : APPROVAL
S : STUDY A: STATUTORY / CLIENT REVIEW
P: PURCHASE C: CONSTRUCTION
T: TENDERING L: CALCULATION
SUREMENT METHODOLOGY.
MONTH & YEAR
CLIENT
PMC : EIL
Page 14 of 37
(DCI)
DISCIPLINEWISE)
ANNEXURE - II(B.2)
STATUS AS OF : DD/MM/YYYY
MILESTONES
S. NO
NUMBER DESCRIPTION
10
11
12
13
14
15
TOTAL
USE CODE :-
NOTE :
APPROVAL OF
ORY OF VENDOR
VALUE
(A/R/I) DRGS
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
SCH
ACT/FORECAST
APPROVAL OF
APPROVAL OF
PR / 1ST REVIEW
OF VENDOR
DRGS/DOCS PROGRESS
30%
PLEASE REFER
ANNEXURE :
II (C)
______%
______%
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
PROJECT NAME
SL
NO
WTD.
DRG. NO. DESCRIPTI VALUE
E : ……………………….
TS STATUS
(UNITWI / DISCIPLINEWISE)
ANNEXURE - II(C)
STATUS AS OF : DD/MM/YYYY
REV. NO. REVIEW DATE PROG REMARKS &
VALUE CODE Ist SUBM. REV. CODECODE-(%) STATUS
* * *
NAME OF LSTCONTRACT
CONTRACTOR
PROJECT
UNIT NAME / SUMMARY LEVEL
ORDERISTATUS
(LOCAL(INDIAN) & FOREIG PROCUREMENT
TOTAL MR ISSUE
CATEGORY MRs ISSUED ENQUIRY
SCH ACT SCH ACT
EQUIPMENT
COLUMNS
EXCHANGERS
TOTAL
BULK
TOTAL
NOTE : 1 NUMBEROF MRs SHALBE PROVID FOR
EXCHANGERS, PUMPETC. AND BULK MATERIAL.
2 SEPERASTATUFOR EACHUNIT AND AT
MONTH & YEAR
CLIENT
PMC : EIL
PAGE: 17 OF 37
ANNEXURE : II (D.1)
(SUMMARY)
PROCUREMENT SEPARATELY)
BIDS FOI/TOI PO
DUE ISSUED ISSUED
SCH ACT SCH ACT SCH ACT
CONTRACTOR
PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MR
DESCRIPTION ITEM ISSUE RECV TBA FOI/TOI PO
MR NO. WTD. VAL CAT REL
NO ENQ BIDS ISSUED ISSUE ISSUE
DATE
MECHANICAL
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
CLIENT
PMC : EIL
PAGE:
---------------------------------------------------
ANNEXURE - II(D.2)
CONTRACTOR
PROJECT
QUANTITY ORDERED
EQUIPMENT DESCRIPTION TOTAL NOS DESPATCHED RECEIVED AT SITE (NO)
(NOS)
PROPANE TANKS
PUMPS
COMPRESSORS
MISC
TOTAL
NOTES:- 1. STATUS FOR INDEGENEOUS AND IMPORTED EQUIPMENT SHALL BE FURNISHED SEPERATELY.
SEPARATE STATUS FOR EACH UNIT AND AT SUMMARY LEVEL.
MONTH
CLIENT
Y STATUS (SUMMARY)
ACT. 1 2 3 4 5 6
. 2.
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
UNIT / SUMMARY *
WT. LOCATION,
(MT) COUNTRY
COLUMNS
a)
b)
VESSELS
REACTORS
EXCHANGERS
AIR COOLERS
PUMPS
COMPRESSORS
FANS/BLOWERS
OTHER ITEMS
ELECTRICAL EQUIPMENTS
NOTE : 1. ALL EQUIPMENT TO BE COTAGGED ITEMS WITH MULTIPLE SUFFIXES TO BE MENTIONED SEPARATELY. e.g
CLIENT
PMC : EIL
Page: 20 of 3
REQD. AT
SITE (SCH,)
Page: 20 of 3
ANNEXURE: II(E.2)
INSULATION FIRE
PROOFING
NAME OF LSTK CONTRACT
QUANTITY
TOTAL
S.NO. ITEMWISE DESCRIPTION UOM FORECAST FOR BALANC
REQUIREMENT RECEIVED AT
ORDERED RELEASED
SITE
1 2
ALL ITEMS
6 INSTRUMENTATION ITEMS
ALL ITEMS
7 OTHERS
GASKETS No 121
HARDWARE No 746
CLIENT: PIAGIO
LOCATION: BARAMATI
STATUS AS OF : _______
3 4 5
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
PROJECNAME
TAG NO.DESCRIPTI WTD PO VENDOR
ITEM OF ITEM VAL NO.
