Electrical Load Schedule
Electrical Load Schedule
Electrical Load Schedule
ETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI PLANNED COMPLETION DATE: 20
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
MAIN SUMMARY CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: LV ROOM - GROUND
OUTGOING
LV PANEL 4P 2500 SET AT 0.8 65 XLPE BY DEWA 2x1Cx150 438.63 431 422.52 1314.14
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 438.6 431 422.5 1314.1
MAX. DEMAND LOAD (3 PH) 1051.31 kW TOTAL CONNECTED LOAD (3 PH)
M - GROUND
90 1 2400/5A CT
90 1
1314.14 kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: LV PANEL CLIENT: SARHANK KADER
PLOT NO. JVC14VMRA002
FED FROM: TRANSFORMER CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: LV ROOM - GROUND
CIRCUIT FEEDER DB SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
NO. 1C, mm2
F/S MCCB MCB R-PH Y-PH B-PH TOTAL KW
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm2
mm2
ISO ACB
INCOMER-1 4P 2500 SET AT 0.8 65 XLPE BY DEWA 2x1Cx150 438.63 431.00 422.52 1314.14
OUTGOING
ESMDB-LL X 200 50 FIRE RATED 4Cx95 1Cx50 32.97 31.39 31.19 95.55
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 438.63 431 422.52 1314.14
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 1051.31 kW TOTAL CONNECTED LOAD (3 PH) 1314.14
1 2400/5A CT METER
E&M
INTERLOCKED
0.8 177.1
0.8 28.32 3
0.8 42.23 5
0.8 130.62 17
0.8 130.62 17
0.8 130.62 17
0.8 119.14 16
0.8 125.81 15
0.8 0.8
400KVAR-
MULTISTEP
90 1
kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF:
SMDB-LL CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: GROUND FLOOR LV ROOM
CIRCUIT FEEDER DB SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
OUTGOING
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 32.97 31.39 31.19
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 76.44 kW TOTAL CONNECTED LOAD (3 PH)
95.55 0
24.9
6.68
4.5
5.7
3.42
4.15
37.2
95.55 0
95.55 kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: ESMDB-MECH@BF CLIENT:
SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: ESMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: BASEMENT FLOOR ELECTRICAL ROOM
CIRCUIT FEEDER DB SP TP RATING - AMPS Fault Duty kA PVC XLPE ECC SIZE CONNECTED LOAD - kW Proposed kWh Metering
NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH TOTAL KW 1-PH (1)
kW kW kW
SWA/ PVC 2/3/4C mm²
ISO ACB
INCOMER X 63 (N/A) FIRE RATED 4Cx25 1Cx16 8.3 8.3 8.3 24.9
OUTGOING
SUMP PUMP-1 (D) X 32 25 XLPE 4Cx6 1Cx6 0.7 0.7 0.7 2.1
SUMP PUMP-2 (D) X 32 25 XLPE 4Cx6 1Cx6 0.7 0.7 0.7 2.1
TRANSFER PUMP (D) X 32 25 XLPE 4Cx6 1Cx6 1.5 1.5 1.5 4.5
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 8.3 8.3 8.3 24.9
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 19.92 kW TOTAL CONNECTED LOAD (3 PH) 24.9
100mA ELS+ALARM
100mA ELS+ALARM
100mA ELS+ALARM
100mA ELS+ALARM
100mA ELS+ALARM
100mA ELS+ALARM
100mA ELS+ALARM
kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI
DB REF: SMDB-LL CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: GROUND FLOOR LV ROOM
CIRCUIT FEEDER SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
DB NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
INCOMER X 500 (N/A) XLPE 2x4Cx150 2Cx70 71.2 75.73 74.43
OUTGOING
DB-LL1@BF X 40 25 XLPE 4Cx16 1Cx16 2.04 3.45 2.15
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 71.2 75.73 74.43
