Meeting Agenda

S.No Item Description Remark

Company Introduction
Project Overview Daewoo Company
1 Daewoo Introduction - PJ : Wood Pallet manufacturing plant (300,000 ton per year) Brochure
- Developer : EMCO + KOEN. PJ ' Over view
- Location: Kafuas Regency, Propinsi Kalimantan Tengah, Indonesia

General Introduction
-. Brief History Page 2
-. Financial Status Page 3
2 Compary Introduction -. Project List (Completed, On-going / Industrial , Power, etc) Page 9 - 11
-. Experience wih Overseas Company
-. Resource (Manpower, Equipment, Material etc) Page 3 & 5
-. Certificate, License etc Page 6 - 8

If there is to intention to paricipate our project

3 Joint Operation If possible, there is any condition for joint Operation (Local share portion is to be satisfied 65% over etc)

Local Content (JO)

Normal Scope of Work / DOR (EPC, Permit) , sharing portion etc

Pangkalan
4 Project Similar Project(Completed, On-going / Size , Contract Amount etc) 100.000 t/year,
U$ 1,730,000
Engineering Performance Yes

5 Engineering Local Regulation (Fire fighting, Building etc) Yes

Indonesia
Manpower Resourece (Nationanlity , Supervisor vs Labor Ratio etc) 8.3%
50%
6 Labor / Equipment Equipment Resourece (Own vs Rental, Offshore Equpment such as tug, barge etc ) No

Material Supply Plan (Concrete, Rebar etc) Not yet

Outsourcing and Transportation Plan Not yet


7 Material

Civil Work Plan Not yet

8 Construction
Mecahnical Work Plan

Electrical Work Plan


9 Commissioning Not yet

Commissiong Plan

Not yet
Mobile Plan (Office, Camp, Laydown,etc)

10 Mobil Water, Fuel , Power supply plan

Transportaion Plan

HSE Plan & Procedure Not yet

11 HSE & QA/C QA/C Plan & Procedure