Formwork,Scaffolding and Shoring Definition and


productivity
Categories Comments
Management Template, Planning Discussions 4 comments

Mainly the Formwork function is to Supporting Structure, Scaffolding function is to arrangement for
working plate forms, and Shoring function is for supporting method for unsafe structure.
Formwork,Scaffolding and Shoring Definition and
productivity:
1- Form work:

Its is an artiCcial support provided below and around the precast or cast in situe concrete
work.precast or cast in situe concrete work.

construction & casting is of prime importance in concrete industry. It share a signiCcant amount of
concrete cost. Form work is designed according to The ACI document SP-4.

Types of form work

formwork

– Steel form work

– Wooden form work

Steel formwork is made of

– steel sheets

– Angle Iron

– Tee Iron

Wooden form work consists of


– Props

– Planks battens

– Ledgers

– sheeting

Removal timing is very important for a planning engineer, Time of form work removal depends on the
following factors:

1. Type of Cement

Rapid hardening cements require lesser time as compared to


OPC (Ordinary Portland Cement)

2. Ratio of concrete mix

Rich ratio concrete gain strength earlier as compared to weak


ratio concrete.

3. Weather condition

Hydration process accelerates in hot weather conditions as


compared to cold and humid weather conditions.

Time of Removal of form work:


Time of Removal of form work

For normal works cost of formwork is about 30%-40%of


the concrete cost.
For special works cost of form work is about 50%-60%of
the concrete cost.

2- Scaffolding:

It’s a temporary structure to provide a platform at different levels of a building for workers and
Materials.

Types of Scaffolding
Scaffolding

1. Single Scaffolds

It consists of Standards (v – Standards (v posts)(10 cm) Putlogs (7.5 x 7.5), Ledgers Wooden
boards Braces Used for ordinary buildings

2. Double Scaffolds

It consists of Two rows of standards. 15 cm, 1.5 m Shores are provided.Used for superior works

3. Ladder Scaffolds

It consists of Brackets for Plate form.

4. Cantilever Scaffolds

It consists of Cantilever,Struts, Standards, Putlogs and Plate forms. It is used above ground level

5. Suspended Scaffolds

It consists of Ropes, Working platforms,Ropes can be raised Manually or mechanically Used for light
construction and Cnishing works of multistory buildings.
6. Steel or Tubular Scaffolds

It consists of Steel tubes (1-1/2” –2-1/2” diameter) Coupler or Clamps (to hold pipes in different
positions) Prop nuts (to hold single pipes) Bolts, Nuts & washers Wedge & Clip

3- Shoring:

it is the method of providing temporary support (shores) to an unsafe structure.

Types of Shoring

Shoring

Horizontal shoring or aying shoring

It consists of Dead shores,Sole plates, Needles, Props Used for rebuilding of walls.
Vertical shoring or dead shoring

It consists of Rackers, Needles,Cleats, Braces and Sole plate

Used to strengthen a wall.


Shuttering Carpenter productivity :

Form work-Footings, foundations, ground 8 m2 / day.

Form work-Columns, pedestals 6 m2/day.

Form work-Beams and slabs 8 m2/day

Form work-Tie beams, arches, lintels 5 m2/day

Form work-Walls 8 m2 / day

Form work-Circular, special shapes 4 m2/day

Form work- Making timber shutters 8 m2/day

Download Now our new mobile application for construction productivities from Google
Play and Apple Store:

Tag: concrete construction, construction of concrete, excavation shoring, Formwork, formwork


calculation excel, labor productivity, safety scaffolding, scaffold deCnition, scaffolding, Scaffolding
types, scaffolding vygotsky, Shoring, shoring and reshoring, shoring excavation, Shuttering,
shuttering materials, work platforms

Share: ! " # $

Hany Ismail, MSC, PMP Hany Ismael is the founder and


CEO of Planning Engineer Est. in
Egypt. He has started his career
back in 2003 as a site engineer,
technical odce engineer, planning
engineer, planning manager, and
Previous post

Earth moving Equipment function and standard Productivity


February 18, 2013

Next post

Construction Project Manager Job Description


February 19, 2013

You may also like

91% Difference
Power
of between
BI
Planning
Claim
is
Engineers
Specialist
the
cannot
and next
findDelay
level
planning
Analyst
of
jobs!3 data
You March,
analytics
know
2019and
why? visualization
17 20
June, February,
2019 2019

4 COMMENTS
Hasan Jlelaty February 20, 2013 Reply

my favorite website.

Mohamed Kahat April 18, 2013 Reply

Rajoriya Parivar August 4, 2013 Reply

a very breif yet complete information giving site!

TAHER AMMAR June 15, 2015 Reply

thank you
Leave a Reply

Default Comments(4)
Facebook Comments
Google+ Comments

Leave a Reply

Default Comments(4)
Facebook Comments
Google+ Comments

Logged in as Muhammad Iqbal. Log out?

Comment *

% Sign me up for the newsletter!

Post Comment

Search … &
You have logged in. Sign Out

Featured Courses:

Monitoring and Controlling Using Power Bi and Primavera


P6 -PMC
Microsoft Power BI is the future of business intelligence (BI). I have been studying this amazing
software by Microsoft for 1 year and I successfully implemented...

Planning Advanced Package- 3 Professional Courses and


Primavera 50 Tips
This advanced planning Package contains all the required knowledge to boost your career from
junior planning engineer, site engineer with little planning and scheduling skills,...

Data Management and Planning Reporting Skills


Data Management is the key success of construction projects reporting. This self-study course will
teach you using a step by step case study how to...
Planning Courses
FOLLOW US:

! ' (

Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for

Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of

the copyright is unintentional and noncommercial and the material will be removed immediately upon presented

proof.

Planning Courses Planning Jobs Planning Blog

You might also like