Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

NOTE:

OCOTBER 4 (FRIDAY)-> PRESENTATION OF CAPSTONE (di pa naming confirmed


kay Miss if hanggang METHODOLOGY AND PROJECT DETAILS PO MUNA TAYO)

(FUTURE TENSE PO MUNA LAHAT)

TASKS ASSIGNED STUDENTS DEADLINE


PROBLEM, SOP AND UMALI, ARADA, SEPT 25 (WEDNESDAY)
OBJECTIVES ALVAREZ

QUESTIONNAIRES LARANANG, NEED PO NAMIN ANG FINAL


(ACTUAL SURVEY AND DIMATATAC, DE VILLA, QUESTIONNAIRES BY- SEPT 25
PROVIDING THE ANGULO, VILLOSTAS, (WED)
QUESTIONNAIRES) MULINGTAPANG ACTUAL PERIOD OF SURVEY IN
THE BRGY WILL BE ON OCTOBER
21-25
MAKING OF THE MARZO, INOCENCIO OCTOBER 2 (WED)
CITRONELLA CANDLES
DISTRIBUTION OF MARZO, INOCENCIO OCTOBER 13 OR 14
CITRONELLA SA 10 CALLEJO & TENTATIVE PA PO
HOUSEHOLDS MACARAEG
START NG SURVEY VELASCO, MACARAEG, OCTOBER 26 OR 27
AND PAGPAPA SORIANO TENTATIVE PA PO
ANSWER NG
QUESTIONNAIRE
AFTER MA-TRY ANG
PRODUCT
TECHNICALITIES OF DE MESA, UNTIL OCTOBER 2 PO KAYO
PAPER- CITATIONS, TAPEL,SACULO, NAGWO-WORK & EDIT 
GRAMMAR, ETCCCC. DIMAANDAL & VIRAY
RRL ALCALDE, LIPARDO, SEPT 28 (SATURDAY)
LOPEZ
METHODOLOGY AND PATASIN, GARCIA, SEPT 29 (SUNDAY)
DATA ANALYSIS SANTOS, CASAS

MULA IPO to DESIGN


AND SET-UP PO
MIDTERM OCTOBER 4, (FRIDAY)
PRESENTATION CONFIRM PA PO NAMIN IF UNTIL
DESIGN AND SET-UP PO MUNA
TAYO 
LETTER OF CONSENT MACARAEG & OCTOBER 20 (SUNDAY)
TO DO THE RESEARCH CALLEJO
SA BRGY TO BE
CHOSEN