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 177.1 kW TOTAL CONNECTED LOAD (3 PH)
221.37 0
7.64 BF
18.77 GF
145.04
221.37 0
221.37 kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: SMDB-RETAIL
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: GROUND FLOOR LV ROOM
CIRCUIT FEEDER SP TP RATING - AMPS PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW Proposed kWh Metering
DB NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH TOTAL KW 1-PH (1)
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
OUTGOING
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 28.32 kW TOTAL CONNECTED LOAD (3 PH) 35.4
1 65m²
1 65m²
1 102m²
kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: SMDB-GF CLIENT:
SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: GROUND FLOOR LV ROOM
CIRCUIT FEEDER DB SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH TOTAL KW
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
INCOMER X 125 (N/A) XLPE 4Cx50 1Cx25 19.42 16.66 16.71 52.79
OUTGOING
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 19.42 16.66 16.71 52.79
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 70% DIVERSITY 36.95 kW TOTAL CONNECTED LOAD (3 PH) 52.79
kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: SMDB-1F TYPICAL FOR
SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL SMDB-2F & 3F CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: TYPICAL FLOOR EL ROOM
CIRCUIT SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
FEEDER DB NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH
SWA/ PVC 2/4X1C 2/3/4C mm² kW kW kW
ISO ACB mm²
INCOMER X 350 (N/A) XLPE 4Cx240 1Cx120 55.81 55.07 52.4
OUTGOING
DB-F101 X 40 25 XLPE 4Cx10 1Cx10 2.85 3.41 2.81
DB-F102 X 40 25 XLPE 4Cx10 1Cx10 2.85 3.41 2.81
DB-F103 X 40 25 XLPE 4Cx10 1Cx10 2.85 3.41 2.81
DB-F104 X 40 25 XLPE 4Cx10 1Cx10 2.85 3.41 2.81
DB-F105 X 40 25 XLPE 4Cx10 1Cx10 3.65 4.13 3.58
DB-F106 X 40 25 XLPE 4Cx10 1Cx10 2.85 3.41 2.81
DB-F107 X 40 25 XLPE 4Cx16 1Cx16 3.51 2.85 2.9
DB-F108 X 40 25 XLPE 4Cx10 1Cx10 3.05 2.61 3.41
DB-F109 X 40 25 XLPE 4Cx10 1Cx10 3.05 2.61 3.41
DB-F110 X 40 25 XLPE 4Cx10 1Cx10 3.05 2.61 3.41
DB-F111 X 40 25 XLPE 4Cx10 1Cx10 3.75 3.58 3.91
DB-F112 X 40 25 XLPE 4Cx10 1Cx10 3.75 3.58 3.91
DB-F113 X 40 25 XLPE 4Cx10 1Cx10 3.41 3.05 2.61
DB-F114 X 40 25 XLPE 4Cx10 1Cx10 3.41 3.05 2.61
DB-F115 X 40 25 XLPE 4Cx10 1Cx10 3.41 3.05 2.61
DB-F116 X 40 25 XLPE 4Cx10 1Cx10 4.11 3.75 3.38
DB-F117 X 40 25 XLPE 4Cx10 1Cx10 3.41 3.15 2.61
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 55.81 55.07 52.4
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 70% DIVERSITY 114.3 kW TOTAL CONNECTED LOAD (3 PH)
163.28 17
9.07 1
9.07 1
9.07 1
9.07 1
11.36 1
9.07 1
9.26 1
9.07 1
9.07 1
9.07 1
11.24 1
11.24 1
9.07 1
9.07 1
9.07 1
11.24 1
9.17 1
163.28 17
163.28 kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: SMDB-4F CLIENT:
SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: 4th FLOOR EL ROOM
CIRCUIT FEEDER DB NO. SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
OUTGOING
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 51.11 48.25 49.56
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 119.14 kW TOTAL CONNECTED LOAD (3 PH)
148.93 16
9 1
9 1
9.07 1
9 1
11.24 1
9 1
11.17 1
9.07 1
9.07 1
9.07 1
9.07 1
9.07 1
9 1
9 1
9 1
9.1 1
148.93 16
148.93 kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: SMDB-5F
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: 5th FLOOR EL ROOM
