The document is a cost estimate breakdown for construction of a building. It lists 23 items of building materials needed, including cement, sand, aggregate, rebar, wood, roofing materials, plumbing items, and others. It specifies the quantity, unit, unit price and total price for each material. It also lists the labor costs, including wages for a foreman, masons and workers, totaling to 2.625 million rupiah. The total estimated cost for materials is 12.257 million rupiah.
The document is a cost estimate breakdown for construction of a building. It lists 23 items of building materials needed, including cement, sand, aggregate, rebar, wood, roofing materials, plumbing items, and others. It specifies the quantity, unit, unit price and total price for each material. It also lists the labor costs, including wages for a foreman, masons and workers, totaling to 2.625 million rupiah. The total estimated cost for materials is 12.257 million rupiah.
The document is a cost estimate breakdown for construction of a building. It lists 23 items of building materials needed, including cement, sand, aggregate, rebar, wood, roofing materials, plumbing items, and others. It specifies the quantity, unit, unit price and total price for each material. It also lists the labor costs, including wages for a foreman, masons and workers, totaling to 2.625 million rupiah. The total estimated cost for materials is 12.257 million rupiah.
No Uraian Material Total a b c d h=axd BAHAN 1 Semen @. 50 Kg 26 Zak I-b Rp 65.000 Rp 1.690.000 2 Pasir Beton 6,8 M3 I-a Rp 200.000 Rp 1.360.000 3 Kerikil Beton 0,36 M3 I-a Rp 200.000 Rp 72.000 4 Kawat Harmonika 1.6 mm BWG 16 4,5 M2 I-b Rp 35.000 Rp 157.500 5 Batako 224 Bh I-b Rp 4.000 Rp 896.000 6 Besi Ø 10 mm 7 Btng I-b Rp 60.000 Rp 420.000 7 Besi Ø 6 mm 13 Btng I-b Rp 35.000 Rp 455.000 8 Batu Belah 3,276 M3 I-b Rp 280.000 Rp 917.280 9 Balok Kuda -Kuda 5/7 10 Bh I-a Rp 40.000 Rp 400.000 10 Balok Kasau 5/7 10 Bh I-a Rp 40.000 Rp 400.000 11 Kayu Papan Lapis 2/10 6 Bh I-a Rp 35.000 Rp 210.000 12 Papan Listplank Ulin 4 Kpng I-a Rp 65.000 Rp 260.000 13 Atap Seng 8 Lbr I-b Rp 70.000 Rp 560.000 14 Nok Atap Seng/ Bubungan 4 M1 I-b Rp 20.000 Rp 80.000 15 Cat Kilap 4 Kg I-b Rp 60.000 Rp 240.000 16 Klosed Jongkok 1 Bh I-b Rp 160.000 Rp 160.000 17 Pipa PVC Dia. 4 " 2 Btng I-b Rp 200.000 Rp 400.000 18 Pipa PVC Dia. 2 " 1 Btng I-b Rp 90.000 Rp 90.000 19 Lem dan Seal Tape 3 Bh I-b Rp 30.000 Rp 90.000 20 Pintu Plastik Kamar Mandi 1 Bh I-b Rp 300.000 Rp 300.000 21 Bak Air Biasa 1 Bh I-b Rp 350.000 Rp 350.000 22 Sepitank 2x2x2 m 1 Bh I-b Rp 2.500.000 Rp 2.500.000 23 Prasasti / Plakat KKN PPM UGM 1 Bh I-b Rp 250.000 Rp 250.000 TOTAL harga Per Unit WCU Rp 12.257.780
1 Mandor / Kepala Kerja 5 Hok Rp 65.000 Rp 325.000
2 Tukang 20 Hok Rp 60.000 Rp 1.200.000 RAB WC UMUM 3 Pekerja 20 Hok Rp 55.000 Rp 1.100.000 TOTAL Rp 2.625.000