& COUNTRY
DATE
LEGEND
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
ENTATION ITEMS.
BOARDING TO BE INDICATED.
MONTH & YEAR
CLIENT
PMC : EIL
PAGE : 22 OF 37
PROJECT
UNIT :
DESCRIPTION WTD ISSUE PREPARAT
OF WORK VALUE TENDEOF TENDE
SPECSDOCUMEN
* *
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
SCH.
A/F
* - AGREED MILESTONE PERCENTAGE
A/F :- ACTUAL/FORECAST
NOTE : 1 INDICATE A/F AS APPLICABLE WITH THE DATES.
MONTH & YEAR
CLIENT
PMC : EIL
PAGE: 23 OF ###
SUB-CONTRACTING STATUS
ANNEXURE - II(F)
STATUS AS OF : DD/MM/YYYY
TENDER RECEI AWARD NAME DURATI CONTRACTINTERMEDIATE
ON OF BIDOF %AGE OF OF COMPLETI CONTRACTUAL REMARKS
SALE WORKPROGRESSAGEN CONTRADATE MILESTONES
* * * (IF ANY)
EXURE - II(F)
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
UNIT ______________
UNITWISE STATUS OF CONSTRUCTION QUANTITIES RELEASED
UOM :UNIT
MONTH & YEAR
CLIENT
PMC : EIL
PAGE: 24 ###
OF
ANNEXURE : II(G.1)
ANTITIES RELEASED
( DISCIPLINEWISE FOR EACH UNIT)
CUM BALANCE PROGRAMME FOR BALANCE QTY UNDER HOLD
QTY RELEASED QTY TO BE MONTHS AND REASON FOR THE SAME
QTY RELEASED 1 ST 2ND 3RD 4T 5T 6TH
OF MEASUREMENT.
FOR THE SAME
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
TOTAL QUANTITY
WORK ITEM
UNIT CUMMULATIVE DURING THIS M
DESCRIPTION
WORKLOAD FRONT COMPLETED PROGRAMME
EXCAVATION CM
BACK FILLING CM
RCC WORKS CM
BRICK WORK CM
INSTRUMENTATION
- LOOPCHECKING NOS
ESS STATUS
PROGRAM FOR
DURING THIS MONTH NEXT MONTH
COMPLETED BACKLOG
CENTAGE PROGRESS SCHEDULE
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
UNIT :_______________
SR. AGENCY
NO. SCOPE OF W
SUMMARY
NOTE : 1
DURATION
(MONTHS)
* FRONT INDICATES WORK THAT CAN BE TAKEN UP CONSIDERING AVAILABILITY OF DRAWINGS, MATERIALS AND ACCESS.
MONTH & YEAR
CLIENT
PMC : EIL
PAGE : 26 OF 37
ANNEXURE : II (H)
STATUS OF CONSTRUCTION
CONTRACTUAL ACTUAACT/ANT CUM. % ACHIEVED
START COMPLSTARTCOMPLMONTHLY PROGRESS CONTRACTUAL FRONT* ACTUAL
DATE DATE DATE SCH. PROGACTSCH AVAILABLE
PROJECT
UNIT :__________________
LOOPWISE
SR. RADIO-
DESCRIPTION FRONT CHECMECH.
NO. TOTAL GRAPHY
AVAILABLLISTECLEARED
CLEARED
1 UNIT I 100 50 30 20 20
SERVICEWISE /
SYSTEMWISE
2 UNIT II
SERVICEWISE /
SYSTEMWISE
3 OFFSITES PART A
SERVICEWISE
4 OFFSITES PART B
SERVICEWISE
5 PACKAGES
SERVICEWISE
TOTAL
NOTE : REPORTING SHALL START AFTER PREPARATION OF LOOPWISE PIPING COMPLETION SCHEDULE
MONTH & YEAR
CLIENT
PMC : EIL
PAGE : 27 of
###
ANNEXURE : II (I)
HYDROTESTING STATUS
NO. OF LOOPS
HYDROTESTED LOOPS UNDER HOLD REMARKS
RADIO-
SR THIS MONTH CUMULATIVE MATERIAL ERECTI TOTAL
GRAPHY
CLEARED SCH. ACT. SCH. ACT.