CIRCUIT FEEDER SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
DB NO. 1C, mm²
F/S MCB R-PH Y-PH B-PH
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO
INCOMER X 350 (N/A) XLPE 4Cx240 1Cx120 53.69 51.95 51.62
OUTGOING
DB-F501 X 25 XLPE 4Cx10 1Cx10 2.8 3.41 2.79
DB-F502 X 25 XLPE 4Cx10 1Cx10 2.8 3.41 2.79
DB-F503 X 25 XLPE 4Cx10 1Cx10 3.75 3.38 4.11
DB-F504 X 25 XLPE 4Cx10 1Cx10 2.8 3.41 2.79
DB-F505 X 25 XLPE 4Cx16 1Cx16 3.85 3.5 3.74
DB-F506 X 25 XLPE 4Cx10 1Cx10 3.05 2.61 3.41
DB-F507 X 25 XLPE 4Cx10 1Cx10 3.41 3.05 2.61
DB-F508 X 25 XLPE 4Cx10 1Cx10 4.11 3.75 3.38
DB-F509 X 25 XLPE 4Cx10 1Cx10 3.41 3.05 2.61
DB-F510 X 25 XLPE 4Cx10 1Cx10 3.41 3.05 2.61
DB-F511 X 25 XLPE 4Cx10 1Cx10 2.8 3.41 2.79
DB-F512 X 25 XLPE 4Cx10 1Cx10 3 2.59 3.41
DB-F513 X 25 XLPE 4Cx10 1Cx10 3 2.59 3.41
DB-F514 X 25 XLPE 4Cx10 1Cx10 3.1 2.26 3.74
DB-GYM X 25 XLPE 4Cx25 1Cx16 8.4 8.48 7.43
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 53.69 51.95 51.62
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 125.81 kW TOTAL CONNECTED LOAD (3 PH)
157.26 15
9 1
9 1
11.24 1
9 1
11.09 1
9.07 1
9.07 1
11.24 1
9.07 1
9.07 1
9 1
9 1
9 1
9.1 1
24.31 1
157.26 15
AD (3 PH) 157.26 kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI CLIENT: SARHANK KADER
PLOT NO. JVC14VMRA002
FED FROM: SMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: ROOF FLOOR ELECTRICAL ROOM DB REF: SMDB-MECH@RF
CIRCUIT FEEDER SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
DB NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH TOTAL KW
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
INCOMER X 300 (N/A) XLPE 4Cx185 1Cx95 45.57 49.73 49.73 145.04
OUTGOING
BOOSTER PUMP (D) X 20 25 XLPE 4Cx6 1Cx6 0.5 0.5 0.5 1.5
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 45.57 49.73 49.73 145.04
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 116.03 kW TOTAL CONNECTED LOAD (3 PH) 145.04
300mA ELCB+UVR+ART+CONTACTOR IN CP
100mA ELCB
100mA ELCB
300mA ELCB
kW
PROJECT: B+G+5 COM & RES BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: ESMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: ROOF FLOOR ELECTRICAL ROOM DB REF: ESMDB-MECH@RF
CIRCUIT FEEDER SP TP RATING - AMPS Fault Duty kA PVC XLPE CABLE SIZE ECC SIZE CONNECTED LOAD - kW
DB NO. 1C, mm²
F/S MCCB MCB R-PH Y-PH B-PH TOTAL KW
kW kW kW
SWA/ PVC 2/4X1C 2/3/4C mm²
mm²
ISO ACB
OUTGOING
NOTE(S): 1 ALL MCCB's BEFORE TARIFF METERING SHALL HAVE PADLOCKING FACILITY AT ITS 'OFF' POSITION
MDB CONNECTED TO : DEWA LV DB-TRANSF. TOTAL CONNECTED LOAD PER PHASE 12.4 12.4 12.4 37.2
SMDB CONNECTED TO : MDB…………………
MAX. DEMAND LOAD (3 PH) AT 80% DIVERSITY 29.76 kW TOTAL CONNECTED LOAD (3 PH) 37.2
300mA ELS+ALARM
300mA ELS+ALARM
300mA ELCB
300mA ELCB
kW
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: DB-SS
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: LV PANEL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: ELECTRICAL SUB-STATION
RATING OF RATING OF SL NO CIR NO MCB CCT ECC ROOM/ AREA CONNECTED LOADS/POINTS
INCOMER ELCB RTG IN Wire Wire
Amps Size Size
mm2 mm2
LTG EX. 13A SH W/H W/M KIT HD CCU FCU CU
Fan S/O S/O
32A SPN ISOL 40A,4P 1 C1 10 2.5 2.5 SUBSTATION 6
100mA ELCB-
1 2 C2 SPACE
3 C3 SPACE
40A,4P 4 C4 20 4 4 SUBSTATION 2
30mA ELCB-
2
5 C5 SPACE
6 C6 SPACE
SUB TOTAL
CABLE SIZE: 2C, 10 mm² XLPE/SWA/PVC/CU + TOTAL 1.00 kW
LE, DUBAI DB REF: DB-SS
