IOT PTOT QAQC FMT 22 R0 Hydrotest Certificates

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

Client: EPC Contractor:

PT Oiltanking, Karimun, Indonesia PT IOT EPC Indonesia


Job Title : Tankages Format No. : IOT-PTOT-QA/QC-FMT-22
Project : TANK STORAGE TERMINAL AT KARIMUN Rev. :0
Client : Oiltanking (PTOT) Contract No – 13B1A25

Hydrotest Certificates
Tank no : Report No :
Size : Date :
Drg. No :

Precentage Capacity

100%

75%

Waiting for 3 hours


50%

Stop 1 hour for Inspection

Stop 1 hour for Inspection


25%

Time

(Start) (End)

: Stop filling for Inspection

15 MIN 15 MIN MIN 2 HOURS 15 MIN 15 MIN

1.5 X DP

MOWP

1.5 X DP

50% DP 50% DP

30% DP 30% DP

0 Psig

Design
30% DP 50% DP 75% DP
No. Rating Pressure 1,5 x DP
(In Psi) (In Psi) (In Psi)
(DP in Psi)
1 150 147.3 44.19 73.65 110.475 220.95

Hydrotest data
Mode of Holding
Date Time Water (m³) REMARKS
Filling Time

0 Level

25% Level

50% Level

75% Level

100% Level

Mode of
Dewatering

75% Level

50% Level

25% Level

0 Level