RAB Pos Jaga Paling OK
RAB Pos Jaga Paling OK
( RAB )
PEKERJAAN : PEMBANGUNAN POS JAGA
LOKASI : YAPIS DOK V BAWAH JAYAPURA PAPUA
T.A : 2018
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA SAT Rp. JUMLAH Rp.
I PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran dan pemasangan Bowplank M1 56 77,575.00 4,344,200.00
2 Pek.Pembersihan Lokasi dan Perataan M2 169 21,250.00 3,591,250.00
3 Pek. Galian Pondasi M3 26.14 94,625.00 2,473,876.00
4 Pek. Urugan Tanah Kembali M3 6.53 26,592.00 173,512.80
5 Pek. Urugan Pasir M3 1.54 397,850.00 610,779.32
6 Pek. Timbunan Pilihan M3 9.8 277,850.00 2,722,930.00
7 Pek. Urugan Pasir ( Bawah Tanah ) M3 2.45 397,850.00 974,732.50
JUMLAH 14,891,280.62
VI PEKERJAAN SANITER
1 Pas. Kloset Jongkok Kramik BH 1 938,900.00 938,900.00
2 Pas. Bak Mandi batu tela lapis Porsteling 0.30 M³ BH 1 2,594,743.60 2,594,743.60
3 Pas. Septiktank & Peresapan dari Beton 2 X 1,5 X 1,5 Ls 1 8,296,150.84 8,296,150.84
4 Pas. Pipa PVC Type AW 3/4" M 10 30,918.00 309,180.00
5 Pas. Pipa PVC Type AW 2" M 4 76,214.50 304,858.00
6 Pas. Pipa PVC Type AW 3" M 5 104,643.50 523,217.50
7 Pas. Kran Air Bersih 3/4" BH 2 94,150.00 188,300.00
8 Pas. Floor Drain/ Filter BH 1 68,775.00 68,775.00
JUMLAH 13,224,124.94
IX PEKERJAAN PENGECATAN
1 Pek. Pengecatan Kusen Kayu M2 16.71 73,857.50 1,234,158.83
2 PEK. Vernis Kayu M2 4.65 59,302.50 275,827.79
3 PEK. Pengecatan Dinding M2 169.86 25,462.00 4,325,051.71
4 PEK. Pengecatan Felapond M2 50.41 25,462.00 1,283,539.42
JUMLAH 7,118,577.75
X PEKERJAAN LISTRIK
1 Pas. Lampu PHILIPS SL 14 What BH 7 309,512.50 2,166,587.50
2 Pas. Stop Kontak 230 VA BH 3 254,512.50 763,537.50
3 Pas. Saklar Tunggal BH 1 254,512.50 254,512.50
4 Pas. Saklar Ganda BH 2 249,512.50 499,025.00
5 Pas. Box Sekring/ Limit BH 1 294,512.50 294,512.50
JUMLAH 3,978,175.00
RENCANA ANGGARAN BIAYA
( RAB )
REKAFITULASI
Coast 181,887,737.90
PPN (10%) 18,188,773.79
Realcoast 200,076,511.69
Dibulatkan 200,076,000.00
TERBILANG:
TERBILANG : Dua Ratus Juta Tujuh Puluh Enam Ribu Rupiah.
Direktur
.......................
DAFTAR HARGA SATUAN BAHAN DAN UPAH
I PEKERJAAN PENDAHULUAN 7m
1 PENGUKURAN BOUPLANK
PEMASANGAN BOUPLANK 7m
panjang = 7m
lebar = 7m
keliling = 2x 7+ 7
= 28 m
panjang bouplank = keliling x 2
= 28 x 2
1300
VOLUME = 56 m
300
2 PEMBERSIHAN LAPANGAN 700
panjang = 13 m
lebar = 13 m
1300
700
VOLUME = 13 x 13
= 169 m2
300
3 pekerjaan galian
Luas = a+b x t
300 300
2
= 1 + 1.3 x 0.75 1.3
2
= 0.86 m2
KM/
WC g
2.0
R. JAGA
h
7
700
700
= 49 m2
volume = 0.05 x 49
= 2.45 m3
di bawah pondasi
luas = 0.05 m2 1.02
volume = 0.05 x 30.4
= 1.54 m3 0.05
0.8
0.15 1.02
3 PAS. BATU TELA 1 PC : 4 PSR
panjang = panjang pas.pondasi luas kusen pintu, jendela dan ventilasi
= 30.4 m 1 luas ventilasi
tinggi = 3.3 m panjang = 0.45
luas = 100 m2 lebar = 0.25
= luas batu tela - luas total pintu jendela banyak = 20 bh
= 100 - 15.4 luas = 2.25 m2
= 84.9 m2 2 luas pintu
panjang = 2.15
lebar = 0.80
4 PEK. PLESTERAN 1 PC : 4 PSR, TEBAL 15 MM banyak = 3 bh