ATION
100 600
200 400
RATING OF INCOMER RATING OF SL NO CIR NO MCB CCT ECC ROOM/ AREA CONNECTED LOADS/POINTS WATT UNIT
ELCB RTG IN Wire Size Wire Size
Amps mm2 mm2
LTG EX. 13A SH W/H W/M KIT HD CCU FCU CU
Fan S/O S/O
40A TPN ISOL 40A,4P 1 R1 10 2.5 2.5 PARKING(1-14 & 27-45)+FAN RM 8 50
100mA ELCB-
1 2 Y1 10 2.5 2.5 PARKING(15-72) 8 50
6 B2 SPACE
12 B4 20 4 4 PARKING 3 200
40A,4P 13 R5 SPACE
100mA ELCB-
4 14 Y5 32 6 6 LIFT LOBBY CU (B1-01) 1 2400
SUB TOTAL
R Y B
400
400
600
650
140
700
750
800
600
2,400 UVR+ART+CONT
170
RATING OF INCOMER RATING OF SL NO CIR NO MCB CCT ECC ROOM/ AREA CONNECTED LOADS/POINTS
ELCB RTG IN Wire Wire Size
Amps Size mm2
mm2
12 B4 20 4 4 PARKING-GF 3
13 R5 SPACE
14 Y5 20 4 4 DISABLED TOILET WH 1
15 B5 20 4 4 LV RM+GEN RM 2
18 B6
21 B7 SPACE
SUB TOTAL
R Y B
20 120
50 350
20 300
20/50 720
50 250
50 400
20 140
50 350
200 600
200 800
200 600
1200 1200
200 400
1,200
1200
400 400
330 330
100 100
12.86
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI DB REF: DB-LL2@GF CLIENT:
SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: SMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: GROUND FLOOR LV RM PAGES: 1/2
RATING OF INCOMER RATING OF SL NO CIR NO MCB CCT ECC ROOM/ AREA CONNECTED LOADS/POINTS
ELCB RTG IN Wire Wire Size
Amps Size mm2
mm2
LTG EX. 13A SH W/H W/M ISO CCU FCU CU
Fan S/O S/O
63A TPN ISOL 40A,4P 25 R9 20 4 4 TEL RM FCU (GF-13) 1
100mA ELCB-
8 26 Y9 20 4 4 TEL RM CU (GF-13) 1
27 B9 SPACE
30 B10 20 4 4 LV RM CU (GF-14) 1
B11
B12
SUB TOTAL
R Y B
140 140
170 170
500
500
1900
1900
18.77
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: SMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: 1st FLOOR ELECTRICAL ROOM PAGES: 1/2
DB REF: DB-LL3@1F
RATING OF RATING OF SL NO CIR NO MCB CCT ECC ROOM/ AREA CONNECTED LOADS/POINTS WATT UNIT
INCOMER ELCB RTG IN Wire Size Wire Size
Amps mm2 mm2
LTG EX. 13A SH W/H W/M KIT HD CCU FCU CU
Fan S/O S/O
15 B5 SPACE
18 B6
21 B7
40A,4P
100mA ELCB-
22 R8 20 4 4 CORRIDOR FCU (TH-19)-3F 1 400
7 23 Y8 SPACE
SUB TOTAL
R Y B
340
340
340
550
550
550
1,000 RING
1,000 RING
1,000 RING
330
330
400
400
1,200 UVR+ART+CONT
1200
1200
1,900 UVR+ART+CONT
1900
1900
400
400
RATING OF RATING OF SL NO CIR NO MCB CCT ECC ROOM/ AREA CONNECTED LOADS/POINTS WATT UNIT
INCOMER ELCB RTG IN Wire Size Wire Size
Amps mm2 mm2
LTG EX. 13A SH W/H W/M KIT HD CCU FCU CU
Fan S/O S/O
27 B9
30 B10
33 B11
36 B12
SUB TOTAL
R Y B
1,900 UVR+ART+CONT
1900
1900
1,900 UVR+ART+CONT
1900
1900
1,200 UVR+ART+CONT
1200
1200
1,200 UVR+ART+CONT
1200
1200
LTG EX FAN 13A S/O SH S/O W/M IND SKT KIT HD ISOL FCU CU
9 B3 SPACE
12 B4 20 4 4 ROOF 2 200
14 Y5 20 4 4 ROOF 3
15 B5 20 4 4 ROOF 2
21 B7
24 B8
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI CLIENT: SARHANK KADER
FED FROM: SMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: 4th FLOOR ELECTRICALPARGOEOSM: 1/2 DB REF: DB-LL4@4F
Load Per CircuitWATT REMARKS
Y B
280
350
200
500
350
800
400
SPN ISOL
600
400
330
UVR+ART+CONT
1,200
1,200
UVR+ART+CONT
1,200
1,200
4,630 4,380
DB REF: DB-LL4@4F
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI CLIENT: SARHANK KADER
FED FROM: SMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: 4th FLOOR ELECTRICALPARGOEOSM: 2/2 DB REF: DB-LL4@4F
30 B10
33 B11
36 B12
39 B13
42 B14
45 B15
DB REF: DB-LL4@4F
Y B
400
400
TP IND SKT
400
400
TP IND SKT
400
400
TP IND SKT
400
400
TP IND SKT
400
400
UVR+ART+CONT