CLEARED
20 15 5 20 10 35 15 50
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
UNIT : ______________
S.NOSYSTEM DESCRIPTION
A. SYSTEM I TARGET DATE
ACTUAL DATE
ACTUAL DATE
ACTUAL DATE
TARGET DATE
ACTUAL DATE
TARGET DATE
ACTUAL DATE
ACTUAL (NOS.)
LEGEND :
FORMAT I : INFORMATION REGARDING SYSTEM COMPLETION
FORMAT II : CHECKLIST
FORMAT III : READY FOR PRE-COMMISSIONING \ MECH COMPLENTION CERTIFICATE
FORMAT IV : READY FOR COMMISSIONING CERTIFICATE
FORMAT V : COMPLETION OF COMMISSIONING CERTIFICATE
NOTE : 1
2
SYSTEM HANDING OVER STATUS (UNITWISE)
FORMAT I ISSUE DATE
(NOS.)
H COMPLENTION CERTIFICATE
PROJECT
NAME OF UNIT
GRAND
TOTAL
NOTE :
LSTK CONTRACT
UNITWISE
PLAN / ACT
PLAN
ACT
PLAN
ACT
PLAN
ACT
PLAN
ACT
PLAN
ACT
REASON FOR DEVIATION BETWEEN MONTHLY CONSTRUCTION PROGRAMME AND ACTUAL TO BE MENTIONED. (USE SEPARATE
DEPLOYMENT OF LSTKPERSONNEL ATCONSTRUCTION
(1) LABOUR
FCBMASONS BWWRFPGGELECINST. FITTE INSULAT OSSTRL. ERECTORS PSI MMSCTAC FDRILLERS GLU
CLIENT
PMC : EIL
PAGE 29 O 37
ANNEXURE - II(K.1)
RUCTION SITE
MONTHLY CONSTN. PROGRAMME(%):
MONTHLY CONSTRN. ACTUAL (%) :
(2) MANAGEMENT & SUPERVISION
OTHERS SMANAGERS EADMN. DEPT
PQA / QC SISITE SSOSGRAND TOTAL : (1) + (2)
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
REQUIRED
DEPLOYED
TOTAL REQUIRED
DEPLOYED
PROGRAM %AGE :-
%AGE PROGRESACHIEVED :-
MONTH & YEAR
CLIENT
PMC : EIL
PAGE ### ###
O
PLOYMENT STATUS
___________)
ANNEXURE : II (K.2)
PAY LOADE PDRWSBMOTOR GRADELCWTWTBGOPSMAGNETIC DRILL M/CHPAV. BREAKE BCUSAH MH250 MT CRANES
NAME OF LSTK CONTRACT : MONTH & YEAR
CONTRACTOR :CLIENT
PROJECT :PMC : EIL
PAGE : 31 ###
OF
UPDATED PROJECT SCHEDANNEXURE : II (L)
STATUS AS ON: DD/MM/YY
NAME OF LSTK CONTRACT:
CONTRACTOR:
PROJECT:
STATUTORY APPRO
(APPROVALS TO BE LISTED UNDER THE HEADS OF (A) FOR D
APPROVAL DATE
@@ STATUS
REQUIRED BY RECEIVED ON
NG APPROVAL SHALL BE HIGHLIGHTED IN THE STATUS COLUMN.
STATUS
/ DRAWINGS AND (B) FOR INSTALLATION)
REMARKS
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
__________________________________________________________________________________________________
INVOICING
INVOICE RECEIPT
SR.NO
INVOICING STATUS
DEDUCTIONS
STATUS
NAME OF LSTK CONTRACT MONTH & YEAR
CONTRACTOR CLIENT
DATE
PROJECT REPORT NO
DELAY ANALYSIS
1 HMTD
2 GENERAL CIVIL
3 ARCHITECTURE
4 STRUCTURAL
5 PIPING
6 PRESSURE VESSELS
7 ROT.EQUIPMENT
8 MECH.EQUIPMENT
9 ELECTRICAL
10 INSTRUMENTATION
TOTAL 100.0
DEVIATION REMARKS
NAME OF LSTK CONTRACT
CONTRACTOR
PROJECT
DELAY
CUMULATIVE
SR. NO DISCIPLINE PROGRESS % DEVIATION
SCH ACT
1 HMTD
2 GEN. CIVIL
3 ARCHITECTURE
4 STRUCTURAL
5 PIPING
6 ROTATING EQPT
7 MECHANICAL
8 ELECTRICAL
9 INSTRUMENTATION
MONTH & YEAR
CLIENT
DATE
PAGE
DELAY ANALYSIS