J.C.

RODRIGUEZ CONSTRUCTION Request For Information


CORPORATION

Project: Seafront Residences CP-03 RFI No.: SEA-CP03-RFI-003

Location: Calubcub 2, San Juan Batangas Date: May 20, 2017

FCD: PROPOSED RESORT RESIDENTIAL GHD SPECIFICATION - WATER


Ref Drawing: Ref. Specs:
DEVELOPMENT DISTRIBUTIN SYSTEM

Questions : (attach supporting docs e.g. key plan & pictures )

1. Usage of uPVC class 150 psi as basis in the bid negotiation.


2. Usage of uPVC class 150 psi as same with the other aboitiz project.

Originator's Proposed Solution : (attach supporting docs e.g. shop drawing, sketch)

Cost Implications: Additive Deductive

Submitted By: Endorsed By: Noted By:

Ruel F. Cortez Karen Joy Viray Karen Joy Viray


JCRCC - Project Director Aboitizland - Resident Engineer Aboitizland - Resident Engineer
Request For Information
OPCW-CMT-27/F1 (05-Nov-16)

Project : Seafront Residences RFI No.: SEA-CP03-RFI-003


Location : Calubcub II, San Juan Batangas Date & Time : 20-May-2017
Trade : CP-03 Site Development Works
Designer Bound
Ref Drawing/Specs :
(Sheet no. & contents) (Yes/No)

Questions : (attach supporting docs e.g. key plan & pictures )

1. Usage of uPVC class 150 psi as basis in the bid negotiation.


2. Usage of uPVC class 150 psi as same with the other aboitiz project.
3. Usage of uPVC class 150 psi as replacement of uPVC class 180 psi (GHD specs).

Objectives/ Intention/ Purpose :

Proposed Solution : (attach supporting docs e.g. shop drawing, sketch, pictures)

Cost Implications: Cost Implications: Amount :


No
(Yes or No) Result : (Additive/Deductive)

Response:

Submitted By: Endorsed By: Noted By: Approved By:

Ruel F Cortez Karen Joy Viray Roger Casuga Ian Chris L. Tumulak
JCRCC - Project Director CMT - Resident Engineer CMT - Project Director TSG - Technical Planning Officer
Request For Information
OPCW-CMT-27/F1 (05-Nov-16)

Project : Seafront Residences RFI No.: SEA-CP03-RFI-003


Location : Calubcub II, San Juan Batangas Date & Time : 20-May-2017
Trade : CP-03 Site Development Works
Designer Bound
Ref Drawing/Specs :
(Sheet no. & contents) (Yes/No)

Questions : (attach supporting docs e.g. key plan & pictures )

1. Usage of uPVC class 150 psi as basis in the bid negotiation.


2. Usage of uPVC class 150 psi as same with the other aboitiz project.
3. Usage of uPVC class 150 psi as replacement of uPVC class 180 psi (GHD specs).

Objectives/ Intention/ Purpose :

Proposed Solution : (attach supporting docs e.g. shop drawing, sketch, pictures)

Cost Implications: Cost Implications: Amount :


No
(Yes or No) Result : (Additive/Deductive)

Response:

Submitted By: Endorsed By: Noted By: Approved By:

Ruel F Cortez Karen Joy Viray Roger Casuga Ian Chris L. Tumulak
JCRCC - Project Director CMT - Resident Engineer CMT - Project Director TSG - Technical Planning Officer
Request For Information
OPCW-CMT-27/F1 (05-Nov-16)

Project : Seafront Residences RFI No.: SEA-CP03-RFI-004


Location : Calubcub II, San Juan Batangas Date & Time : 25-Jul-2017
Trade : CP-03 Site Development Works
Designer Bound
Ref Drawing/Specs :
(Sheet no. & contents) (Yes/No)

Questions : (attach supporting docs e.g. key plan & pictures )

1. FCD for Drainage System Layout shows service connection layout. But no design of pipe size &
design elevation for service connection is not indicated in GHD Construction Plan(FCD).
2. Based on your Design for Housing units at septic tank, elevation for interconnection of pipe to service
connection at drainage manhole is at least 300mm. The design clearance of waterline main pipe to
sidewalk is 750mm. Some invert elevation of drainage pipe is at minimum depth of 0.60meter, Is it
acceptable that the elevation of waterline pipe is lower than the elevation of service connection for
Drainage manhole?

Objectives/ Intention/ Purpose :

to set up the diameter of service connection and its minimum invert elevation.

To make the stub-out exactly fitted to drainage manhole.

Proposed Solution : (attach supporting docs e.g. shop drawing, sketch, pictures)

200mm diameter upvc, sdr 34, moldex brand

Top of service connection is 0.50m from the top of sidealk

Cost Implications: Cost Implications: Amount :


No
(Yes or No) Result : (Additive/Deductive)

Response:

Submitted By: Endorsed By: Noted By: Approved By:

Ruel F Cortez Karen Joy Viray Roger Casuga


JCRCC - Project Director CMT - Resident Engineer CMT - Project Director TSG - Technical Planning Officer
Request For Information
OPCW-CMT-27/F1 (05-Nov-16)

Project : Seafront Residences RFI No.: SEA-CP03-RFI-004


Location : Calubcub II, San Juan Batangas Date & Time : 25-Jul-2017
Trade : CP-03 Site Development Works
Designer Bound
Ref Drawing/Specs :
(Sheet no. & contents) (Yes/No)

Questions : (attach supporting docs e.g. key plan & pictures )

1. FCD for Drainage System Layout shows service connection layout. But no design of pipe size &
design elevation for service connection is not indicated in GHD Construction Plan(FCD).

2. Based on Design for Housing units at septic tank, elevation for interconnection of pipe to service
connection at drainage manhole is at least 300mm. The design clearance of waterline main pipe to
sidewalk is 750mm, Is it acceptable that the elevation of waterline pipe is lower than the elevation of
service connection for Drainage manhole?

Objectives/ Intention/ Purpose :

*To set up the diameter of service connection and its minimum invert elevation.

*To make the stub-out exactly fitted to drainage manhole.

Proposed Solution : (attach supporting docs e.g. shop drawing, sketch, pictures)

*200mm diameter upvc, sdr 34, moldex brand

*Top of service connection is 0.50m from the top of sidewalk

Cost Implications: Cost Implications: Amount :


No
(Yes or No) Result : (Additive/Deductive)

Response:

Submitted By: Endorsed By: Noted By: Approved By:

Ruel F Cortez Karen Joy Viray Roger Casuga


JCRCC - Project Director CMT - Resident Engineer CMT - Project Director TSG - Technical Planning Officer
Request For Information
OPCW-CMT-27/F1 (05-Nov-16)

Project : Seafront Residences RFI No.: SFR-CP-17A-RFI-015


Location : Calubcub II, San Juan Batangas Date & Time :

Trade :
Designer Bound
Ref Drawing/Specs :
(Sheet no. & contents) (Yes/No)

Questions : (attach supporting docs e.g. key plan & pictures )

Objectives/ Intention/ Purpose :

Proposed Solution : (attach supporting docs e.g. shop drawing, sketch, pictures)

Cost Implications: Cost Implications: Amount :


No
(Yes or No) Result : (Additive/Deductive)

Response:

Submitted By: Endorsed By: Noted By: Approved By:

Ruel F Cortez Karen Joy Viray Roger Casuga


JCRCC - Project Director CMT - Resident Engineer CMT - Project Director TSG - Technical Planning Officer