1,200
1,200
UVR+ART+CONT
1,900
1,900
9,730 9,480
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: ESMDB-LL CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: BASEMENT FLOOR ELECTRICAL ROOM DB REF: EDB-LL1@BF
RATING OF
INCOMER
RATING OF
ELCB
SL NO CIR NO MCB RTG IN Amps
CCT Wire ECC
Size mm ²
ROOM/ AREA
Wire Size mm ² CONNECTED LOADS/POINTS
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
50 450
50 650
50 300
20 80
50 200
50 600
200 400
200 600
100 200
100 100
100 100
2800 2800 UVR+ART+CONT
200 200
RATING OF
INCOMER
RATING OF
ELCB
SL NO CIR NO MCB RTG IN Amps
CCT Wire ECC
Size mm² ²
ROOM/ AREA
Wire Size mm
CONNECTED LOADS/POINTS
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD ISOL FCU CU
SUB TOTAL
CABLE SIZE: 4C, 10 mm² XLPE/SWA/PVC/CU + TOTAL 5.75 kW
1C, 10 mm² PVC/CU GY ECC
E CIRCLE, DUBAI
R Y B
50 200
50 250
50 350
50 550
100 300
200/400 1,000 RING
400 400 MFACP
200 200 12U CAB
400 800
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C, 10 mm² XLPE/SWA/PVC/CU + TOTAL 3.42 kW
1C, 10 mm² PVC/CU GY ECC
E CIRCLE, DUBAI
R Y B
20 340
20 340
20 340
100 300 @H/L
100 300
100 300
50 50 @H/L
50 50
50 50
50 50
50 50
50 50
400 400
400 400
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C, 10 mm² XLPE/SWA/PVC/CU + TOTAL 4.19 kW
1C, 10 mm² PVC/CU GY ECC
EIRAH VILLAGE CIRCLE, DUBAI
R Y B
20 320
20 320
50 350
100 300 @H/L
100 300
100 100
100 100
100 100
50 50 @H/L
50 50
50 50
50 50
50 50
50 50
400 400
400 400
400 400
400 800
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
LLAGE CIRCLE, DUBAI
R Y B
50/100 250
20/50/100 210
20/100 260
200 400
200 600
200/400 800
200 200
1000 1,000
1200 1200
200 200
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
RCLE, DUBAI
R Y B
20/50/100 210
20/50/100 250
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
1000 1,000
200 600
200 200
200 200
1200 1,200
5700 1900 UVR+ART+CONT
1900
1900
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/50/100 210
20/100 280
200 400
200 600
200/400 800
1000 1000
200 200
1200 1,200
200 200
5700 1900 UVR+ART+CONT
1900
1900
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
20/50/100 250
20/50/100 210
20/100 380
20/50/100 210
200 400
200 600
200/400 800
200 600
1200 1,200
200 200
1200 1,200
200 200
1000 1,000
330 330
330 330
3800 1,267 UVR+ART+CONT
1,267
1,267
3800 1,267 UVR+ART+CONT
1,267
1,267
5,193 5,073 5,243
15.51
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: SMDB-1F CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: APARTMENT ENTRANCE DB REF: DB-F(101,102,103,104 & 10
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/50/100 210
20/100 280
200 400
200 600
200/400 800
1000 1000
200 200
1200 1,200
200 200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI 1BHK
20/50/100 350
20/50/100 230
20/100 280
200 400
200 600
200/400 800
1000 1000
200 200
1200 1,200
200 200
5700 1900 UVR+ART+CONT
1900
1900
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
20/50/100 210
20/50/100 250
20/100 300
200 600
200 400
200/400 1,000 RING
1000 1,000
200 200
1200 1,200
200 200
300 300
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI DB REF:
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI DB REF:
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
1000 1,000
200 600
200 200
200 200
1200 1,200
5700 1900 UVR+ART+CONT
1900
1900
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 210
20/50/100 250
