PROGRAM OF WORKS

Project: a. Additional faucets for Project WINS


b. Repainting of flower boxes and fences
c. Concreting of pathways
Location: Visayan Village Central Elementary School
Funds: MOOE
Subject: Bills of Materials
Date November, 2019

QTY. Unit Description Unit Cost Amount

Carpentry Works: M MIC WIRE


7 40.00 280.00
Materials 1 ROXTONE PL55 90.00 90.00
Pcs
1 BB PLUG 70.00 70.00
Pcs
1 SOLBA 100.00 100.00
Pcs
3 PAINT BRUSH #2 30.00 90.00
Pcs
AMAZON
3 SCREEN 90.00 270.00
Pcs
1 FOAM 170.00 170.00
Pcs
1/2 GALLON OF
TOILET BOWL
5 CLEANER 130.00 650.00
Pcs
3 PAINT BRUSH #1 20.00 60.00
Pcs
2 ROLLER BRUSH 58.00 116.00
Pcs
1 VULCA SEAL 217.00 217.00
Pcs
10 FAUCET 1/2 175.00 1750.00
Pcs
4 TEE 1/2 20.00 80.00
Pcs
8 RIPPLE MIX 1/2 20.00 160.00
Pcs
4 ELBOW MIX 1/2 20.00 80.00
Pcs
10 TAP 1/2 20.00 200.00
Pcs
1 PVC 65.00 65.00
Pcs
5 PIPE 1/2 65.00 325.00
Pcs
20 PLUM TEE 1/2 16.00 320.00
Pcs
22 ELBOW1/2 14.00 308.00
Pcs
8 PLUM ELBOW 1/2 14.00 112.00
Pcs
40 PVC CLAP 1/2 2.50 100.00
Pcs
8 PLY 1/2 14.00 112.00
Pcs
14 FAUCET 1/2 PB 175.00 2450.00
Pcs
MALE ADAPTOR
5 1/2 14.00 70.00
Pcs
1 HACHSAW 50.00 50.00
Pcs
2 ELBOW 1/2 25.00 50.00
Pcs
1 TEE 1/2 50.00 50.00
Pcs
2 Pcs MALE ADAPTOR 15.00 30.00
20 CEMENT 230.00 4600.00
Pcs
13,025.0
Total Item Cost 0
SUMMARY:
Total Material Cost (MC): 13,025.00

Prepared by:

Daniel S. Tababa
Principal II
Checked and Verified by:

ENGR. ROQUE D. MALANGUIS III


Division Engineer III

Recommending Approval:
LILIA J. ORTILLANO, MAED
EPS- SGOD

Approved:
JOSEFINA B. PALACA, Ed. D.
Chief Education Supervisor -SGOD