HAZOP for Scrub Column (V-102)

Guide
Parameter Deviation Causes Consequences Safeguards Actions
Word

High Pressure High pressure  Build-up of vapour due to  Rupture of column resulting  Pressure relief valve on No action required
inside column possible blockage in piping in leakage and a threat to column
 An increase of temperature, safety  Onsite personnel are
that will cause an increase in  Spreading of the NG vapour required to wear
pressure may cause dizziness or respiratory protective
headache to nearby workers devices
 Cause poisoning and
pollution, due to release of
vapour into the air, may
cause explosive mixture by
mixing with air

Low Pressure Low pressure  Column pressure indicating  Loss of production  Low pressure alarm on Alert operator and
inside column control (PIC-10106) failure column corresponding operator
 Rupture in pipeline in the action on PIC-10106
upstream or downstream failure, or any possible
which may cause leakage leakage in pipeline or
 Rupture or leakage of any unit unit
attached on the pipeline

High Flow High feed flow  Column flow control (FC-  High level in column  Check valves operation Regular valves
into column 10105) failure  Potential of column and set to operational inspection including at
 Lack of maintenance or overfilling settings before start-up start-up, steady-state and
checks of valves operation  Change of composition as  Stopping propane cycle shutdown; Alert operator
(CV-101-01 or CV-101-02) the propane would merge and directing NG to and operator action on
 Propane from precooling with main stream, giving bypass the ruptured maintenance on the cause
cycle entering with feed undesired product exchanger of more flow
stream, possibly due to heat  High level alarm for
exchangers rupture propane entry to
column
Low Flow Abnormal flow  Column flow control (FC-  Build-up or loss of materials  Check valves operation Regular valves
restriction by 10105) failure in pipes or vessels, leading and set to operational inspection including at
valves leading to  Pump (P-101) failure to possible blockage or settings before start-up start-up, steady state and
low flow into  Leakage due to random pressurisation, which may  Standby pump (P-102) shutdown
column pipeline rupture lead to rupture of piping in case of duty pump
 Lack of maintenance or  Low level in column leading (P-101) failure
checks of valve operation to less production  Onsite personnel are
(CV-101-01 or CV-101-02) required to wear
respiratory protective
devices

High Temperature High temperature  Possible leakage of propane  Less separation between  Pressure relieve valve Regular maintenance of
of feed entering coolant from the cooling vapour and liquid, more on column propane cooling cycle
column system, leading to less heavier hydrocarbons will
efficient cooling be sent to the Main
Cryogenic Heat Exchanger
 Over-pressurisation of
column

High Level High level of  Column level control (LC-  Potential to overfill the  High level alarm on Alert operator on high
liquid in column 10104) failure column column liquid level in column,
 Control valve (CV-101-04) on check on valve
liquid outlet line at bottom of operation, halt
column fails to open appropriate flow to
 Abnormal function of control restore column level
valve (CV-101-01) leading to
too much NG feed entering
the column

Low Level Low level of  Column level control (LC-  Loss of production  Low level alarm on Alert operator that liquid
liquid in column 10104) failure column level in column is
 Pump (P-101) failure resulting  Standby pump in case running low, check on
in no flow to column of duty pump (P-101) pump flowrate, increase
 High temperature of inlet failure flowrate to normal
stream (either from reflux operating range
drum or main feed), causing
poor feed separation, leading
to lower liquid level
 The change in composition of
the main feed stream, to
contain less heavy content
(i.e. NG stream to contain
more lighter HCs)

Change Composition Composition of  Heavy components in NG  Less reflux stream as reflux  Monitor feed stream Operator to implement
main feed changes main feed stream decrease comes from separated heavy composition corresponding corrective
ends, which leads to poor actions to restore normal
separation separation efficiency