luas = PAS. BATU TELA 1 PC : 4 PSR x 2 luas = 5.16 m2
= 84.9 x 2 3 luas jendela
volume = 170 m2 panjang = 5.91
lebar = 1.35
5 PEK. ACIAN SEMEN luas = 7.98 m2
volume = PEK. PLESTERAN 1 PC : 4 PSR, TEBAL 15 MM total luas kusen pintu, jendela dan ventilasi
= 170 m2 = 15.4 m2
III PEKERJAAN KAYU
1 PAS. KUZEN PINTU DAN JENDELA KAYU
kusen pintu = 3
ukuran = 0.05 x 0.1 = 0.01 m2
panjang = 2.15 x 2+ 0.7 x 2
= 5.7 m
volume kusen pintu = 0.09 m3
kusen jendela panjang
total panjang = 26 m
ukuran = = 0.01 m2
volume kusen jendela = 0.13 m3
kusen ventilasi
banyak = 20 bh
= 0.05 x 0.1 x 0.25 + 0.45
= 0.004
volum 20 ventilasi = 20 x 0.004
= 0.07 m3
volume = 50.4 m2
+3.00 Pas.Plafond Triplek
5mm
Rangka 60x120
+3.00
7.1
Pas.Plafond Triplek
5mm
Rangka 60x120
+3.00
5mm
Rangka 60x120
+3.00
Pas.Plafond Triplek
5mm
Rangka 60x120
+3.00
7.1
182,44
panjang k1 (1bh) = 3.7 + 11.2 + 6.06 + 1.82
91,74
0.53 x 2+ 0.68 x 2
53
0.91 x 2+ 1.23 x 2
302
= 29.5 m 560
panjang k2 ( 2 bh)
panjang = 5.46 + 3.6 + 0.87 + 1.16 + 1.63 + 1.5
= 28.4 m
163
8 7 ,2 5
148,71
= 0.01 x 88.9
= 0.44 m3 TYPE KUDA - KUDA K2 (2 Bh) TY
S KALA 1 : 25 SKA
4 8 0 ,4 1
6 5 4 ,1 8
1 3 4 ,5 6
3 0 7 ,2
12.3
4 8 0 ,4 1
6 5 4 ,1 8
1 3 4 ,5 6
3 0 7 ,2
16.3
26.2
total = 60.1
volume = luas x panjang gording
= 0.01 x 60.1
= 0.30 m3
710
5 PAS. NOK GENTENG METAL MULTIROOF
panjang = 5x
volume = 20 m
355
alas = 7.1
355
tinggi = 3.55
luas = axb
2
= 7.1 x 3.55
2
= 12.6 m2 710
volume = 12.6 x 4
= 50.4 m2
700
700
lebar = 7m
luas = 49 m2
volume = 3.43 m3
7
2 BETON TUMBUK 1 PC : 2 PSR : 3 KRL
panjang balok dan slop = panjang pondasi x 2 sengkang ø6-200
= 30.4 x 2
= 60.8 m
luas = 0.15 x 0.2
= 0.03 m2 0.15 tulangan utama ø10
volume = 1.82 m3
350
0.2
350
kolom
banyak kolom = 11 bh
tinggi kolom = 3.5 m
luas = 0 m2
volume = 0 M3
3 PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR 0.2 sengkang ø6-200
pembesian slop
panjang per sengkang = 0.5 m
panjang pondasi = 30.4 m 0.2
= 152 bh
panjang sengkang slop = 76 m tulangan utama ø10
berat per meter = 0.22 kg
volume = 16.7 kg
pembesian kolom
panjang per sengkang = 0.5 m jumlah kolom = 11 bh
panjang kolom = 35.2 m tinggi kolom = 3.2 m
= 176 bh panjang kolom = 35.2 m
panjang sengkang kolom = 88 m 0.2
berat per meter = 0.22 kg
volume = 19.4 kg
VI PEKERJAAN SANITER
1 PAS. KLOSET JONGKOK KERAMIK
pas. Kloset jongkok keramik = 1 bh
volume = 1 bh
2 PAS. BAK MANDI BATU TELA LAPIS PORSELIN 0.30 M3
volume = 1 bh
3 PAS. SEPTIKTANK & PERESAPANNYA DARI BETON 2 X 1,5 X 1,5 M'
volume = 1 bh
IX PEKERJAAN PENGECATAN
1 PEK. PENGECATAN KOSEN KAYU 3 X (BARU)
panjang kusen = 55.7 m
lebar = 0.05 m x 2= 0.1
tinggi = 0.1 m x 2= 0.2
volume = 16.7 m2
X PEKERJAAN LISTRIK
1 PAS. LAMPU PHILIPS SL 14 WATT
volume = 7 bh No. SIMBOL KETERANGAN JUMLAH
2 PAS. STOP KONTAK 230 VA
1. Lampu XL 10 Watt 7
volume = 3 bh
3 PAS. SAKLAR TUNGGAL 2. Stop Kontak 3
volume = 1 bh 3. Saklar Ganda 2
4 PAS. SAKLAR GANDA 4. Saklar Tunggal 1
volume = 2 bh
5. Kabel NYM 2x2.5 mm
5 PAS. BOX SEKRING/ LIMIT
volume = 1 bh 6. Fuse Box 1