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 210
20/50/100 250
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
400 400
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 210
20/50/100 350
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
330 330
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
100 200
20/50/100 210
20/100 260
200 400
200 600
200/400 800
1000 1000
200 200
1200 1,200
200 200
3600 1200 UVR+ART+CONT
1200
1200
330 330
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
WATT UNIT
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
5700 1900 UVR+ART+CONT
1900
1900
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
100 200
20/50/100 210
20/100 280
20/50/100 250
200 400
200 600
200/400 800
1200 1,200
1200 1,200
200 200
200 600
200 200
1000 1,000
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 210
20/50/100 250
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
100 200
20/100 260
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
20/50/100 210
100 300
20/100 260
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
100 200
20/50/100 210
20/100 260
200 400
200 600
200/400 800
1000 1000
200 200
1200 1,200
200 200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
5700 1900 UVR+ART+CONT
1900
1900
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 250
20/100 280
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
100 200
20/100 300
20/50/100 210
20/50/100 250
200 400
200/400 800
200 600
1200 1,200
200 200
1200 1,200
200 600
1000 1,000
200 200
330 330
3600 1200 UVR+ART+CONT
1200
1200
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 210
20/50/100 250
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
20/50/100 210
20/50/100 250
20/100 280
200 600
200 400
200/400 800
200 200
1000 1,000
1200 1,200
200 200
400 400
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
SUB TOTAL
CABLE SIZE: 4C,10 mm² XLPE/SWA/PVC/CU + 1C, 10mm ²
PVC/CU GY ECC TOTAL
E CIRCLE, DUBAI
R Y B
100 200
20/100 260
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
3600 1200 UVR+ART+CONT
1200
1200
330 330
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD CCU FCU CU
40A,4P 4 R2 20 4 4 PANTRY 2
30mA ELCB-
2 5 Y2 20 4 4 LIV/DIN 2/1
6 B2 20 4 4 BED RM 3
7 R3 20 4 4 LAUNDRY 1
8 Y3 SPACE
9 B3 20 4 4 12U CABINET 1
12 B4 20 4 4 BATH WH 1
15 B5
40A,4P 16 R6 SPACE
100mA ELCB-5
17 Y6 20 4 4 PANTRY FCU 1
18 B6 SPACE
SUB TOTAL
R Y B
100 300
20/100 260
20/50/100 210
200 400
200/400 800
200 600
1000 1,000
200 200
200 200
1200 1,200
1200
330
330
9.10
PROJECT: B+G+5 RESIDENTIAL BUILDING DETAILS OF CONNECTED LOAD / MAX. DEMAND AREA: JUMEIRAH VILLAGE CIRCLE, DUBAI
CLIENT: SARHANK KADER PLOT NO. JVC14VMRA002
FED FROM: SMDB-5F CONSULTANT: ARIF & BINTOAK CONSULTING ENGINEERS LOCATION: GYM ENTRANCE DB REF: DB-GYM
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD ISOL FCU CU
4 R2 SPACE
6 B2 SPACE
40A,4P 7 R3 20 4 4 GYM 3
30mA ELCB-
2 8 Y3 20 4 4 MALE+FEMALE CHANGING 2
9 B3 SPACE
10 R4 20 4 4 MALE SHWR WH 1
11 Y4 20 4 4 FEMALE SHWR WH 1
12 B4 20 4 4 GYM 3
40A,4P 13 R5 SPACE
100mA ELCB-3
14 Y5 20 4 4 GYM FCU (5F-15) 1
18 B6
24 B8
SUB TOTAL
E DB REF: DB-GYM
R Y B
50/100 900
50 650
100 800
50 800
200 400
1200 1,200
1200 1,200
400 1,200 RING
330 330
330 330
3600 1200 UVR+ART+CONT
1200
1200
1,350
1,350
1,350
1,350
LTG EX. Fan 13A S/O SH S/O W/H W/M KIT HD ISOL FCU CU
SUB TOTAL
E DB REF: DB-GYM
R Y B
1200
1200
24.31